X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22697

Well Details

Well ID: 37-019-22697
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Connoquenessing Township
Operator Name: XTO ENERGY INC
Well Pad ID: 154247
Farm/Lease Name: LESNEY UNIT
License Status: Active
Spud Date: 2018-01-24
Permit Date: 2017-11-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.880494
Longitude: -79.978133

For data sources see[1][2][3]

Well History

Date Event
2017-11-16 New Permit Application
2018-01-24 Performed Spud Operation
2018-03-16 Drilling Completion
2018-04-20 Perforation
2018-04-20 Performed Stage 1 of Stimulation
2018-04-20 Performed Stage 2 of Stimulation
2018-04-20 Performed Stage 3 of Stimulation
2018-04-21 Performed Stage 4 of Stimulation
2018-04-21 Performed Stage 5 of Stimulation
2018-04-21 Performed Stage 6 of Stimulation
2018-04-21 Performed Stage 7 of Stimulation
2018-04-22 Perforation
2018-04-22 Performed Stage 10 of Stimulation
2018-04-22 Performed Stage 8 of Stimulation
2018-04-22 Performed Stage 9 of Stimulation
2018-04-23 Performed Stage 11 of Stimulation
2018-04-23 Performed Stage 12 of Stimulation
2018-04-24 Performed Stage 13 of Stimulation
2018-04-24 Performed Stage 14 of Stimulation
2018-04-24 Performed Stage 15 of Stimulation
2018-04-25 Performed Stage 16 of Stimulation
2018-04-25 Performed Stage 17 of Stimulation
2018-04-25 Performed Stage 18 of Stimulation
2018-04-26 Perforation
2018-04-26 Performed Stage 19 of Stimulation
2018-04-26 Performed Stage 20 of Stimulation
2018-04-26 Performed Stage 22 of Stimulation
2018-04-26 Performed Stage 23 of Stimulation
2018-04-27 Performed Stage 24 of Stimulation
2018-04-27 Performed Stage 25 of Stimulation
2018-04-27 Performed Stage 26 of Stimulation
2018-04-27 Performed Stage 27 of Stimulation
2018-04-27 Performed Stage 28 of Stimulation
2018-04-28 Performed Stage 29 of Stimulation
2018-04-28 Performed Stage 30 of Stimulation
2018-04-28 Performed Stage 31 of Stimulation
2018-04-28 Performed Stage 32 of Stimulation
2018-04-29 Performed Stage 33 of Stimulation
2018-04-29 Performed Stage 34 of Stimulation
2018-04-29 Performed Stage 35 of Stimulation
2018-04-29 Performed Stage 36 of Stimulation
2018-04-30 Perforation
2018-04-30 Performed Stage 37 of Stimulation
2018-04-30 Performed Stage 38 of Stimulation
2018-04-30 Performed Stage 39 of Stimulation
2018-04-30 Performed Stage 40 of Stimulation
2018-04-30 Performed Stage 41 of Stimulation
2018-05-01 Performed Stage 42 of Stimulation
2018-05-01 Performed Stage 43 of Stimulation
2018-05-01 Performed Stage 44 of Stimulation
2018-05-01 Performed Stage 45 of Stimulation
