X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0084243610000

Well Details

Well ID: 0084243610000
Loading map...
Location: 00/10-36-008-24W4/0
Location Alias: 00/10-36-08-24 W4M
Location Alias 2: 00/10-36-008-24 W4/00
Country: Canada
Province: Alberta
Township: 008
Meridian: 4
Range: 24
Section: 36
County/Municipality: Blood 148
Well Name: KAISER GULF BLOOD 10-36-8-24
Operator Name: BP Canada Energy Group ULC
License Number: 0076563
License Date: 1979-06-25
License Status: RecCertified
Spud Date: 1979-06-25
Final Drill Date: 1979-07-30
Well Total Depth: 2370.00 m
Surface Hole Latitude: 49.692641
Surface Hole Longitude: -113.12703

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-06-25 Obtained License
1979-07-30 Finished Drilling
1979-07-31 Well Log Performed
1979-08-02 Production Casing Operation Performed
1979-08-20 Perforation Treatment Performed - Jet Perforation
1979-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-08-26 Perforation Treatment Performed - Jet Perforation
1979-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-08-29 Perforation Treatment Performed - Jet Perforation
1979-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-09-01 Perforation Treatment Performed - Cement Squeeze
1979-09-01 Well Abandoned
1979-09-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-08-20 Perforation 2286.60 2291.50 13
1979-08-20 Perforation 2304.00 2309.00 13
1979-08-22 Acid Treatment 2286.60 2309.00 0
1979-08-23 Acid Treatment 2286.60 2309.00 0
1979-08-25 Packing Device Capped w/Cement 2264.00 2272.00 0
1979-08-26 Perforation 1874.20 1874.80 13
1979-08-26 Perforation 1875.50 1882.00 13
1979-08-29 Packing Device Capped w/Cement 1862.00 1870.00 0
1979-08-29 Perforation 1843.00 1846.50 13
1979-08-29 Perforation 1848.00 1849.00 13
1979-08-29 Perforation 1856.50 1858.50 13
1979-09-01 Cement Squeeze 1843.00 1858.50 0
1979-09-01 Packing Device Capped w/Cement 1838.00 1838.00 0

For data sources see[4]



References