X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31325

Well Details

Well ID: 37-005-31325
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Freeport Borough
Operator Name: XTO ENERGY INC
Well Pad ID: 155139
Farm/Lease Name: TRILOGY A 1H
License Status:
Spud Date:
Permit Date: 2018-04-24
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.686839
Longitude: -79.681297

For data sources see[1][2][3]

Well History

Date Event
2018-04-24 New Permit Application
2018-09-17 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 XTO ENERGY INC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 XTO ENERGY INC Drill Cuttings 636.99 Tons LANDFILL 100585
2018 XTO ENERGY INC Drilling Fluid Waste 910.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Other Oil & Gas Wastes 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Drill Cuttings 1,403.26 Tons LANDFILL 100585
2019 XTO ENERGY INC Drill Cuttings 35.27 Tons LANDFILL 100172
2019 XTO ENERGY INC Synthetic Liner Materials 16.85 Tons LANDFILL 100585

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2778286 Primary Facility 2018-09-21 Drilling/Alteration No Violations Noted This well was spudded to 40' and had 40' of 30" pipe installed and cemented back to surface. All equipment on site looked ok.
2778290 Primary Facility 2018-09-21 Drilling/Alteration No Violations Noted This well was spudded to 42' and had 42' of 40" pipe installed and cemented back to surface inside an 8'x10' cellar. All equipment on site looked ok.
2778805 Primary Facility 2018-09-24 Drilling/Alteration No Violations Noted This well was spudded to a depth of 40' and had 40' of 30" conductor pipe cemented to surface inside a cellar which measures 10' in diameter by 8' deep. All equipment on site looked ok.

On this return date, the well bore hole had been deepened to 68' and the Rig had run 68' of 24" pipe, cemented it to surface and covered the well cellar with a steel plate until the next Rig returns to continue the drilling operation. The well log record and all equipment on site looked ok.

2821640 Primary Facility 2019-01-03 Drilling/Alteration No Violations Noted The top hole portion of this well has been drilled and the well casing is capped off waiting on the finishing rig to arrive. The well head casing and all equipment on site looks ok.

For data sources see[7]

References