X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22648

Well Details

Well ID: 37-019-22648
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Franklin Township
Operator Name: XTO ENERGY INC
Well Pad ID: 152218
Farm/Lease Name: CLAIR CRATTY B UNIT 5H
License Status:
Spud Date:
Permit Date: 2017-09-08
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.914439
Longitude: -80.015403

For data sources see[1][2][3]

Well History

Date Event
2017-09-08 New Permit Application
2017-09-18 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-02 2018-03-22 5,524 14,806,600 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SI-6 PA-Only C&J Energy Services PA-Proprietary Listed Below Listed Below 0 0 0
CI-3 C&J Energy Services Acid Corrosion Inhibitors Listed Below Listed Below 0 0 0
HC-7.5 C&J Energy Services Bulk Acid Listed Below Listed Below 0 0 0
PA Specific 40/70 mesh Sand C&J Energy Services Sand - Bulk - Pennsylvania Listed Below Listed Below 0 0 0
FR-16 C&J Energy Services Friction Reducer Listed Below Listed Below 0 0 0
PA Specific 100 mesh Sand C&J Energy Services Sand - Bulk - Pennsylvania Listed Below Listed Below 0 0 0
HC-15 C&J Energy Services Bulk Acid Listed Below Listed Below 0 0 0
FR-27 C&J Energy Services PA-Proprietary Listed Below Listed Below 0 0 0
HC-10 C&J Energy Services Bulk Acid Listed Below Listed Below 0 0 0
BIO-CLEAR 2000 C&J Energy Services Biocides Listed Below Listed Below 0 0 0
PA Specific 30/50 mesh Sand C&J Energy Services Sand - Bulk - Pennsylvania Listed Below Listed Below 0 0 0
Hydrochloric Acid 7647-01-0 15 0.00958 0
Monoethanolamine hydrochloride 2002-24-6 2 0.000379 0
Ethylene Glycol 107-21-1 5 0.003161 0
Aluminum Oxide 1344-28-1 1.1 0.015746 0
Sodium Sulfate 7757-82-6 1 0.00005600 0
Ethoxylated Sorbitan Monooleate 9005-65-6 1 0.000632 0
CJENERGY-Polymer-43 Proprietary 30 0.001695 0
Dimethylformamide 68-12-2 20 0.000383 0
2-Propenoic acid, polymer with 2-propenamide, sodium salt 25987-30-8 30 0.018965 0
1-DECANOL 112-30-1 5 0.00009600 0
Crystalline Silica, quartz 14808-60-7 99.9 3.65268 0
2,2-Dibromo-3-nitrilo-propionamide (DBNPA) 10222-01-2 30 0.006026 0
Poly(oxy-1,2-ethanediyl),alpha-(4-nonylphenyl)-omega
hydroxy-, branched
127087-87-0 5 0.00009600 0
Crystalline Silica, quartz 14808-60-7 99.9 2.3881 0
Aluminum Oxide 1344-28-1 1.1 0.026295 0
2-Butoxyethanol 111-76-2 15 0.000287 0
Crystalline Silica, quartz 14808-60-7 99.9 1.43004 0
Urea 57-13-6 5 0.000282 0
Water 7732-18-5 92.5 0.893174 0
Acrylamide as residual 79-06-1 0 0 0
Titanium Oxide 13463-67-7 0.1 0.001431 0
1-OCTANOL 111-87-5 2.5 0.00004800 0
Iron Oxide 1309-37-1 0.1 0.00239 0
Ethylene Glycol 107-21-1 40 0.000766 0
Water 7732-18-5 96 0.018205 0
Water 7732-18-5 100 0.00565 0
Tar Bases, Quinoline Derivs. 68513-87-1 1 0.00001900 0
Ammonium Chloride 12125-02-9 2 0.000379 0
Titanium Oxide 13463-67-7 0.1 0.003656 0
Ammonium Sulfate 7783-20-2 30 0.001695 0
Triethyl Phosphate 78-40-0 2.5 0.00004800 0
Iron Oxide 1309-37-1 0.1 0.003656 0
Sodium Acetate Anhydrous 127-09-3 3 0.001896 0
Titanium Oxide 13463-67-7 0.1 0.00239 0
2-Propenamide as residual 79-06-1 0.1 0.00006300 0
Methanol 67-56-1 1 0.00019 0
Isopropanol 67-63-0 2.5 0.00004800 0
CJENERGY-Phosphate-00040 Proprietary 6 0.001138 0
Water 7732-18-5 28.5 0.005724 0
Water 7732-18-5 85 0.054285 0
Alcohols, C12-15-branched and linear,
ethoxylated propoxylated
120313-48-6 2 0.001264 0
Water 7732-18-5 30 0.000574 0
Cinnamaldehyde 104-55-2 15 0.000287 0
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 15 0.000287 0
Polyethylene glycol 25322-68-3 50 0.010043 0
Water 7732-18-5 30 0.018965 0
CJENERGY-Anionic Polymer-44 Proprietary 5 0.000282 0
Hydrochloric Acid 7647-01-0 10 0.001836 0
Sorbitan Monooleate 1338-43-8 2 0.001264 0
Iron Oxide 1309-37-1 0.1 0.001431 0
Distillates (Petroleum), Hydrotreated Light 64742-47-8 35 0.022126 0
Water 7732-18-5 90 0.016522 0
Poly(oxy-1,2-ethandiyl), alpha-isodecyl-omega-hydroxy-phosphat
e
108818-88-8 2 0.001264 0
Hydrochloric Acid 7647-01-0 7.5 0.072419 0
Aluminum Oxide 1344-28-1 1.1 0.04022 0
Water XTO Energy/ExxonMobil Carrier Fluid Water 7732-18-5 100 91.3641 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2018 XTO ENERGY INC 190,125.73 75 0.00 0 2,136.43 75
2019 XTO ENERGY INC 1,628,913.83 364 0.00 0 12,176.53 364

