If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22648 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.914439,"lon":-80.015403,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Franklin Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 152218 | |
Farm/Lease Name: CLAIR CRATTY B UNIT 5H | |
License Status: | |
Spud Date: | |
Permit Date: 2017-09-08 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.914439 | |
Longitude: -80.015403 |
Date | Event |
---|---|
2017-09-08 | New Permit Application |
2017-09-18 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-02 | 2018-03-22 | 5,524 | 14,806,600 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SI-6 PA-Only | C&J Energy Services | PA-Proprietary | Listed Below | Listed Below | 0 | 0 | 0 |
CI-3 | C&J Energy Services | Acid Corrosion Inhibitors | Listed Below | Listed Below | 0 | 0 | 0 | |
HC-7.5 | C&J Energy Services | Bulk Acid | Listed Below | Listed Below | 0 | 0 | 0 | |
PA Specific 40/70 mesh Sand | C&J Energy Services | Sand - Bulk - Pennsylvania | Listed Below | Listed Below | 0 | 0 | 0 | |
FR-16 | C&J Energy Services | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
PA Specific 100 mesh Sand | C&J Energy Services | Sand - Bulk - Pennsylvania | Listed Below | Listed Below | 0 | 0 | 0 | |
HC-15 | C&J Energy Services | Bulk Acid | Listed Below | Listed Below | 0 | 0 | 0 | |
FR-27 | C&J Energy Services | PA-Proprietary | Listed Below | Listed Below | 0 | 0 | 0 | |
HC-10 | C&J Energy Services | Bulk Acid | Listed Below | Listed Below | 0 | 0 | 0 | |
BIO-CLEAR 2000 | C&J Energy Services | Biocides | Listed Below | Listed Below | 0 | 0 | 0 | |
PA Specific 30/50 mesh Sand | C&J Energy Services | Sand - Bulk - Pennsylvania | Listed Below | Listed Below | 0 | 0 | 0 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.00958 | 0 | ||||
Monoethanolamine hydrochloride | 2002-24-6 | 2 | 0.000379 | 0 | ||||
Ethylene Glycol | 107-21-1 | 5 | 0.003161 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.015746 | 0 | ||||
Sodium Sulfate | 7757-82-6 | 1 | 0.00005600 | 0 | ||||
Ethoxylated Sorbitan Monooleate | 9005-65-6 | 1 | 0.000632 | 0 | ||||
CJENERGY-Polymer-43 | Proprietary | 30 | 0.001695 | 0 | ||||
Dimethylformamide | 68-12-2 | 20 | 0.000383 | 0 | ||||
2-Propenoic acid, polymer with 2-propenamide, sodium salt | 25987-30-8 | 30 | 0.018965 | 0 | ||||
1-DECANOL | 112-30-1 | 5 | 0.00009600 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 3.65268 | 0 | ||||
2,2-Dibromo-3-nitrilo-propionamide (DBNPA) | 10222-01-2 | 30 | 0.006026 | 0 | ||||
Poly(oxy-1,2-ethanediyl),alpha-(4-nonylphenyl)-omega hydroxy-, branched |
127087-87-0 | 5 | 0.00009600 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 2.3881 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.026295 | 0 | ||||
2-Butoxyethanol | 111-76-2 | 15 | 0.000287 | 0 | ||||
Crystalline Silica, quartz | 14808-60-7 | 99.9 | 1.43004 | 0 | ||||
Urea | 57-13-6 | 5 | 0.000282 | 0 | ||||
Water | 7732-18-5 | 92.5 | 0.893174 | 0 | ||||
Acrylamide as residual | 79-06-1 | 0 | 0 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.001431 | 0 | ||||
1-OCTANOL | 111-87-5 | 2.5 | 0.00004800 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.00239 | 0 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.000766 | 0 | ||||
Water | 7732-18-5 | 96 | 0.018205 | 0 | ||||
Water | 7732-18-5 | 100 | 0.00565 | 0 | ||||
Tar Bases, Quinoline Derivs. | 68513-87-1 | 1 | 0.00001900 | 0 | ||||
Ammonium Chloride | 12125-02-9 | 2 | 0.000379 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.003656 | 0 | ||||
Ammonium Sulfate | 7783-20-2 | 30 | 0.001695 | 0 | ||||
Triethyl Phosphate | 78-40-0 | 2.5 | 0.00004800 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.003656 | 0 | ||||
Sodium Acetate Anhydrous | 127-09-3 | 3 | 0.001896 | 0 | ||||
Titanium Oxide | 13463-67-7 | 0.1 | 0.00239 | 0 | ||||
