X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-21554

Well Details

Well ID: 37-019-21554
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Allegheny Township
Operator Name: EM ENERGY PA LLC
Well Pad ID: 147119
Farm/Lease Name: S SHEPPECK 1 207 22
License Status: Plugged and Abandoned
Spud Date: 2008-04-15
Permit Date: 2008-02-14
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: No
Latitude: 41.134370
Longitude: -79.747060

For data sources see[1][2][3]

Well History

Date Event
2008-02-14 New Permit Application
2008-04-14 Performed Spud Operation
2008-04-22 Drilling Completion
2009-03-17 Perforation
2009-03-19 Performed Stimulation
2009-06-17 Newly Drilled
2017-11-04 Finished Plugging
2017-11-08 Begin Plugging

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2009-03-19 Sand 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 BLX INC 13629.50 90 165.00 90 0.00 0
2010 BLX INC 14,987.63 134 0.00 0 315.48 134
2011 BLX INC 18,279.42 182 0.00 0 0.00 0
2012 BLX INC 11,617.76 135 0.00 0 136.68 42
2013 EM ENERGY PA LLC 18,539.34 134 0.00 0 18.60 11
2014 EM ENERGY PA LLC 9,050.00 197 0.00 0 0.00 0
2015 EM ENERGY PA LLC 0.00 0 0.00 0 0.00 0
2016 EM ENERGY PA LLC 0.00 0 0.00 0 0.00 0
2017 EM ENERGY PA LLC 0.00 0 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 BLX INC Brine 10,810.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010 BLX INC Fracing Fluid Waste 40.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 BLX INC Produced Fluid 40.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 BLX INC Fracing Fluid Waste 5,300.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 BLX INC Produced Fluid 30.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2012 BLX INC Produced Fluid 33.34 Bbl INJECTION DISPOSAL WELL 34-155-23203
2012 BLX INC Produced Fluid 33.33 Bbl INJECTION DISPOSAL WELL 34-155-21894
2012 BLX INC Produced Fluid 133.33 Bbl INJECTION DISPOSAL WELL 34-155-21893
2013 REDMILL DRILLING Produced Fluid 33.33 Bbl INJECTION DISPOSAL WELL 34-155-21893
2013 REDMILL DRILLING Produced Fluid 33.34 Bbl INJECTION DISPOSAL WELL 34-155-23203
2013 REDMILL DRILLING Produced Fluid 33.33 Bbl INJECTION DISPOSAL WELL 34-155-21894

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1699545 Primary Facility 2008-04-16 Drilling/Alteration No Violations Noted
1708976 Primary Facility 2008-05-15 Routine/Complete Inspection No Violations Noted
1713522 Primary Facility 2008-06-05 Routine/Complete Inspection No Violations Noted
1740445 Primary Facility 2008-10-03 Routine/Complete Inspection No Violations Noted
1777192 Primary Facility 2009-03-19 Drilling/Alteration No Violations Noted
1901911 Primary Facility 2010-07-27 Routine/Complete Inspection No Violations Noted
2375860 Primary Facility 2015-06-03 Routine/Partial Inspection No Violations Noted
2658398 Primary Facility 2017-11-08 Plugging(Includes Plugged/Mined Through) No Violations Noted Killing the well with 9.2 brine.
2662741 Primary Facility 2017-11-14 Plugging(Includes Plugged/Mined Through) No Violations Noted At the time of inspection, NWP has completed the cementing portion of the plug job. Top of cement was tagged at 395'. Cement was added from TD (5610') to 5000'. A Cast Iron Bridge Plug (CIBP) was installed at 5000'. Gel was then placed from 5000'-3800'. The 4 1/2" casing was then cut at 3700' and was pulled up. Cementing was through tubing, but 4 1/2" was used as well. A cement plug was placed over the CIBP from 3800'-3500'. Gel was then added from here up to 2450'. Another cement plug was placed from here up to 1850'. More gel was added from 1850'-1650'. Cement was then placed from here, up into the 7" casing to 1480'. The 7" casing shoe was at 1536'. At 1480', another CIBP was set. Gel was added over this up to 495', which is 100' below the 9 5/8" surface casing. A cement plug was set from 495' to 395'. Casing will need emptied of liquids and a vent installed yet.
2671004 Primary Facility 2017-12-14 Administrative/File Review No Violations Noted

For data sources see[8]

References