2018-05-01 Performed Stage 46 of Stimulation
2018-05-02 Performed Stage 47 of Stimulation
2018-05-02 Performed Stage 48 of Stimulation
2018-05-02 Performed Stage 49 of Stimulation
2018-05-02 Performed Stage 50 of Stimulation
2018-05-03 Perforation
2018-05-03 Performed Stage 51 of Stimulation
2018-05-03 Performed Stage 52 of Stimulation
2018-05-03 Performed Stage 53 of Stimulation
2018-05-03 Performed Stage 54 of Stimulation
2019-04-28 Perforation
2019-05-07 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-04-20 2018-05-04 5,554 25,407,500 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CI-3 C&J Energy Services Acid Corrosion Inhibitors Listed Below Listed Below 0 0 0
Water XTO Energy/ExxonMobil Carrier Fluid Water 7732-18-5 100 91.252 0
BIO-CLEAR 2000 C&J Energy Services Biocides Listed Below Listed Below 0 0 0
Tar Bases, Quinoline Derivs. 68513-87-1 1 0.00001300 0
Iron Oxide 1309-37-1 0.1 0.002725 0
2,2-Dibromo-3-nitrilo-propionamide (DBNPA) 10222-01-2 30 0.006397 0
Crystalline Silica, quartz 14808-60-7 99.9 1.47243 0
Ammonium Chloride 12125-02-9 2 0.000385 0
Crystalline Silica, quartz 14808-60-7 99.9 3.73772 0
Hydrochloric Acid 7647-01-0 7.5 0.052249 0
Methanol 67-56-1 1 0.000192 0
Iron Oxide 1309-37-1 0.1 0.003741 0
Sodium Acetate Anhydrous 127-09-3 3 0.00208 0
Cinnamaldehyde 104-55-2 15 0.000188 0
Dimethylformamide 68-12-2 20 0.000251 0
Sorbitan Monooleate 1338-43-8 2 0.001387 0
2-Propenamide as residual 79-06-1 0.1 0.00006900 0
Polyethylene glycol 25322-68-3 50 0.010662 0
Titanium Oxide 13463-67-7 0.1 0.003741 0
Ethylene Glycol 107-21-1 40 0.000501 0
1-OCTANOL 111-87-5 2.5 0.00003100 0
Water 7732-18-5 30 0.0208 0
Ethylene Glycol 107-21-1 5 0.003467 0
Titanium Oxide 13463-67-7 0.1 0.002725 0
Ethoxylated Sorbitan Monooleate 9005-65-6 1 0.000693 0
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 15 0.000188 0
CJENERGY-Phosphate-00040 Proprietary 6 0.001155 0
Water 7732-18-5 92.5 0.644401 0
Water 7732-18-5 28.5 0.006077 0
Alcohols, C12-15-branched and linear,
ethoxylated propoxylated
120313-48-6 2 0.001387 0
Poly(oxy-1,2-ethanediyl),alpha-(4-nonylphenyl)-omega
hydroxy-, branched
127087-87-0 5 0.00006300 0
Poly(oxy-1,2-ethandiyl), alpha-isodecyl-omega-hydroxy-phosphat
e
108818-88-8 2 0.001387 0
Aluminum Oxide 1344-28-1 1.1 0.041156 0
Aluminum Oxide 1344-28-1 1.1 0.029973 0
Titanium Oxide 13463-67-7 0.1 0.001474 0
Distillates (Petroleum), Hydrotreated Light 64742-47-8 35 0.024266 0
Isopropanol 67-63-0 2.5 0.00003100 0
2-Butoxyethanol 111-76-2 15 0.000188 0
Water 7732-18-5 30 0.000376 0
Aluminum Oxide 1344-28-1 1.1 0.016213 0
Crystalline Silica, quartz 14808-60-7 99.9 2.72211 0
