X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0735232313000

Well Details

Well ID: 0735232313000
Loading map...
Location: 00/13-23-073-23W5/0
Location Alias: 00/13-23-73-23 W5M
Location Alias 2: 00/13-23-073-23 W5/00
Country: Canada
Province: Alberta
Township: 073
Meridian: 5
Range: 23
Section: 23
County/Municipality: Municipal District of Greenview No. 16
Well Name: PETRUS HZ SHELDON 13-23-73-23
Operator Name: Rising Star Resources Ltd.
License Number: 0449739
License Date: 2012-11-02
License Status: Suspension
Spud Date: 2012-11-11
Final Drill Date: 2012-11-21
Well Total Depth: 2694.80 m
Surface Hole Latitude: 55.342996
Surface Hole Longitude: -117.412693

For data sources see[1][2]

Well History

Date Event
2012-11-02 Obtained License
2012-11-12 Surface Casing Operation Performed
2012-11-14 Direction Drilling Operation Performed - Deviate
2012-11-15 Direction Drilling Operation Performed - Horizontal
2012-11-17 Intermediate Casing Operation Performed
2012-11-21 Finished Drilling
2012-11-21 Well Mode changed to Drilled and Cased
2012-11-22 Production Casing Operation Performed
2012-11-23 Rig Released
2012-12-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-06 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-01 Well Began Production
2013-03-01 Well Fluid changed to Crude Oil
2013-03-01 Well Mode changed to Pumping
2016-03-31 Well Fluid changed to Crude Oil
2016-03-31 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-11-11 Horizon Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-11-14 1041.00 Deviate (5 - 79 degrees)
2012-11-15 1436.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-12-05 Multi-Stage Fracture 2673.80 2674.30 0
2012-12-05 Multi-Stage Fracture 2608.00 2608.50 0
2012-12-05 Multi-Stage Fracture 2542.10 2542.60 0
2012-12-05 Multi-Stage Fracture 2471.50 2472.00 0
2012-12-05 Multi-Stage Fracture 2394.00 2394.50 0
2012-12-05 Multi-Stage Fracture 2329.00 2329.50 0
2012-12-05 Multi-Stage Fracture 2263.10 2263.60 0
2012-12-05 Multi-Stage Fracture 2184.50 2185.00 0
2012-12-05 Multi-Stage Fracture 2106.40 2106.90 0
2012-12-05 Multi-Stage Fracture 2053.10 2053.60 0
2012-12-05 Multi-Stage Fracture 1975.40 1975.90 0
2012-12-05 Multi-Stage Fracture 1909.80 1910.30 0
2012-12-05 Multi-Stage Fracture 1841.20 1841.70 0
2012-12-05 Multi-Stage Fracture 1764.00 1764.50 0
2012-12-05 Multi-Stage Fracture 1698.00 1698.50 0
2012-12-05 Multi-Stage Fracture 1632.30 1632.80 0
2012-12-05 Multi-Stage Fracture 1566.20 1566.70 0
2012-12-05 Multi-Stage Fracture 1487.80 1488.30 0
2012-12-05 Multi-Stage Fracture 1481.70 1482.20 0
2012-12-06 Multi-Stage Fracture 1560.10 1560.60 0
2012-12-06 Multi-Stage Fracture 1626.20 1626.70 0
2012-12-06 Multi-Stage Fracture 1691.80 1692.20 0
2012-12-06 Multi-Stage Fracture 1757.80 1758.30 0
2012-12-06 Multi-Stage Fracture 1835.10 1835.60 0
2012-12-06 Multi-Stage Fracture 1903.70 1904.20 0
2012-12-06 Multi-Stage Fracture 1969.30 1969.80 0
2012-12-06 Multi-Stage Fracture 2047.10 2047.60 0
2012-12-06 Multi-Stage Fracture 2112.70 2113.20 0
2012-12-06 Multi-Stage Fracture 2178.40 2178.90 0
2012-12-06 Multi-Stage Fracture 2257.00 2257.50 0
2012-12-06 Multi-Stage Fracture 2322.90 2323.40 0
2012-12-06 Multi-Stage Fracture 2387.90 2388.40 0
2012-12-06 Multi-Stage Fracture 2465.40 2465.90 0
2012-12-06 Multi-Stage Fracture 2546.00 2546.50 0
2012-12-06 Multi-Stage Fracture 2611.90 2612.40 0
2012-12-06 Multi-Stage Fracture 2677.70 2678.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 5683 0.0 0.0 0.0
2014 3103 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-23 No Incident Encountered 0.00 0.00
2012-12-05 No Incident Encountered 0.00 0.00
2013-02-01 No Incident Encountered 0.00 0.00

For data sources see[8]

References