X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22493

Well Details

Well ID: 37-019-22493
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Jefferson Township
Operator Name: XTO ENERGY INC
Well Pad ID: 153110
Farm/Lease Name: KILEY A UNIT 1H
License Status:
Spud Date:
Permit Date: 2015-10-26
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.811158
Longitude: -79.791725

For data sources see[1][2][3]

Well History

Date Event
2015-10-26 New Permit Application
2015-12-21 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-06-29 2016-07-16 6,222 11,803,900 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water XTO Energy/ExxonMobil Carrier Fluid Water 7732-18-5 100 89.3063 0
HC-7.5 C&J Well Services Bulk Acid Listed Below
BIO-CLEAR 2000 C&J Well Services Biocides Listed Below
SI-6 PA-Only C&J Well Services PA-Proprietary Listed Below
Sand C&J Well Services Sand - Bulk - Pennsylvania Listed Below
HC-15 C&J Well Services Bulk Acid Listed Below
FR-16 PA-Only C&J Well Services PA-Proprietary Listed Below
CI-3 C&J Well Services Acid Corrosion Inhibitors Listed Below
Ammonium Chloride 12125-02-9 2 0.000366 0
CJENERGY-Polymer-00024 Proprietary 35 0.034398 0
Dimethylformamide 68-12-2 20 0.000222 0
2-Propenamide as residual 79-06-1 0.1 0.00009800 0
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 15 0.000166 0
Triethyl Phosphate 78-40-0 2.5 0.00002800 0
Iron Oxide 1309-37-1 0.1 0.005681 0
1-OCTANOL 111-87-5 2.5 0.00002800 0
Ethylene Glycol 107-21-1 5 0.004914 0
Titanium Oxide 13463-67-7 0.1 0.005681 0
2-Butoxyethanol 111-76-2 15 0.000166 0
Distillates (Petroleum), Hydrotreated Light 64742-47-8 45 0.044226 0
Cinnamaldehyde 104-55-2 15 0.000166 0
1-DECANOL 112-30-1 5 0.00005500 0
Titanium Oxide 13463-67-7 0.1 0.002732 0
Aluminum Oxide 1344-28-1 1.1 0.062488 0
Titanium Oxide 13463-67-7 0.1 0.000961 0
Monoethanolamine hydrochloride 2002-24-6 2 0.000366 0
Water 7732-18-5 96 0.017571 0
CJENERGY-Phosphate-00040 Proprietary 6 0.001098 0
Water 7732-18-5 85 0.036978 0
Water 7732-18-5 31 0.030467 0
2,2-Dibromo-3-nitrilo-propionamide (DBNPA) 10222-01-2 30 0.006009 0
Hydrochloric Acid 7647-01-0 15 0.006526 0
Iron Oxide 1309-37-1 0.1 0.002732 0
Aluminum Oxide 1344-28-1 1.1 0.010569 0
Isopropyl Alcohol 67-63-0 2.5 0.00002800 0
Crystalline Silica, quartz 14808-60-7 99.9 0.959828 0
Aluminum Oxide 1344-28-1 1.1 0.030053 0
Crystalline Silica, quartz 14808-60-7 99.9 5.67503 0
CJENERGY-Surfactant-00025 Proprietary 3 0.002948 0
Methanol 67-56-1 1 0.000183 0
CJENERGY-Surfactant-00026 Proprietary 1 0.000983 0
Iron Oxide 1309-37-1 0.1 0.000961 0
Hydrochloric Acid 7647-01-0 7.5 0.085419 0
Crystalline Silica, quartz 14808-60-7 99.9 2.72933 0
Poly(oxy-1,2-ethanediyl), a-hydro-w-hydroxy-,
mono-C10-14-alkyl esthers, phosphates
68585-36-4 3 0.002948 0
Nonyphenol (branched), ethoxylated 127087-87-0 5 0.00005500 0
Water 7732-18-5 92.5 1.0535 0
Alcohols, C12-18, ethoxylated propoxylated 69227-21-0 2 0.001966 0
Ethylene Glycol 107-21-1 40 0.000444 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2016 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2017 XTO ENERGY INC 1,008,170.00 281 0.00 0 38.34 92
2018 XTO ENERGY INC 992,822.05 355 0.00 0 0.00 0
2019 XTO ENERGY INC 762,375.92 318 0.00 0 1.25 30

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 XTO ENERGY INC Drill Cuttings 1,276.90 Tons LANDFILL 100585
2016 XTO ENERGY INC Fracturing Fluid Waste 5,780.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 XTO ENERGY INC Fracturing Fluid Waste 340.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Fracturing Fluid Waste 88.78 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2017 XTO ENERGY INC Produced Fluid 2,776.50 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 522.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 2,414.82 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 3,046.41 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 13,932.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 326.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 312.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2018 XTO ENERGY INC Produced Fluid 6,222.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 3,117.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 1,708.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 993.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 639.00 Bbl INJECTION DISPOSAL WELL 34-133-24189

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2437125 Primary Facility 2015-12-29 Routine/Partial Inspection No Violations Noted
2442740 Primary Facility 2016-01-14 Drilling/Alteration No Violations Noted
2442742 Primary Facility 2016-01-20 Drilling/Alteration No Violations Noted
2442743 Primary Facility 2016-01-25 Routine/Partial Inspection No Violations Noted
2535869 Primary Facility 2016-11-14 Administrative/File Review No Violations Noted
2711894 Primary Facility 2018-03-29 Routine/Partial Inspection No Violations Noted On site for a Routine Partial inspection

One drilled and completed well in production. Well tag in place. Wellhead is protected with fencing and jersey barriers.

Production equipment (tanks & GPU) on containment. Combustor on site and a gathering pipeline is connected to the well.

PCSM plan implemented and PCSM BMPs installed. Site is 100% vegetated.

For data sources see[8]

References