2-Propenoic acid, polymer with 2-propenamide, sodium salt 25987-30-8 30 0.0208 0
Water 7732-18-5 96 0.018478 0
1-DECANOL 112-30-1 5 0.00006300 0
Iron Oxide 1309-37-1 0.1 0.001474 0
Monoethanolamine hydrochloride 2002-24-6 2 0.000385 0
Triethyl Phosphate 78-40-0 2.5 0.00003100 0
Sand C&J Energy Services Sand - Bulk - Pennsylvania Listed Below Listed Below 0 0 0
FR-16 C&J Energy Services Friction Reducer Listed Below Listed Below 0 0 0
SI-6 PA-Only C&J Energy Services PA-Proprietary Listed Below Listed Below 0 0 0
HC-7.5 C&J Energy Services Bulk Acid Listed Below Listed Below 0 0 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2018-04-20 1 Sand 39,690 7,718 4,913
2018-04-20 2 Sand 39,690 7,514 5,097
2018-04-20 3 Sand 39,690 7,425 5,440
2018-04-21 4 Sand 39,690 7,385 5,749
2018-04-21 5 Sand 39,690 7,745 5,433
2018-04-21 6 Sand 39,690 7,435 5,048
2018-04-21 7 Sand 39,690 6,877 5,320
2018-04-22 8 Sand 39,690 7,632 5,394
2018-04-22 9 Sand 39,690 7,237 5,555
2018-04-22 10 Sand 39,690 7,136 5,569
2018-04-23 11 Sand 39,690 73,603 4,618
2018-04-23 12 Sand 39,690 7,234 5,919
2018-04-24 13 Sand 39,690 7,048 4,364
2018-04-24 14 Sand 39,690 7,615 6,177
2018-04-24 15 Sand 39,690 7,378 6,439
2018-04-25 16 Sand 39,690 7,251 5,248
2018-04-25 17 Sand 39,690 7,408 5,141
2018-04-25 18 Sand 39,690 7,265 5,195
2018-04-26 19 Sand 39,690 7,661 5,357
2018-04-26 20 Sand 39,690 7,066 4,713
2018-04-26 22 Sand 39,690 6,956 5,564
2018-04-26 23 Sand 39,690 6,980 5,411
2018-04-27 24 Sand 39,690 6,871 5,511
2018-04-27 25 Sand 39,690 7,213 5,380
2018-04-27 26 Sand 39,690 7,124 5,390
2018-04-27 27 Sand 39,690 6,604 5,229
2018-04-27 28 Sand 39,690 6,436 5,283
2018-04-28 29 Sand 39,690 6,638 4,716
2018-04-28 30 Sand 39,690 6,984 5,285
2018-04-28 31 Sand 39,690 7,093 5,298
2018-04-28 32 Sand 39,690 7,186 5,130
2018-04-29 33 Sand 39,690 7,202 5,726
2018-04-29 34 Sand 39,690 7,464 5,200
2018-04-29 35 Sand 39,690 7,665 5,273
2018-04-29 36 Sand 39,690 6,628 5,458
2018-04-30 37 Sand 39,690 6,169 4,627
2018-04-30 38 Sand 39,690 6,527 5,573
2018-04-30 39 Sand 39,690 6,337 5,404
2018-04-30 40 Sand 39,690 6,863 5,682
2018-04-30 41 Sand 39,690 6,838 4,802
2018-05-01 42 Sand 39,690 6,478 4,703
2018-05-01 43 Sand 39,690 6,581 4,975
2018-05-01 44 Sand 39,690 6,891 5,926
2018-05-01 45 Sand 39,690 6,110 4,187
2018-05-01 46 Sand 39,690 6,032 5,849
2018-05-02 47 Sand 39,690 6,137 6,032
2018-05-02 48 Sand 39,690 5,724 6,191
2018-05-02 49 Sand 39,690 5,906 5,881
2018-05-02 50 Sand 39,690 5,902 5,365
2018-05-03 51 Sand 39,690 5,810 5,056
2018-05-03 52 Sand 39,690 5,539 4,745
2018-05-03 53 Sand 39,690 5,279 4,489
2018-05-03 54 Sand 39,690 5,552 5,477

