If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-021-21085 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.71044,"lon":-78.649776,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Cambria | |
Municipality: Chest Township | |
Operator Name: DORSO LP | |
Well Pad ID: | |
Farm/Lease Name: JACOB & HENRY LEIDEN HEIRS 19 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2008-03-31 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.710440 | |
Longitude: -78.649776 |
Date | Event |
---|---|
2008-03-31 | New Permit Application |
2008-07-11 | Performed Spud Operation |
2008-07-16 | Drilling Completion |
2008-07-21 | Perforation |
2009-06-26 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | DORSO LP | 3684.00 | 123 | 0.00 | 0 | 0.00 | 0 |
2009 | DORSO LP | 9710.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | DORSO LP | 9,340.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | DORSO LP | 8,288.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | DORSO LP | 7,412.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | DORSO LP | 6,381.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | DORSO LP | 5,351.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | DORSO LP | 4,757.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | DORSO LP | 2,948.00 | 304 | 0.00 | 0 | 0.00 | 0 |
2017 | DORSO LP | 2,072.00 | 273 | 0.00 | 0 | 0.00 | 0 |
2018 | DORSO LP | 2,815.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | DORSO LP | Produced Fluid | 50.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1726459 | Primary Facility | 2008-07-22 | Drilling/Alteration | No Violations Noted | Service rig on site removing baffles @ time of inspection. Pit/freeboard/E&S controls Ok. |
1890463 | Primary Facility | 2010-06-09 | Routine/Complete Inspection | No Violations Noted | According to records, well was completed on 7/16/08 to depth of 3760 ft and has been permitted since 03/31/08. WRAC was submitted and approved on 10/06/08. Well tag information present at the site. Well head completed with 8¿ pipe reduced to 4¿ and reduced to 2¿ production line. Production equipment consisted of separator (150 psi), data logger (250 psi/150 psi), and 100 bbl brine tank (< 20 bbl fluid). No E&S issues and no IW issues during inspection surrounding the production well. No signs of gas leak at the well head and lines. |
1918427 | Primary Facility | 2010-10-07 | Routine/Complete Inspection | No Violations Noted | During this inspection, well drilled and in production and properly tagged. According to records well completed on 07/16/08. Site adequately and permanently restored/stabilized with rock and vegetation. No accelerated erosion or sedimentation issues noted in relation to well site or access road. Brine tank appears sound, but noted duct tape around flange valve. In order to prevent a possible pollution event recommend that operator permanently repair valve to ensure structural integrity is adequate. |
2624291 | Primary Facility | 2017-08-09 | Routine/Complete Inspection | No Violations Noted | system running. no issues at the site. |
For data sources see[7]