X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-027-21527

Well Details

Well ID: 37-027-21527
Loading map...
Country: United States
State: Pennsylvania
County: Centre
Municipality: Burnside Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 148768
Farm/Lease Name: LITKE UNIT 7H-A
License Status:
Spud Date:
Permit Date: 2009-07-28
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.092317
Longitude: -77.955786

For data sources see[1][2][3]

Well History

Date Event
2009-07-28 New Permit Application
2009-11-15 Performed Spud Operation
2010-02-06 Drilling Completion
2010-03-03 Perforation
2010-11-15 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 EXCO RESOURCES PA INC 0.00 0 0.00 0 0.00 0
2010 EXCO RESOURCES PA INC 55,310.00 60 0.00 0 0.00 0
2011 EXCO RESOURCES PA INC 185,583.00 334 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 133,025.00 366 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 107,605.00 365 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 95,624.00 365 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 84,086.00 365 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 78,127.00 364 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 77,125.00 365 0.00 0 0.00 0
2018 EXCO RESOURCES PA LLC 64,579.00 315 0.00 0 0.00 0
2019 EXCO RESOURCES PA LLC 91,680.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 EXCO RESOURCES PA INC Brine 386.00 Bbl Injection Disposal Well OH-3795
2009 EXCO RESOURCES PA INC Brine 2,256.00 Bbl Injection Disposal Well OH-1893,1894,32
2009 EXCO RESOURCES PA INC Drilling 176.00 Bbl Injection Disposal Well OH-3795
2009 EXCO RESOURCES PA INC Drilling 2,416.00 Bbl Injection Disposal Well OH-1893,1894,32
2009 EXCO RESOURCES PA INC Drilling 4,464.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2009 EXCO RESOURCES PA INC Drilling 500.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2009 EXCO RESOURCES PA INC Drilling 3,076.00 Bbl Other
2010 EXCO RESOURCES PA INC Produced Fluid 1,257.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAS2D205BCLE
2010 EXCO RESOURCES PA INC Produced Fluid 100.00 Bbl Injection Disposal Well 34-155-23795
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 710.00 Bbl IDENTIFY METHOD IN COMMENTS
2010 EXCO RESOURCES PA INC Produced Fluid 179.25 Bbl REUSE OTHER THAN ROAD SPREADING
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 642.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 229.00 Bbl Injection Disposal Well 34-155-21893
2010 EXCO RESOURCES PA INC Produced Fluid 341.90 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028207
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 1,432.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 45.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 5,862.15 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 5,125.00 Bbl Injection Disposal Well 34-155-23203
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 185.00 Bbl REUSE OTHER THAN ROAD SPREADING
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 573.00 Bbl Injection Disposal Well 34-155-23795
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 426.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0027057
2011 EXCO RESOURCES PA INC Produced Fluid 1,867.54 Bbl Injection Disposal Well 34-119-27350
2011 EXCO RESOURCES PA INC Produced Fluid 566.08 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011 EXCO RESOURCES PA INC Produced Fluid 402.04 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EXCO RESOURCES PA INC Produced Fluid 4,815.02 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAS2D205BCLE
2011 EXCO RESOURCES PA INC Fracing Fluid Waste 1,750.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EXCO RESOURCES PA INC Produced Fluid 113.67 Bbl STORAGE PENDING DISPOSAL OR REUSE
2011 EXCO RESOURCES PA INC Produced Fluid 99.76 Bbl Injection Disposal Well 34-059-24067
2011 EXCO RESOURCES PA INC Produced Fluid 60.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 EXCO RESOURCES PA INC Produced Fluid 215.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 EXCO RESOURCES PA INC Produced Fluid 111.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2012 EXCO RESOURCES PA LLC Produced Fluid 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 EXCO RESOURCES PA LLC Produced Fluid 2,061.07 Bbl Injection Disposal Well PAS2D205BCLE
2012 EXCO RESOURCES PA LLC Produced Fluid 97.11 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EXCO RESOURCES PA LLC Produced Fluid 106.56 Bbl Injection Disposal Well 34-059-24067
2012 EXCO RESOURCES PA LLC Produced Fluid 200.34 Bbl STORAGE PENDING DISPOSAL OR REUSE
2012 EXCO RESOURCES PA LLC Produced Fluid 2,316.40 Bbl Injection Disposal Well 34-119-27350
2013 EXCO RESOURCES PA LLC Produced Fluid 3,401.48 Bbl Injection Disposal Well PAS2D205BCLE
2013 EXCO RESOURCES PA LLC Produced Fluid 104.40 Bbl STORAGE PENDING DISPOSAL OR REUSE
2014 EXCO RESOURCES PA LLC Produced Fluid 3,076.40 Bbl Injection Disposal Well PAS2D205BCLE
2015 EXCO RESOURCES PA LLC Produced Fluid 2,632.00 Bbl Injection Disposal Well PAS2D205BCLE
2016 EXCO RESOURCES PA LLC Produced Fluid 2,231.60 Bbl Injection Disposal Well PAS2D205BCLE
2017 EXCO RESOURCES PA LLC Produced Fluid 2,051.00 Bbl Injection Disposal Well PAS2D205BCLE
2018 EXCO RESOURCES PA LLC Produced Fluid 432.60 Bbl Injection Disposal Well 34-007-21847
2018 EXCO RESOURCES PA LLC Produced Fluid 1,132.80 Bbl Injection Disposal Well PAS2D205BCLE
2019 EXCO RESOURCES PA LLC Produced Fluid 1,593.90 Bbl Injection Disposal Well PAS2D205BCLE

