X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254270513000

Well Details

Well ID: 0254270513000
Loading map...
Location: 00/13-05-025-27W4/0
Location Alias: 00/13-05-25-27 W4M
Location Alias 2: 00/13-05-025-27 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 27
Section: 05
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 13-5-25-27
Operator Name: Ember Resources Inc.
License Number: 0271174
License Date: 2002-06-24
License Status: Issued
Spud Date: 2002-06-30
Final Drill Date: 2002-07-06
Well Total Depth: 1279.00 m
Surface Hole Latitude: 51.106242
Surface Hole Longitude: -113.748285

For data sources see[1][2]

Well History

Date Event
2002-06-24 Obtained License
2002-06-30 Surface Casing Operation Performed
2002-07-05 Direction Drilling Operation Performed - Deviate
2002-07-06 Finished Drilling
2002-07-07 Well Log Performed
2002-07-08 Production Casing Operation Performed
2002-07-08 Rig Released
2002-07-08 Well Mode changed to Drilled and Cased
2002-08-31 Well Log Performed
2002-10-17 Perforation Treatment Performed - Jet Perforation
2002-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-10 Plug Back Performed
2002-11-10 Well Mode changed to Abandoned Zone
2002-12-09 Perforation Treatment Performed - Jet Perforation
2003-01-12 Perforation Treatment Performed - Fractured
2003-01-26 Perforation Treatment Performed - Jet Perforation
2003-02-17 Perforation Treatment Performed - Fractured
2003-10-05 Perforation Treatment Performed - Jet Perforation
2003-10-06 Well Log Performed
2003-10-08 Perforation Treatment Performed - Fractured
2003-12-21 Well Log Performed
2007-10-30 Well Log Performed
2008-05-31 Well Log Performed
2009-09-17 Well Log Performed
2010-06-29 Well Log Performed
2013-10-08 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-07-05 115.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-10-17 Perforation 1183.00 1186.00 7
2002-11-10 Packing Device Capped w/Cement 1172.00 1180.00 0
2002-12-09 Perforation 1061.00 1064.00 13
2003-01-12 Fracture 1061.00 1064.00 0
2003-01-26 Perforation 919.00 926.00 13
2003-02-17 Fracture 919.00 926.00 0
2003-10-05 Perforation 822.50 824.50 13
2003-10-05 Perforation 805.10 807.10 13
2003-10-05 Perforation 794.30 795.30 13
2003-10-05 Perforation 784.70 785.70 13
2003-10-05 Perforation 782.30 783.30 13
2003-10-05 Perforation 773.70 774.70 13
2003-10-05 Perforation 759.30 760.30 13
2003-10-05 Perforation 750.50 751.50 13
2003-10-05 Perforation 738.40 739.40 13
2003-10-05 Perforation 705.80 706.80 13
2003-10-05 Perforation 701.70 703.70 13
2003-10-05 Perforation 699.30 700.30 13
2003-10-05 Perforation 681.70 682.70 13
2003-10-05 Perforation 673.00 674.00 13
2003-10-05 Perforation 664.60 665.60 13
2003-10-05 Perforation 654.80 655.80 13
2003-10-05 Perforation 640.10 641.10 13
2003-10-05 Perforation 635.50 636.50 13
2003-10-05 Perforation 628.10 629.10 13
2003-10-05 Perforation 625.40 626.40 13
2003-10-05 Perforation 504.50 505.50 13
2003-10-05 Perforation 498.30 499.30 13
2003-10-05 Perforation 490.80 491.80 13
2003-10-05 Perforation 408.50 409.50 13
2003-10-05 Perforation 356.90 358.90 13
2003-10-05 Perforation 350.60 351.60 13
2003-10-08 Fracture 350.60 824.50 0

For data sources see[5]



References