If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0185051509002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.519078,"lon":-114.611023,"icon":""}]} |
Location: 00/09-15-018-05W5/2 | |
Location Alias: 00/09-15-18-05 W5M | |
Location Alias 2: 00/09-15-018-05 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 018 | |
Meridian: 5 | |
Range: 05 | |
Section: 15 | |
County/Municipality: Kananaskis Improvement District | |
Well Name: Canlin DYSON 9-15-18-5 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0071265 | |
License Date: 1978-08-10 | |
License Status: Suspension | |
Spud Date: 1978-09-03 | |
Final Drill Date: 1979-03-07 | |
Well Total Depth: 4115.60 m | |
Surface Hole Latitude: 50.519078 | |
Surface Hole Longitude: -114.611023 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-08-10 | Obtained License |
1978-12-09 | Well Log Performed |
1978-12-13 | Production Casing Operation Performed |
1979-02-09 | Well Log Performed |
1979-03-07 | Finished Drilling |
1979-03-07 | Well Mode changed to Drilled and Cased |
1979-03-08 | Well Log Performed |
1979-07-03 | Perforation Treatment Performed - Jet Perforation |
1979-07-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-07-06 | Perforation Treatment Performed - Fractured |
2006-02-28 | Well Log Performed |
2006-03-01 | Perforation Treatment Performed - Jet Perforation |
2006-03-01 | Well Log Performed |
2006-03-02 | Perforation Treatment Performed - Jet Perforation |
2006-03-02 | Well Log Performed |
2006-03-09 | Perforation Treatment Performed - Fractured |
2006-03-17 | Well Log Performed |
2006-03-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-03-18 | Plug Back Performed |
2006-03-21 | Perforation Treatment Performed - Jet Perforation |
2006-03-21 | Well Log Performed |
2006-03-22 | Perforation Treatment Performed - Jet Perforation |
2006-03-28 | Perforation Treatment Performed - Fractured |
2006-03-30 | Perforation Treatment Performed - Jet Perforation |
2006-03-31 | Perforation Treatment Performed - Jet Perforation |
2006-03-31 | Well Log Performed |
2006-04-02 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-07-03 | Perforation | 2086.00 | 2096.00 | 7 |
1979-07-03 | Perforation | 2122.00 | 2125.50 | 7 |
1979-07-03 | Perforation | 2130.50 | 2134.00 | 7 |
1979-07-03 | Perforation | 2163.50 | 2165.00 | 7 |
1979-07-03 | Perforation | 2167.50 | 2169.00 | 7 |
1979-07-03 | Perforation | 2173.00 | 2175.00 | 7 |
1979-07-03 | Perforation | 2176.50 | 2178.00 | 7 |
1979-07-03 | Perforation | 2180.00 | 2183.00 | 7 |
1979-07-04 | Acid Treatment | 2086.00 | 2183.00 | 0 |
1979-07-06 | Fracture | 2086.00 | 2183.00 | 0 |
2006-03-01 | Perforation | 3222.00 | 3232.00 | 14 |
2006-03-01 | Perforation | 3252.00 | 3262.00 | 14 |
2006-03-02 | Perforation | 3191.00 | 3194.00 | 14 |
2006-03-02 | Perforation | 3217.50 | 3222.00 | 14 |
2006-03-09 | Fracture | 3191.00 | 3262.00 | 0 |
2006-03-18 | Packing Device Capped w/Cement | 3159.00 | 3167.00 | 0 |
2006-03-18 | Packing Device Capped w/Cement | 2442.00 | 2450.00 | 0 |
2006-03-21 | Perforation | 2380.00 | 2384.00 | 13 |
2006-03-21 | Perforation | 2386.00 | 2392.00 | 13 |
2006-03-21 | Perforation | 2415.00 | 2422.50 | 13 |
2006-03-22 | Perforation | 2291.00 | 2294.50 | 13 |
2006-03-22 | Perforation | 2298.50 | 2313.00 | 13 |
2006-03-22 | Perforation | 2321.00 | 2330.00 | 13 |
2006-03-28 | Fracture | 2291.00 | 2422.50 | 0 |
2006-03-30 | Perforation | 2173.00 | 2175.00 | 13 |
2006-03-30 | Perforation | 2176.50 | 2178.00 | 13 |
2006-03-30 | Perforation | 2180.00 | 2183.00 | 13 |
2006-03-31 | Perforation | 2122.00 | 2125.50 | 13 |
2006-03-31 | Perforation | 2130.50 | 2134.00 | 13 |
2006-03-31 | Perforation | 2138.00 | 2140.00 | 13 |
2006-03-31 | Perforation | 2151.50 | 2154.00 | 13 |
2006-03-31 | Perforation | 2163.00 | 2165.00 | 13 |
2006-03-31 | Perforation | 2167.50 | 2169.00 | 13 |
2006-04-02 | Fracture | 2122.00 | 2183.00 | 0 |
For data sources see[4]