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1849000 Primary Facility 2009-12-10 Drilling/Alteration No Violations Noted Conducted Inspection with WQS Jessica Miller
1850343 Primary Facility 2009-12-10 Drilling/Alteration No Violations Noted -Well Site ID sign, with E&S control Plan and permit in tube, located at entrance to site. Insp. conducted with WQS Sam Jones, and accompanied by Joe Schwab, Contruction Superintendent of Exco Resources, Inc.
1851829 Primary Facility 2009-12-23 Drilling/Alteration No Violations Noted Site ID sign and E&S plan on site
1856332 Primary Facility 2010-01-12 Drilling/Alteration No Violations Noted Site ID sign and E&S plan on site
1860535 Primary Facility 2010-01-26 Drilling/Alteration No Violations Noted Site ID sign and E&S plan on site
1861275 Primary Facility 2010-01-28 Incident- Response to Accident or Event Violation(s) Noted Adequate company response rec'vd 5/13/2010, past viol closed.
1867042 Primary Facility 2010-03-03 Routine/Complete Inspection No Violations Noted -met on-site with Billy Graham, Pipeline superintendent for Exco resources. He proposed increasing the disturbance on the NW corner of the pad by an area approximately 25' W X 100'L.
1884441 Primary Facility 2010-05-13 Routine/Complete Inspection No Violations Noted Well is in production with 2 production units, and 4-200 Bbls production water tanks with containment.
1917354 Primary Facility 2010-09-08 Routine/Complete Inspection No Violations Noted
2188328 Primary Facility 2013-07-26 Routine/Complete Inspection No Violations Noted
2487356 Primary Facility 2016-05-23 Routine/Complete Inspection No Violations Noted
2491005 Primary Facility 2016-06-07 Follow-up Inspection No Violations Noted
2696543 Primary Facility 2018-02-21 Routine/Complete Inspection No Violations Noted The weather is 70 Deg. F, cloudy and windy at time of inspection. Routine inspection of EXCO Resources PA LLC., Litke Pad, Well # 7HA on February 21, 2018. There are 4 producing wells on this pad.

Annular vent cannot be found at the surface. Digital pressure gauge on the top of the production xmas tree reads 74 PSI, casing pressure gauge reads 148 psi. The well is producing through 2-3/8" size production tubing. 0% combustible gas was detected at the well and in the area immediately surrounding the well. No obvious concerns or violations are noted at time of inspection. Wellsite looks neat and well organized. EXCO Resources, LLC. Representative ¿ Sam Unch, Production Operator. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.

2705849 Primary Facility 2018-03-09 Routine/Complete Inspection No Violations Noted Routine site inspection at EXCO Resources LLC Litke 4 Pad on March 9, 2018.

The site sign, drilling permits, weekly E&S log, PPC plan, emergency response plan (ERP), and work description of the pad and impoundments were found onsite. Please note that the PPC plan and ERP are dated June 2013 and February 2014 respectively. The Department recommends that the operator update both plans and place a copy onsite.

There are 4 drilled and producing Marcellus wells located on the pad. All well cellars are full of gravel and each well is properly labeled. There are two series of produced fluids tanks stationed in secondary containment on this pad (photo 5). Water within containment was frozen. No signs of leaks from the containment were observed. Each tank was labeled.

Part of the well pad has been partially restored. In addition, both impoundments have been fully restored. No E&S issues were observed.

2741717 Primary Facility 2018-06-13 Routine/Complete Inspection No Violations Noted Routine site inspection at EXCO Resources LLC Litke 4 Pad on June 13, 2018.

The site sign, drilling permits, weekly E&S log, PPC plan, emergency response plan (ERP), and work description of the pad and impoundments were found onsite. Please note that the PPC plan and ERP are dated June 2013 and February 2014 respectively. The Department recommends that the operator update both plans and place a copy onsite.

There are 4 drilled and producing Marcellus wells located on the pad. All well cellars are full of gravel. There are (2) 400 bbl produced fluids tanks stationed in secondary containment on this pad. Conductivity readings in this containment were 298 uS/cm. In addition, there are (3) 200 bbl produced fluids tanks stationed in secondary containment. Conductivity in this containment was 427 uS/cm. No signs of leaks from either containment were observed. Each tank was properly labeled.

Part of the well pad has been partially restored. In addition, both impoundments have been fully restored. No E&S issues

2852094 Primary Facility 2019-03-12 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection at EXCO Resources PA LLC Litke Pad 4 on March 12, 2019.

There are 4 drilled and producing Marcellus wells located on the pad. All well cellars are full of gravel and/or snow. There are (2) 400 bbl produced fluids tanks stationed in secondary containment. In addition, there are (3) 200 bbl produced fluids tanks stationed in a separate secondary containment. Frozen water was observed in both sets of produced fluids secondary containment. No signs of leaks from either containment were observed. Each produced fluids tank was labeled.

Part of the well pad has been partially restored. In addition, both impoundments (2 & 3 MG) have been fully restored and are well vegetated. No E&S issues were observed. The well pad and surrounding areas are partially snow covered.

No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1861275 580776 01/28/2010 2010-01-28 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt Environmental Health & Safety Adequate company response rec'vd 5/13/2010, past viol closed. Boring mud breakout with approximately 5 gals of boring mud entering Little Sandy Run during a boring frac out

For data sources see[7]

References