X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22673

Well Details

Well ID: 37-019-22673
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Allegheny Township
Operator Name: EM ENERGY PA LLC
Well Pad ID: 152989
Farm/Lease Name: SCULPTOR 9-MH
License Status:
Spud Date: 2017-10-07
Permit Date: 2017-08-21
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.125139
Longitude: -79.747839

For data sources see[1][2][3]

Well History

Date Event
Deviated
2017-08-21 New Permit Application
2017-10-07 Performed Spud Operation
2017-12-24 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-05-16 2018-05-31 5,487 14,861,300 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCl, 5.1 - 7.5% BJ Services Acidizing Listed Below
Frac Fluid Package TightROCK Solutions LLC Frac Fluid Additives Listed Below
Sand, White BJ Services Proppant Listed Below
Water BJ Services Carrier Listed Below
HCl, 10.1 - 15% BJ Services Acidizing Listed Below
ResCare IC 300L BJ Services Iron Control Listed Below
Modified Thiourea Polymer 68527-49-1 7 0.00006664 109.576
Formaldehyde 50-00-0 1 0.00000952 15.654
Olefin 64743-02-8 5 0.00004760 78.269
Alcohol Alkoxylates Proprietary 5 0.00345664 5684.02
Methanol 67-56-1 100 0.000951956 1565.37
Water 7732-18-5 92.5 0.524772 862922
Hydrochloric Acid 7647-01-0 15 0.047693 78425.2
Methanol 67-56-1 100 0.000951956 1565.37
Citric Acid 77-92-9 60 0.00248398 4084.59
Water 7732-18-5 100 75.3543 123,911,000.0
Propargyl Alcohol 107-19-7 5 0.00004760 78.269
Glutaraldehyde 111-30-8 30 0.0034053 5599.6
Hydrochloric Acid 7647-01-0 15 0.047693 78425.2
Fatty Acids 61790-12-3 10 0.00009520 156.537
Aliphatic Hydrocarbon Proprietary 30 0.0207399 34104.1
Polyoxyalkylenes 68951-67-7 30 0.000285587 469.612
Propargyl Alcohol 107-19-7 5 0.00004760 78.269
Citric Acid 77-92-9 60 0.00248398 4084.59
Ethylene Glycol 107-21-1 5 0.000557615 916.929
Polyoxyalkylenes 68951-67-7 30 0.000285587 469.612
Fatty Acids 61790-12-3 10 0.00009520 156.537
Crystalline Silica (Quartz) 14808-60-7 100 11.7304 19,289,100.0
Water 7732-18-5 92.5 0.524772 862922
Amine Triphosphate Proprietary 30 0.00334569 5501.57
Sodium Phosphate, Tribasic 7601-54-9 5 0.000557615 916.929
Olefin 64743-02-8 5 0.00004760 78.269
Crystalline Silica (Quartz) 14808-60-7 100 11.7304 19,289,100.0
Modified Thiourea Polymer 68527-49-1 7 0.00006664 109.576
Formaldehyde 50-00-0 1 0.00000952 15.654
CI-14 BJ Services Corrosion Inhibitor Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 EM ENERGY PA LLC 0.00 0 0.00 0 0.00 0
2018 EM ENERGY PA LLC 455,108.05 124 0.00 0 5,977.01 124
2019 EM ENERGY PA LLC 21,556.25 5 0.00 0 1,239.30 5

