If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-21554 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.13437,"lon":-79.74706,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Allegheny Township | |
Operator Name: EM ENERGY PA LLC | |
Well Pad ID: 147119 | |
Farm/Lease Name: S SHEPPECK 1 207 22 | |
License Status: Plugged and Abandoned | |
Spud Date: 2008-04-15 | |
Permit Date: 2008-02-14 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.134370 | |
Longitude: -79.747060 |
Date | Event |
---|---|
2008-02-14 | New Permit Application |
2008-04-14 | Performed Spud Operation |
2008-04-22 | Drilling Completion |
2009-03-17 | Perforation |
2009-03-19 | Performed Stimulation |
2009-06-17 | Newly Drilled |
2017-11-04 | Finished Plugging |
2017-11-08 | Begin Plugging |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2009-03-19 | Sand | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | BLX INC | 13629.50 | 90 | 165.00 | 90 | 0.00 | 0 |
2010 | BLX INC | 14,987.63 | 134 | 0.00 | 0 | 315.48 | 134 |
2011 | BLX INC | 18,279.42 | 182 | 0.00 | 0 | 0.00 | 0 |
2012 | BLX INC | 11,617.76 | 135 | 0.00 | 0 | 136.68 | 42 |
2013 | EM ENERGY PA LLC | 18,539.34 | 134 | 0.00 | 0 | 18.60 | 11 |
2014 | EM ENERGY PA LLC | 9,050.00 | 197 | 0.00 | 0 | 0.00 | 0 |
2015 | EM ENERGY PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | EM ENERGY PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | EM ENERGY PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | BLX INC | Brine | 10,810.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
2010 | BLX INC | Fracing Fluid Waste | 40.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | BLX INC | Produced Fluid | 40.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | BLX INC | Fracing Fluid Waste | 5,300.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | BLX INC | Produced Fluid | 30.00 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2012 | BLX INC | Produced Fluid | 33.34 Bbl | INJECTION DISPOSAL WELL | 34-155-23203 |
2012 | BLX INC | Produced Fluid | 33.33 Bbl | INJECTION DISPOSAL WELL | 34-155-21894 |
2012 | BLX INC | Produced Fluid | 133.33 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2013 | REDMILL DRILLING | Produced Fluid | 33.33 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2013 | REDMILL DRILLING | Produced Fluid | 33.34 Bbl | INJECTION DISPOSAL WELL | 34-155-23203 |
2013 | REDMILL DRILLING | Produced Fluid | 33.33 Bbl | INJECTION DISPOSAL WELL | 34-155-21894 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1699545 | Primary Facility | 2008-04-16 | Drilling/Alteration | No Violations Noted | |
1708976 | Primary Facility | 2008-05-15 | Routine/Complete Inspection | No Violations Noted | |
1713522 | Primary Facility | 2008-06-05 | Routine/Complete Inspection | No Violations Noted | |
1740445 | Primary Facility | 2008-10-03 | Routine/Complete Inspection | No Violations Noted | |
1777192 | Primary Facility | 2009-03-19 | Drilling/Alteration | No Violations Noted | |
1901911 | Primary Facility | 2010-07-27 | Routine/Complete Inspection | No Violations Noted | |
2375860 | Primary Facility | 2015-06-03 | Routine/Partial Inspection | No Violations Noted | |
2658398 | Primary Facility | 2017-11-08 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Killing the well with 9.2 brine. |
2662741 | Primary Facility | 2017-11-14 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | At the time of inspection, NWP has completed the cementing portion of the plug job. Top of cement was tagged at 395'. Cement was added from TD (5610') to 5000'. A Cast Iron Bridge Plug (CIBP) was installed at 5000'. Gel was then placed from 5000'-3800'. The 4 1/2" casing was then cut at 3700' and was pulled up. Cementing was through tubing, but 4 1/2" was used as well. A cement plug was placed over the CIBP from 3800'-3500'. Gel was then added from here up to 2450'. Another cement plug was placed from here up to 1850'. More gel was added from 1850'-1650'. Cement was then placed from here, up into the 7" casing to 1480'. The 7" casing shoe was at 1536'. At 1480', another CIBP was set. Gel was added over this up to 495', which is 100' below the 9 5/8" surface casing. A cement plug was set from 495' to 395'. Casing will need emptied of liquids and a vent installed yet. |
2671004 | Primary Facility | 2017-12-14 | Administrative/File Review | No Violations Noted |
For data sources see[8]