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 XTO ENERGY INC Drilling Fluid Waste 500.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Drill Cuttings 343.00 Tons LANDFILL 100585
2018 XTO ENERGY INC Produced Fluid 240.95 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 167.29 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 105.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XTO ENERGY INC Synthetic Liner Materials 7.06 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2018 XTO ENERGY INC Synthetic Liner Materials 18.63 Tons LANDFILL 100585
2018 XTO ENERGY INC Drill Cuttings 769.62 Tons LANDFILL 100585
2018 XTO ENERGY INC Synthetic Liner Materials 4.99 Tons LANDFILL 100434
2018 XTO ENERGY INC Waste Water Treatment Sludge 35.49 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2018 XTO ENERGY INC Produced Fluid 3,349.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 3,501.31 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 3,404.55 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 5,001.34 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 10,487.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2639167 Primary Facility 2017-09-18 Routine/Partial Inspection No Violations Noted At the time of inspection, Soilmec is onsite using an auger rig to drill out cellar on the 3H well. Cellar for this well is set, but not cemented yet. This should take place today. Hole for conductor has not been started yet so well has not been technically spud yet. There is a tank onsite where cuttings are being placed. Permit and Emergency Response signs are posted at the entrance to the pad. Along the access road there are sound walls that are 2 panels high. Entering the well pad, there are sound walls 4 panels high in the one corner closest to houses.
2640676 Primary Facility 2017-09-20 Routine/Partial Inspection No Violations Noted At the time of inspection, conductor for well has been set. 24" was set to 40'. This has been cemented into place. Well is now covered with a steel plate. Mouse hole was set beside the well.
2652307 Primary Facility 2017-10-19 Drilling/Alteration No Violations Noted At the time of inspection, Appalachian Drillers 1 was performing a casing test of 1750 psi for 30 minutes. They plan to drill down to 5586' on a 29 degree tangent, if they can.

Surface casing cemented using 490 sxs (83 bbls) Class A,2% CaCl2, 2% Gypsum, 15.6 ppg, 1.22 yield. Displaced with 83 bbls. Plug did not bump, but floats held and 30 bbls cement returned to surface. A float shoe and float collar (top at 517') were used along with 5 centralizers.

Intermediate casing was cemented using 695 sxs (151 bbls) Class A, 2% Gypsum, 2% CaCl2, 15.6 ppg, 1.22 yield. Displaced with a total of 546 bbls freshwater and did not bump plug. Floats held and 26 bbls cement returned to surface. A float shoe and float collar (top at 1970') were used along with 15 centralizers.

25 GPM freshwater encountered at 75'. Circulation was not lost while drilling either section. Containment was in good condition.

