If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-20532 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.234206,"lon":-76.644075,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Penn Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148832 | |
Farm/Lease Name: MARQUARDT UNIT B 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-03-03 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.234206 | |
Longitude: -76.644075 |
Date | Event |
---|---|
2011-03-03 | New Permit Application |
2011-03-09 | Performed Spud Operation |
2013-05-24 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-05-27 | 2011-05-27 | 4,566 | 4,499,628 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 10.88 | ||
Plexcide 24L | Pumpco Services | Biocide | Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24.00 | 0.00720000 | ||
Other | 72.00 | 0.02 | ||||||
Sodium hydroxide | 1310-73-2 | 4.00 | 0.00120000 | |||||
Plexbreak 145 - Acid - Additives | Pumpco Services | Cleaning | Plexbreak 145 - Other (85) | 85.00 | 0.00029000 | |||
Methanol | 67-56-1 | 15.00 | 0.00005000 | |||||
Feriplex 40 - Acid - Additives | Pumpco Services | Cleaning | Sodium sulfate | 7757-82-6 | 2.00 | 0.00002000 | ||
Sodium hydroxide | 1310-73-2 | 1.00 | 0.00001000 | |||||
Feriplex 40 - Other (57-58.5) | 57.00 | 0.00066000 | ||||||
Nitrilotriacetic acid trisodium monohydrate | 18662-53-8 | 40.00 | 0.00046000 | |||||
Scale Inhibitor - Greenhib 677 | Pumpco Services | Scale Inhibitor | Salt of phosphonomethylated diamine | 25.00 | 0.00063000 | |||
Other | 75.00 | 0.02 | ||||||
Water | Water | 7732-18-5 | 100.00 | 88.74 | ||||
7.5 HCl Acid | Pumpco Services | Cleaning | ||||||
Hydrochloric acid | 7647-01-0 | 40.00 | 0.02 | |||||
Other (non-hazardous) | 60.00 | 0.27 | ||||||
Plexslick 921 | Pumpco Services | Friction Reducer | Other | 70.00 | 0.01 | |||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.00800000 | |||||
Plexhib 256 - Acid - Additives | Pumpco Services | Cleaning | ||||||
Propargyl alcohol | 107-19-7 | 8.00 | 0.00002000 | |||||
Methanol | 67-56-1 | 40.00 | 0.00012000 | |||||
Plexhib 256 - Other (52-66) | 52.00 | 0.00016000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | XTO ENERGY INC | 396,483.00 | 187 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 526,608.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 319,526.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 266,360.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 243,010.00 | 332 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 216,753.00 | 349 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 150,353.00 | 336 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 170,760.12 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 146,832.56 | 338 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | XTO ENERGY INC | Produced Fluid | 102.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2011 | XTO ENERGY INC | Produced Fluid | 3,742.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2011 | XTO ENERGY INC | Produced Fluid | 6,830.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC001 |
2011 | XTO ENERGY INC | Fracing Fluid Waste | 1,933.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC001 |
2011 | XTO ENERGY INC | Fracing Fluid Waste | 260.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | XTO ENERGY INC | Produced Fluid | 413.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-133-24189 |
2011 | XTO ENERGY INC | Produced Fluid | 503.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-133-20114 |
2011 | XTO ENERGY INC | Produced Fluid | 1,694.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2012 | XTO ENERGY INC | Produced Fluid | 3,424.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2012 | XTO ENERGY INC | Produced Fluid | 1,416.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 340.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | XTO ENERGY INC | Produced Fluid | 195.00 Bbl | INJECTION DISPOSAL WELL | 114 |
2012 | XTO ENERGY INC | Produced Fluid | 8,565.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | XTO ENERGY INC | Produced Fluid | 195.00 Bbl | INJECTION DISPOSAL WELL | 0114 |
2012 | XTO ENERGY INC | Produced Fluid | 299.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2012 | XTO ENERGY INC | Produced Fluid | 2,387.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 339.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2013 | XTO ENERGY INC | Produced Fluid | 202.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 1,560.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | XTO ENERGY INC | Produced Fluid | 1,000.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 533.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2013 | XTO ENERGY INC | Produced Fluid | 1,030.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 387.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 464.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2014 | XTO ENERGY INC | Produced Fluid | 3,457.07 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | XTO ENERGY INC | Produced Fluid | 876.90 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | XTO ENERGY INC | Produced Fluid | 1,159.66 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 1,013.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 354.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2015 | XTO ENERGY INC | Produced Fluid | 1,938.44 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 1,922.01 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Other Oil & Gas Wastes | 3.16 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 1,719.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 462.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 218.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2016 | XTO ENERGY INC | Produced Fluid | 114.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2016 | XTO ENERGY INC | Produced Fluid | 837.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 420.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 1,223.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 2,594.32 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | XTO ENERGY INC | Produced Fluid | 233.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 1,222.56 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | XTO ENERGY INC | Produced Fluid | 116.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | XTO ENERGY INC | Produced Fluid | 768.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 904.34 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | XTO ENERGY INC | Produced Fluid | 1,600.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | XTO ENERGY INC | Produced Fluid | 827.32 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | XTO ENERGY INC | Produced Fluid | 223.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2018 | XTO ENERGY INC | Produced Fluid | 227.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | XTO ENERGY INC | Produced Fluid | 943.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 1,121.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 534.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 955.58 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Produced Fluid | 556.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1966441 | Primary Facility | 2011-04-18 | Drilling/Alteration | No Violations Noted | |
1974921 | Primary Facility | 2011-05-20 | Routine/Complete Inspection | No Violations Noted | |
1980466 | Primary Facility | 2011-06-10 | Follow-up Inspection | No Violations Noted | |
1987479 | Primary Facility | 2011-07-11 | Follow-up Inspection | Violation(s) Noted | |
2066511 | Primary Facility | 2012-05-09 | Routine/Complete Inspection | Pending | |
2106614 | Primary Facility | 2012-10-05 | Routine/Complete Inspection | No Violations Noted | |
2135934 | Primary Facility | 2013-01-25 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2436303 | Primary Facility | 2015-12-24 | Routine/Complete Inspection | No Violations Noted | |
2616482 | Primary Facility | 2017-07-14 | Site Restoration | No Violations Noted | Well Site Restoration/Notice of Termination Inspection. The site is permanently stabilized and PCSM plans have been implemented. The well pad surface remains as constructed but justification for the production size has been provided. I recommend approving the Well Site Restoration Report and Notice of Termination. No violations noted. |
2851964 | Primary Facility | 2019-03-12 | Routine/Complete Inspection | No Violations Noted | Weather 36 degrees with minor snow cover. Three wells staged for production. Three GPU's within the production tank containment. No leaks noted. No violations. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1987479 | 615227 | 07/11/2011 | 2011-07-11 | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | Administrative | Defective Cement: Gas found in the annular space of the 9 5/8 x 5 1/2 casing. |
For data sources see[8]