2-Propenamide as residual | 79-06-1 | 0.1 | 0.00006300 | 0 | ||||
Methanol | 67-56-1 | 1 | 0.00019 | 0 | ||||
Isopropanol | 67-63-0 | 2.5 | 0.00004800 | 0 | ||||
CJENERGY-Phosphate-00040 | Proprietary | 6 | 0.001138 | 0 | ||||
Water | 7732-18-5 | 28.5 | 0.005724 | 0 | ||||
Water | 7732-18-5 | 85 | 0.054285 | 0 | ||||
Alcohols, C12-15-branched and linear, ethoxylated propoxylated |
120313-48-6 | 2 | 0.001264 | 0 | ||||
Water | 7732-18-5 | 30 | 0.000574 | 0 | ||||
Cinnamaldehyde | 104-55-2 | 15 | 0.000287 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 15 | 0.000287 | 0 | ||||
Polyethylene glycol | 25322-68-3 | 50 | 0.010043 | 0 | ||||
Water | 7732-18-5 | 30 | 0.018965 | 0 | ||||
CJENERGY-Anionic Polymer-44 | Proprietary | 5 | 0.000282 | 0 | ||||
Hydrochloric Acid | 7647-01-0 | 10 | 0.001836 | 0 | ||||
Sorbitan Monooleate | 1338-43-8 | 2 | 0.001264 | 0 | ||||
Iron Oxide | 1309-37-1 | 0.1 | 0.001431 | 0 | ||||
Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 35 | 0.022126 | 0 | ||||
Water | 7732-18-5 | 90 | 0.016522 | 0 | ||||
Poly(oxy-1,2-ethandiyl), alpha-isodecyl-omega-hydroxy-phosphat e |
108818-88-8 | 2 | 0.001264 | 0 | ||||
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.072419 | 0 | ||||
Aluminum Oxide | 1344-28-1 | 1.1 | 0.04022 | 0 | ||||
Water | XTO Energy/ExxonMobil | Carrier Fluid | Water | 7732-18-5 | 100 | 91.3641 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 190,125.73 | 75 | 0.00 | 0 | 2,136.43 | 75 |
2019 | XTO ENERGY INC | 1,628,913.83 | 364 | 0.00 | 0 | 12,176.53 | 364 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | XTO ENERGY INC | Drilling Fluid Waste | 500.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Drill Cuttings | 343.00 Tons | LANDFILL | 100585 |
2018 | XTO ENERGY INC | Produced Fluid | 240.95 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 167.29 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 105.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Synthetic Liner Materials | 7.06 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2018 | XTO ENERGY INC | Synthetic Liner Materials | 18.63 Tons | LANDFILL | 100585 |
2018 | XTO ENERGY INC | Drill Cuttings | 769.62 Tons | LANDFILL | 100585 |
2018 | XTO ENERGY INC | Synthetic Liner Materials | 4.99 Tons | LANDFILL | 100434 |
2018 | XTO ENERGY INC | Waste Water Treatment Sludge | 35.49 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2018 | XTO ENERGY INC | Produced Fluid | 3,349.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 3,501.31 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 3,404.55 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 5,001.34 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 10,487.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2639167 | Primary Facility | 2017-09-18 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, Soilmec is onsite using an auger rig to drill out cellar on the 3H well. Cellar for this well is set, but not cemented yet. This should take place today. Hole for conductor has not been started yet so well has not been technically spud yet. There is a tank onsite where cuttings are being placed. Permit and Emergency Response signs are posted at the entrance to the pad. Along the access road there are sound walls that are 2 panels high. Entering the well pad, there are sound walls 4 panels high in the one corner closest to houses. |
2640676 | Primary Facility | 2017-09-20 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, conductor for well has been set. 24" was set to 40'. This has been cemented into place. Well is now covered with a steel plate. Mouse hole was set beside the well. |
2652307 | Primary Facility | 2017-10-19 | Drilling/Alteration | No Violations Noted | At the time of inspection, Appalachian Drillers 1 was performing a casing test of 1750 psi for 30 minutes. They plan to drill down to 5586' on a 29 degree tangent, if they can.