2684504 Primary Facility 2018-01-22 Administrative/File Review No Violations Noted
2684617 Primary Facility 2018-01-22 Administrative/File Review No Violations Noted
2685459 Primary Facility 2018-01-23 Drilling/Alteration No Violations Noted Cement job finished at 12:30. Starting to rig down and clean for move to next well pad.
2687360 Primary Facility 2018-01-18 Drilling/Alteration No Violations Noted At the time of inspection, Nomac 79 was onsite drilling 8 3/4" hole. OBM and fuel within double containment with high walled berms. All chemicals and equipment on containment. Quite a bit of snow and ice remains. BOP had been tested on 1/17.
2689478 Primary Facility 2018-01-30 Routine/Partial Inspection No Violations Noted At the time of inspection, no activity was taking place on the pad. Some drill pipe remained on the pipe racks. There were also a few roll offs and frac tanks on the pad. Containment has been removed and was sitting in the dumpsters. Site was covered with snow, but I did not see any indication of any environmental concerns. Well or pit were not covered and everything looked good.
2695530 Primary Facility 2018-02-20 Administrative/File Review No Violations Noted
2697455 Primary Facility 2018-02-23 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Stimulation operations underway at time of inspection.

Inspected pad liner, secondary containments, AST, well development pipeline, E/S controls, waste management, and storage tanks.

Operator reported that flow back operations were underway at time of inspection and there were about 100 stages left in the stimulation.

I observed flow back water transfer operations for a period of time while on site.

Heavy rain event while on site.

2700776 Primary Facility 2018-03-05 Administrative/File Review No Violations Noted
2703417 Primary Facility 2018-03-06 Routine/Partial Inspection No Violations Noted At the time of inspection, C & J was onsite stimulating well. This well has had 12 stages completed. The 13th stage was just started. They are only stimulating one well at a time.

Decibel readings taken by OGIS were as follows: 75 dB inside of sound walls 65 dB just outside of sound walls 55 dB at the property line This is slightly less than before the additional sound wall was installed. Complaint ID is 332468

2704898 Primary Facility 2018-03-12 Routine/Partial Inspection No Violations Noted At the time of inspection, C & J was onsite setting up to perf stage 15 on the 3H well. This well has had 26 stages completed. Stimulating had been shut down on Saturday because operator had finished stage 26 on the 5H well and wanted to complete more on the 3H.

Company man stated that more sound walls were going to be installed on the western side of the pad, near where access road meets the pad, then over to corner of pad where existing walls are in place. They expect them to be set up by tomorrow. Complaint ID is 332468

2709545 Primary Facility 2018-03-19 Routine/Partial Inspection No Violations Noted At the time of inspection, C & J was onsite, but no stimulation was occurring. This well has had 33 of the 44 stages completed. Company Production Superintendent said that they hope to be done with all stimulation stages by Thursday or Friday.
2727916 Primary Facility 2018-05-09 Administrative/File Review No Violations Noted
2742625 Primary Facility 2018-06-14 Routine/Partial Inspection No Violations Noted At the time of inspection, well is still being worked on to be brought into production. Well has a Christmas tree installed on it, but the flow line has yet to be hooked up. There were some workers on the pad doing this, but it didn't appear that it would be completed for a few more days. There has be no earth moving activities yet. Cellar has been filled in to surface with gravel. 4 tanks and 3 line heaters have been placed within lined, steel dikes. The pipeline work is continuing off in the distance from the pad.
2760330 Primary Facility 2018-08-02 Routine/Partial Inspection No Violations Noted At the time of inspection, well remains shut in until pipeline is completed to the pad. Company representative stated that this could take a few more weeks. All of the piping needed to produce on the pad has been completed flow lines, emergency shut off valves). More stone had been added and reworked. 4 tanks are set within a lined, steel dike and 3 line heaters within another dike. A gas buster has also been installed.

No activity was taking place during inspection. There were 2 frac tanks that remained on the pad.

2803541 Primary Facility 2018-11-14 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Well drilled, completed, and in production. Well tag in place. Well protected by fencing and jersey barriers. Production equipment set (production tanks and GPUs) in secondary containment. Combustor installed. Gathering pipeline installed.

Site stabilized, PCSM BMPs installed and 100% vegetated.

For data sources see[8]

References