If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-20506 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.788014,"lon":-77.215237,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Charleston Township | |
Operator Name: SWEPI LP | |
Well Pad ID: 149014 | |
Farm/Lease Name: PARTHEMER 284 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2009-12-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.788014 | |
Longitude: -77.215237 |
Date | Event |
---|---|
2009-12-17 | New Permit Application |
2010-03-05 | Performed Spud Operation |
2010-06-25 | Drilling Completion |
2010-09-22 | Perforation |
2011-02-03 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | EAST RESOURCES MGMT LLC | 240,761.00 | 77 | 0.00 | 0 | 0.00 | 0 |
2011 | SWEPI LP | 706,560.21 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | SWEPI LP | 405,351.88 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | SWEPI LP | 326,460.43 | 348 | 0.00 | 0 | 0.00 | 0 |
2014 | SWEPI LP | 255,994.52 | 355 | 0.00 | 0 | 0.00 | 0 |
2015 | SWEPI LP | 182,143.12 | 281 | 0.00 | 0 | 0.00 | 0 |
2016 | SWEPI LP | 158,056.10 | 302 | 0.00 | 0 | 0.00 | 0 |
2017 | SWEPI LP | 121,722.84 | 265 | 0.00 | 0 | 0.00 | 0 |
2018 | SWEPI LP | 113,868.25 | 277 | 0.00 | 0 | 0.00 | 0 |
2019 | SWEPI LP | 117,026.60 | 295 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | EAST RESOURCES MGMT LLC | Fracing Fluid Waste | 8,622.25 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | SWEPI LP | Fracing Fluid Waste | 3,500.93 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SWEPI LP | Fracing Fluid Waste | 171.67 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | SWEPI LP | Fracing Fluid Waste | 515.08 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SWEPI LP | Fracing Fluid Waste | 45.24 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | SWEPI LP | Produced Fluid | 1,410.51 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SWEPI LP | Fracing Fluid Waste | 16.67 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2013 | SWEPI LP | Produced Fluid | 55.54 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Produced Fluid | 50.01 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | SWEPI LP | Produced Fluid | 1,813.99 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | SWEPI LP | Fracing Fluid Waste | 16.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | SWEPI LP | Produced Fluid | 765.99 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SWEPI LP | Produced Fluid | 18.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | SWEPI LP | Produced Fluid | 100.02 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | SWEPI LP | Produced Fluid | 83.35 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | SWEPI LP | Produced Fluid | 34.43 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | SWEPI LP | Produced Fluid | 404.06 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | SWEPI LP | Produced Fluid | 65.16 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | SWEPI LP | Produced Fluid | 420.07 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | SWEPI LP | Produced Fluid | 233.34 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2017 | SWEPI LP | Produced Fluid | 336.82 Bbl | REUSE (AT WELL PAD) | |
2018 | SWEPI LP | Produced Fluid | 84.07 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | SWEPI LP | Produced Fluid | 185.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2018 | SWEPI LP | Produced Fluid | 22.98 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | SWEPI LP | Produced Fluid | 366.33 Bbl | REUSE (AT WELL PAD) | |
2019 | SWEPI LP | Produced Fluid | 88.24 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | SWEPI LP | Produced Fluid | 16.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2019 | SWEPI LP | Produced Fluid | 185.01 Bbl | REUSE (AT WELL PAD) | |
2019 | SWEPI LP | Produced Fluid | 33.34 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1947426 | Primary Facility | 2011-02-02 | Compliance Evaluation | Violation(s) Noted | Flowback release into ditch on site |
1967621 | Primary Facility | 2011-03-05 | Follow-up Inspection | No Violations Noted | to close flowback spill violations |
2145198 | Primary Facility | 2013-02-26 | Routine/Complete Inspection | No Violations Noted | |
2235099 | Primary Facility | 2013-12-30 | Routine/Complete Inspection | No Violations Noted | |
2398177 | Primary Facility | 2015-08-11 | Routine/Complete Inspection | No Violations Noted | |
2443775 | Primary Facility | 2016-01-27 | Routine/Complete Inspection | No Violations Noted | |
2475772 | Primary Facility | 2016-04-14 | Routine/Partial Inspection | No Violations Noted | Partial inspection. Well site was restored in October-November 2015. Post Construction Stormwater Management (PCSM) BMPs have been installed. Site is temporarily stabilized and silt sock remains in place. TLT |
2511117 | Primary Facility | 2016-08-16 | Site Restoration | No Violations Noted | Restoration inspection. DEP received the Well Site Restoration Reports on 6/29/16 for the 1H - 6H wells. Site is restored and post construction stormwater management BMPs have been installed. Site is permanently stabilized with exception to Infiltration Berms 1 & 2. Restoration Reports were reviewed and acknowledged on 8/16/16. TLT |
2522774 | Primary Facility | 2016-09-27 | Routine/Complete Inspection | No Violations Noted | |
2590863 | Primary Facility | 2017-05-05 | Routine/Partial Inspection | No Violations Noted | A compressor station is on this well pad.
EC readings w/ an Oakton PCSTestr 35 in mS/cm: ditch--0.18, production tanks--0.19 & 2.0, near well heads--0.12. 6 separators and 5 chemical injection units on site. |
2626596 | Primary Facility | 2017-08-09 | Site Restoration | No Violations Noted | EC readings w Oakton PCSTestr 35 (mS/cm): pad--0.97, containment--0.64 & 1.2. |
2684657 | Primary Facility | 2018-01-22 | Routine/Complete Inspection | No Violations Noted | Chilly/raining at time of inspection. |
2695430 | Primary Facility | 2018-02-16 | Routine/Partial Inspection | No Violations Noted | SWEPI 's inspection logbook is in a mailbox near the site ID sign; last inspection listed on February 3, 2018. Electrical conductivity (EC) readings taken with an Oakton PCSTestr 35. Air temp 36F. JLP |
2826276 | Primary Facility | 2019-01-14 | Routine/Complete Inspection | No Violations Noted | The DEP conducted a routine inspection of SWEPI's Parthemer 284 Well Pad in Charleston Twp, Tioga County on 1/14/2019 at 1040 hours. The inspection was conducted to assess site conditions. The weather was sunny and 21 degrees.
There are currently 6 wells onsite capable of producing with 6 production tanks. One well appears to be flowing back and a vertical separator and frac tank are installed on it. The site is well vegetated and remains stabilized. No erosional issues were observed today and all fluids on pad surface were frozen solid. No violations noted today, I departed the site at 1105. |
2839228 | Primary Facility | 2019-02-13 | Routine/Complete Inspection | No Violations Noted | Cold snowy/windy at time of inspection |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1947426 | 604073 | 02/02/2011 | 2011-02-02 | 401CSL - Discharge of pollultional material to waters of Commonwealth. | Environmental Health & Safety | |
1947426 | 604074 | 02/02/2011 | 2011-02-02 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | |
1947426 | 604075 | 02/02/2011 | 2011-02-02 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | Administrative |
For data sources see[7]