If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0265043603000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.271602,"lon":-114.430467,"icon":""}]} |
Location: 00/03-36-026-04W5/0 | |
Location Alias: 00/03-36-26-04 W5M | |
Location Alias 2: 00/03-36-026-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 5 | |
Range: 04 | |
Section: 36 | |
County/Municipality: Rocky View County | |
Well Name: TRIOIL HZ LOCHEND 3-36-26-4 | |
Operator Name: ORLEN Upstream Canada Ltd. | |
License Number: 0456719 | |
License Date: 2013-05-06 | |
License Status: Issued | |
Spud Date: 2014-02-17 | |
Final Drill Date: 2014-03-08 | |
Well Total Depth: 4063.00 m | |
Surface Hole Latitude: 51.271602 | |
Surface Hole Longitude: -114.430467 |
Date | Event |
---|---|
2013-05-06 | Obtained License |
2014-02-19 | Surface Casing Operation Performed |
2014-02-23 | Direction Drilling Operation Performed - Deviate |
2014-02-25 | Direction Drilling Operation Performed - Horizontal |
2014-03-08 | Finished Drilling |
2014-03-08 | Well Log Performed |
2014-03-08 | Well Mode changed to Drilled and Cased |
2014-03-11 | Production Casing Operation Performed |
2014-03-11 | Rig Released |
2014-04-08 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2014-04-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-04-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-04-16 | Well Log Performed |
2014-04-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-05-01 | Well Began Production |
2014-05-01 | Well Fluid changed to Crude Oil |
2014-05-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-02-17 | Trinidad Drilling Ltd. | 94 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-02-23 | 2041.50 | Deviate (5 - 79 degrees) |
2014-02-25 | 2535.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-04-08 | Hydra Jet Perforation | 4044.60 | 4044.70 | 0 |
2014-04-08 | Multi-Stage Fracture | 4029.40 | 4029.50 | 0 |
2014-04-08 | Multi-Stage Fracture | 3987.00 | 3987.10 | 0 |
2014-04-08 | Multi-Stage Fracture | 3944.00 | 3944.10 | 0 |
2014-04-08 | Multi-Stage Fracture | 3901.50 | 3901.60 | 0 |
2014-04-08 | Multi-Stage Fracture | 3858.60 | 3858.70 | 0 |
2014-04-08 | Multi-Stage Fracture | 3814.40 | 3814.50 | 0 |
2014-04-08 | Multi-Stage Fracture | 3773.20 | 3773.30 | 0 |
2014-04-09 | Multi-Stage Fracture | 3730.60 | 3730.70 | 0 |
2014-04-09 | Multi-Stage Fracture | 3687.30 | 3687.40 | 0 |
2014-04-09 | Multi-Stage Fracture | 3643.00 | 3643.10 | 0 |
2014-04-09 | Multi-Stage Fracture | 3598.70 | 3598.80 | 0 |
2014-04-09 | Multi-Stage Fracture | 3555.50 | 3555.60 | 0 |
2014-04-09 | Multi-Stage Fracture | 3511.80 | 3511.90 | 0 |
2014-04-09 | Multi-Stage Fracture | 3467.90 | 3468.00 | 0 |
2014-04-09 | Multi-Stage Fracture | 3426.20 | 3426.30 | 0 |
2014-04-09 | Multi-Stage Fracture | 3382.90 | 3383.00 | 0 |
2014-04-09 | Multi-Stage Fracture | 3341.80 | 3341.90 | 0 |
2014-04-09 | Multi-Stage Fracture | 3298.60 | 3298.70 | 0 |
2014-04-09 | Multi-Stage Fracture | 3254.90 | 3255.00 | 0 |
2014-04-09 | Multi-Stage Fracture | 3211.70 | 3211.80 | 0 |
2014-04-28 | Multi-Stage Fracture | 3168.00 | 3168.10 | 0 |
2014-04-28 | Multi-Stage Fracture | 3123.70 | 3123.80 | 0 |
2014-04-28 | Multi-Stage Fracture | 3080.70 | 3080.80 | 0 |
2014-04-28 | Multi-Stage Fracture | 3036.30 | 3036.40 | 0 |
2014-04-28 | Multi-Stage Fracture | 2994.00 | 2994.10 | 0 |
2014-04-28 | Multi-Stage Fracture | 2949.70 | 2949.80 | 0 |
2014-04-28 | Multi-Stage Fracture | 2905.70 | 2905.80 | 0 |
2014-04-28 | Multi-Stage Fracture | 2861.60 | 2861.70 | 0 |
2014-04-28 | Multi-Stage Fracture | 2830.80 | 2830.90 | 0 |
2014-04-28 | Multi-Stage Fracture | 2801.20 | 2801.30 | 0 |
2014-04-28 | Multi-Stage Fracture | 2771.60 | 2771.70 | 0 |
2014-04-28 | Multi-Stage Fracture | 2741.60 | 2741.70 | 0 |
2014-04-28 | Multi-Stage Fracture | 2710.80 | 2710.90 | 0 |
2014-04-28 | Multi-Stage Fracture | 2680.00 | 2680.10 | 0 |
2014-04-28 | Multi-Stage Fracture | 2649.30 | 2649.40 | 0 |
2014-04-28 | Multi-Stage Fracture | 2618.50 | 2618.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-04-08 | 2014-04-28 | 2,379 | 3,309 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 88.343 | N/A | |||
20/40 Atlas CRC | Calfrac | Hexamethylenetetramine | 100-97-0 | 100 | 1.1523 | N/A | ||
Phenolic Resin | 9003-35-4 | 100 | 1.1523 | N/A | ||||
Quartz (SiO2) | 14808-60-7 | 100 | 1.1523 | N/A | ||||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 8.7459 | N/A | ||
15% HCl | Calfrac | Acid | Hydrochloric acid | 7647-01-0 | 100 | 1.1061 | N/A | |
Water | 7732-18-5 | 100 | 1.1061 | N/A | ||||
DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0205 | N/A | |
Water | 7732-18-5 | 100 | 0.0215 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.2574 | N/A | |
DWP-937 | Calfrac | Demulsifier | Citrus terpenes | 94266-47-4 | 100 | 0.1169 | N/A | |
Isopropanol | 67-63-0 | 100 | 0.1184 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1169 | N/A | ||||
Triethylene glycol | 112-27-6 | 100 | 0.1184 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1178 | N/A | ||||
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1311 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-04-01 | 2014-04-28 | Waste Water - Municipal | 3650 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 4571 | 0.0 | 0.0 | 0.0 |
2015 | 8663 | 0.0 | 0.0 | 0.0 |
2016 | 8614 | 0.0 | 0.0 | 0.0 |
2017 | 8735 | 0.0 | 0.0 | 0.0 |
2018 | 8516 | 0.0 | 0.0 | 0.0 |
2019 | 8679 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-03-11 | No Incident Encountered | 0.00 | 0.00 |
2014-05-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]