X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-083-45561

Well Details

Well ID: 37-083-45561
Loading map...
Country: United States
State: Pennsylvania
County: McKean
Municipality: Eldred Township
Operator Name: RENEGADE RESOURCES LLC
Well Pad ID:
Farm/Lease Name: PROUTY 9
License Status: ACTIVE
Spud Date:
Permit Date: 1987-07-17
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.928421
Longitude: -78.361518

For data sources see[1][2][3]

Well History

Date Event
1987-07-17 New Permit Application
1987-07-29 Performed Spud Operation
1987-07-31 Drilling Completion
1988-01-01 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2005 CHARIS ENERGY LLC 0.00 0 16.88 184 0.00 0
2008 CHARIS ENERGY INC 0.00 0 212.44 365 0.00 0
2009 CHARIS ENERGY INC 0.00 0 122.02 365 0.00 0
2010 CHARIS ENERGY INC 0.00 0 71.02 365 0.00 0
2011 CHARIS ENERGY INC 0.00 0 46.70 365 0.00 0
2012 CHARIS ENERGY INC 0.00 0 57.41 366 0.00 0
2013 CHARIS ENERGY INC 0.00 0 26.62 351 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 CHARIS ENERGY INC Produced Fluid 48.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2009 CHARIS ENERGY INC Produced Fluid 5.43 Bbl Reuse other than road spreading
2010 CHARIS ENERGY INC Produced Fluid 28.77 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2010 CHARIS ENERGY INC Produced Fluid 17.23 Bbl Reuse other than road spreading
2011 CHARIS ENERGY INC Produced Fluid 32.72 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2012 CHARIS ENERGY INC Produced Fluid 8.00 Bbl Reuse other than road spreading
2012 CHARIS ENERGY INC Produced Fluid 8.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2013 CHARIS ENERGY INC Produced Fluid 25.85 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
553807 Primary Facility 1990-10-18 Routine/Complete Inspection No Violations Noted
567241 Primary Facility 1994-08-16 Routine/Complete Inspection Violation(s) Noted
567384 Primary Facility 1994-08-31 Routine/Complete Inspection No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
567241 103074 08/16/1994 1994-08-16 78.61.2.3 - Improper residual waste or drill cutting disposal Environmental Health & Safety

For data sources see[7]

References