Surface casing cemented using 490 sxs (83 bbls) Class A,2% CaCl2, 2% Gypsum, 15.6 ppg, 1.22 yield. Displaced with 83 bbls. Plug did not bump, but floats held and 30 bbls cement returned to surface. A float shoe and float collar (top at 517') were used along with 5 centralizers. Intermediate casing was cemented using 695 sxs (151 bbls) Class A, 2% Gypsum, 2% CaCl2, 15.6 ppg, 1.22 yield. Displaced with a total of 546 bbls freshwater and did not bump plug. Floats held and 26 bbls cement returned to surface. A float shoe and float collar (top at 1970') were used along with 15 centralizers. 25 GPM freshwater encountered at 75'. Circulation was not lost while drilling either section. Containment was in good condition. |
2684504 | Primary Facility | 2018-01-22 | Administrative/File Review | No Violations Noted | |
2684617 | Primary Facility | 2018-01-22 | Administrative/File Review | No Violations Noted | |
2685459 | Primary Facility | 2018-01-23 | Drilling/Alteration | No Violations Noted | Cement job finished at 12:30. Starting to rig down and clean for move to next well pad. |
2687360 | Primary Facility | 2018-01-18 | Drilling/Alteration | No Violations Noted | At the time of inspection, Nomac 79 was onsite drilling 8 3/4" hole. OBM and fuel within double containment with high walled berms. All chemicals and equipment on containment. Quite a bit of snow and ice remains. BOP had been tested on 1/17. |
2689478 | Primary Facility | 2018-01-30 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, no activity was taking place on the pad. Some drill pipe remained on the pipe racks. There were also a few roll offs and frac tanks on the pad. Containment has been removed and was sitting in the dumpsters. Site was covered with snow, but I did not see any indication of any environmental concerns. Well or pit were not covered and everything looked good. |
2695530 | Primary Facility | 2018-02-20 | Administrative/File Review | No Violations Noted | |
2697455 | Primary Facility | 2018-02-23 | Routine/Partial Inspection | No Violations Noted | On site for a routine partial inspection.
Stimulation operations underway at time of inspection. Inspected pad liner, secondary containments, AST, well development pipeline, E/S controls, waste management, and storage tanks. Operator reported that flow back operations were underway at time of inspection and there were about 100 stages left in the stimulation. I observed flow back water transfer operations for a period of time while on site. Heavy rain event while on site. |
2700776 | Primary Facility | 2018-03-05 | Administrative/File Review | No Violations Noted | |
2703417 | Primary Facility | 2018-03-06 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, C & J was onsite stimulating well. This well has had 12 stages completed. The 13th stage was just started. They are only stimulating one well at a time.
Decibel readings taken by OGIS were as follows: 75 dB inside of sound walls 65 dB just outside of sound walls 55 dB at the property line This is slightly less than before the additional sound wall was installed. Complaint ID is 332468 |
2704898 | Primary Facility | 2018-03-12 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, C & J was onsite setting up to perf stage 15 on the 3H well. This well has had 26 stages completed. Stimulating had been shut down on Saturday because operator had finished stage 26 on the 5H well and wanted to complete more on the 3H.
Company man stated that more sound walls were going to be installed on the western side of the pad, near where access road meets the pad, then over to corner of pad where existing walls are in place. They expect them to be set up by tomorrow. Complaint ID is 332468 |
2709545 | Primary Facility | 2018-03-19 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, C & J was onsite, but no stimulation was occurring. This well has had 33 of the 44 stages completed. Company Production Superintendent said that they hope to be done with all stimulation stages by Thursday or Friday. |
2727916 | Primary Facility | 2018-05-09 | Administrative/File Review | No Violations Noted | |
2742625 | Primary Facility | 2018-06-14 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well is still being worked on to be brought into production. Well has a Christmas tree installed on it, but the flow line has yet to be hooked up. There were some workers on the pad doing this, but it didn't appear that it would be completed for a few more days. There has be no earth moving activities yet. Cellar has been filled in to surface with gravel. 4 tanks and 3 line heaters have been placed within lined, steel dikes. The pipeline work is continuing off in the distance from the pad. |
2760330 | Primary Facility | 2018-08-02 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well remains shut in until pipeline is completed to the pad. Company representative stated that this could take a few more weeks. All of the piping needed to produce on the pad has been completed flow lines, emergency shut off valves). More stone had been added and reworked. 4 tanks are set within a lined, steel dike and 3 line heaters within another dike. A gas buster has also been installed.
No activity was taking place during inspection. There were 2 frac tanks that remained on the pad. |
2803541 | Primary Facility | 2018-11-14 | Routine/Partial Inspection | No Violations Noted | On site for a routine partial inspection.
Well drilled, completed, and in production. Well tag in place. Well protected by fencing and jersey barriers. Production equipment set (production tanks and GPUs) in secondary containment. Combustor installed. Gathering pipeline installed. Site stabilized, PCSM BMPs installed and 100% vegetated. |
For data sources see[8]