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 XTO ENERGY INC 346,377.24 128 0.00 0 3,085.81 122
2019 XTO ENERGY INC 1,753,945.89 360 0.00 0 10,102.33 360

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 XTO ENERGY INC Synthetic Liner Materials 34.79 Tons LANDFILL 100585
2018 XTO ENERGY INC Produced Fluid 4,117.20 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 843.56 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Drilling Fluid Waste 1,100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Other Oil & Gas Wastes 0.04 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2018 XTO ENERGY INC Produced Fluid 5,225.00 Bbl REUSE (AT WELL PAD)
2018 XTO ENERGY INC Unused Fracturing Fluid Waste 14.49 Tons LANDFILL 100434
2018 XTO ENERGY INC Drill Cuttings 1,207.43 Tons LANDFILL 100585
2018 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2018 XTO ENERGY INC Synthetic Liner Materials 64.82 Tons LANDFILL 100434
2018 XTO ENERGY INC Other Oil & Gas Wastes 125.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 544.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2018 XTO ENERGY INC Waste Water Treatment Sludge 49.64 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2018 XTO ENERGY INC Produced Fluid 24,009.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 21,346.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 11,517.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 5,397.85 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 8,465.05 Bbl INJECTION DISPOSAL WELL 34-133-24189

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2684628 Primary Facility 2018-01-22 Administrative/File Review No Violations Noted
2687369 Primary Facility 2018-01-25 Routine/Partial Inspection No Violations Noted At the time of inspection, Lightning Energy Services was onsite with a Soilmec auger rig. They were circulating in mouse holes. Cellar has been set. Well was partially covered with a steel plate while mouse hole was being set. The Pawlowicz well was surrounded with a steel cage. Emergency Response sign and permit sign is correctly posted at the lease access entrance.
2690721 Primary Facility 2018-02-05 Administrative/File Review No Violations Noted
2690857 Primary Facility 2018-02-05 Administrative/File Review No Violations Noted
2692933 Primary Facility 2018-02-05 Routine/Partial Inspection No Violations Noted At the time of inspection, rig is onsite , but has been laid down. Well was covered with a steel plate. Most of equipment remained onsite and is on containment. Toolpusher said they'll be moving rig to Ohio. Surface casing was cemented using 435 sxs Class A (94 bbls), 2% Gypsum, 2% CaCl2, 15.6 ppg, 1.22 yield. Displaced with 76 bbls water and landed plug. Floats held and 22 bbls cement returned to surface. A float shoe and collar were used with 4 centralizers.

Intermediate casing was cemented using 670 sxs Class A (146 bbls), 2% Gypsum, 2% CaCl2, 15.6 ppg, 1.22 yield. Displaced with 154 bbls water. Did not bump plug. Floats held and 25 bbls cement returned to surface. A float shoe and collar were used with 16 centralizers.

2702978 Primary Facility 2018-03-09 Administrative/File Review No Violations Noted
2706599 Primary Facility 2018-03-19 Administrative/File Review No Violations Noted
2709305 Primary Facility 2018-03-15 Drilling/Alteration No Violations Noted At the time of inspection, 5 1/2" was being unloaded from trucks. Nomac 79 was onsite drilling production hole. BOP had been tested on 3/10 and passed. Chemicals were all contained and there were no apparent rips, tears, or holes in containment.
2709543 Primary Facility 2018-03-19 Routine/Partial Inspection No Violations Noted At the time of inspection, Nomac 79 was rigging down and will be moving to the Briston pad. Production casing was cemented using a lead of 400 sxs 35:65 Poz Class H (79 bbls), 15.2 ppg, 1.1 yield and tail of 1685 sxs Class H, 35% Acid Soluble (470 bbls), 15.6 ppg, 1.57 yield. Pumped 335 bbls water and plug landed. Floats held. 10 bbls spacer to surface and top of cement estimated to be at 2165'.
2718425 Primary Facility 2018-04-16 Administrative/File Review No Violations Noted
2723389 Primary Facility 2018-04-26 Administrative/File Review No Violations Noted
2727814 Primary Facility 2018-05-09 Routine/Partial Inspection No Violations Noted On 5/9/2018, WQS Brian MacQuarrie onsite, meet with Shawn Gearhart- XTO Energy. Currently the plugs are being drilled out on the Lesney 5H. The well site consists of two wells; the Palowicz 4H-019-22583 (currently shut in) and the Lesney 5H-019-22697. Erosion and Sedimentation plan and E/S inspection reports in mailbox. Site sign maintained at entrance. Erosion and Sedimentation BMPs installed and maintained.
2737133 Primary Facility 2018-06-04 Administrative/File Review No Violations Noted
2742848 Primary Facility 2018-06-19 Administrative/File Review No Violations Noted
2748878 Primary Facility 2018-07-05 Routine/Partial Inspection No Violations Noted On 7/5/2018, WQS Brian MacQuarrie onsite. The well site consists of two wells; the Palowicz 4H-019-22583 and the Lesney 5H-019-22697 in production. Erosion and Sedimentation plan and E/S inspection reports in mailbox. Site sign maintained at entrance. Compost filter sock removed and placed in a pile on well pad. Vegetative growth established in previously disturbed areas.
2753671 Primary Facility 2018-07-19 Administrative/File Review No Violations Noted
2812617 Primary Facility 2018-12-06 Routine/Partial Inspection No Violations Noted On 12/6/2018, WQS Brian MacQuarrie onsite. Post Drilling Site Restoration report received for WellAPI 019-22697. All equipment not necessary for production removed from site. Site consists of two wells (4H-019-22583 and 5-019-22697). Tank battery consists of three 400 bbl tanks installed within secondary steel containment structure. Other production equipment includes two GPUs and TVO. Well site vegetated. Infiltration pond maintained.

For data sources see[9]

References