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 EM ENERGY PA LLC Produced Fluid 103.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EM ENERGY PA LLC Drill Cuttings 21.24 Tons LANDFILL CID # 28726
2017 EM ENERGY PA LLC Other Oil & Gas Wastes 103.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EM ENERGY PA LLC Drilling Fluid Waste 37.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 EM ENERGY PA LLC Drilling Fluid Waste 179.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 EM ENERGY PA LLC Drill Cuttings 852.00 Tons LANDFILL 100585
2018 EM ENERGY PA LLC Produced Fluid 65.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2018 EM ENERGY PA LLC Synthetic Liner Materials 0.64 Tons LANDFILL CID # 28726
2018 EM ENERGY PA LLC Drill Cuttings 291.57 Tons LANDFILL 100585
2018 EM ENERGY PA LLC Drill Cuttings 274.54 Tons LANDFILL CID # 28726
2018 EM ENERGY PA LLC Produced Fluid 2,134.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 EM ENERGY PA LLC Drilling Fluid Waste 51.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 EM ENERGY PA LLC Produced Fluid 2,471.40 Bbl REUSE (AT WELL PAD)
2018 EM ENERGY PA LLC Other Oil & Gas Wastes 15.44 Tons LANDFILL 100585
2018 EM ENERGY PA LLC Drilling Fluid Waste 42.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 EM ENERGY PA LLC Other Oil & Gas Wastes 8.50 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 EM ENERGY PA LLC Soil Contaminated by Oil & Gas Related Spills 2.90 Tons LANDFILL CID # 28726
2018 EM ENERGY PA LLC Produced Fluid 2.17 Bbl RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 EM ENERGY PA LLC Other Oil & Gas Wastes 99.00 Bbl REUSE (AT WELL PAD)
2018 EM ENERGY PA LLC Synthetic Liner Materials 5.98 Tons LANDFILL 100585
2018 EM ENERGY PA LLC Other Oil & Gas Wastes 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 EM ENERGY PA LLC Drilling Fluid Waste 110.50 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 EM ENERGY PA LLC Produced Fluid 4,631.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 EM ENERGY PA LLC Produced Fluid 452.50 Bbl INJECTION DISPOSAL WELL 34-155-24063
2018 EM ENERGY PA LLC Produced Fluid 20.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 EM ENERGY PA LLC Servicing Fluid 1.72 Bbl RESIDUAL WASTE PROCESSING FACILITY 101674
2018 EM ENERGY PA LLC Produced Fluid 4,502.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 EM ENERGY PA LLC Produced Fluid 35.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 EM ENERGY PA LLC Produced Fluid 1.53 Bbl LANDFILL 100585
2019 EM ENERGY PA LLC Soil Contaminated by Oil 0.81 Tons LANDFILL CID # 28726
2019 EM ENERGY PA LLC Produced Fluid 173.00 Bbl INJECTION DISPOSAL WELL 34-155-24063
2019 EM ENERGY PA LLC Produced Fluid 858.00 Bbl REUSE (AT WELL PAD)
2019 EM ENERGY PA LLC Soil Contaminated by Oil & Gas Related Spills 0.81 Tons LANDFILL CID # 28726

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2647389 Primary Facility 2017-10-10 Routine/Partial Inspection No Violations Noted At the time of inspection, HAD was onsite with 2 rotary rigs drilling conductor on the #4MH and #8MH wells. Well has conductor set to 98' GL. Cuttings were being sent to closed top tanks. Manholes on top were left open to vent because air was being used to drill. Rig and air packs were on containment. Cellars have not been set yet. Permits were in Company man's truck. The Emergency Response sign is accurately posted. Permit sign does not have all wells on pad posted. A new sign was going to be made. Copies of permits will be placed in mailbox in the meantime.
2663998 Primary Facility 2017-11-16 Routine/Partial Inspection No Violations Noted At the time of inspection, H & P 521 is waiting on cement from job on 7MH. Surface casing for this well was cemented using 550 sxs Type 1 (118 bbls), 3% CaCl2, 15.6 ppg, 1.2 yield. Displaced with 98 bbls water and bumped plug. 30 bbls cement returned to surface. Floats held. A float shoe and float collar were used along with 9 centralizers. Rig was skid over to the 7 MH from here.
2664013 Primary Facility 2017-11-21 Drilling/Alteration No Violations Noted At the time of inspection, H & P 521 was drilling 12 1/4" intermediate section of the well. Company man stated that drilling has been very dry and there has been no shows of oil or gas noticed. 9 5/8" casing was arriving onsite. Containment appeared to be in good condition. All fuel and chemicals were on containment.
2669170 Primary Facility 2017-11-30 Routine/Partial Inspection No Violations Noted At the time of inspection, H & P 521 has just skid over to the 3MH well. This well had intermediate casing cemented using a lead of 499 sxs Gas Block (138 bbls), 2% CaCl2, 14.5 ppg, 1.55 yield and tail of 187 sxs Gas Block (43 bbls), 2% CaCl2, 15.7 ppg, 1.29 yield. This was displaced with 188 bbls water. Plug did not bump. Another bbl of water was pumped and plug landed. Float held. 30 bbls cement back to surface. A guide shoe and float collar were used, along with 28 centralizers.
2675361 Primary Facility 2017-12-27 Routine/Partial Inspection No Violations Noted Received copy of cementing information while doing DRALT inspection of Sculpter 10-MH.
2675370 Primary Facility 2017-12-21 Drilling/Alteration No Violations Noted At the time of inspection, H & P 521 is onsite drilling 8 3/4" hole on air. They should reach KOP this afternoon and switch over to oil-based mud. They will also swap to a 8 1/2" bit at this point too. Containment appeared in good condition.
2687676 Primary Facility 2018-01-29 Administrative/File Review No Violations Noted
2730068 Primary Facility 2018-05-15 Administrative/File Review No Violations Noted
2759472 Primary Facility 2018-08-02 Administrative/File Review No Violations Noted

For data sources see[8]

References