If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0765053502000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. ![]() |
Location: 00/02-35-076-05W5/0 | |
Location Alias: 00/02-35-76-05 W5M | |
Location Alias 2: 00/02-35-076-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 5 | |
Range: 05 | |
Section: 35 | |
County/Municipality: Municipal District of Lesser Slave River No. 124 | |
Well Name: DELTASTREAM HZ MARTEN 2-35-76-5 | |
Operator Name: Deltastream Energy Corporation | |
License Number: 0486933 | |
License Date: 2017-12-07 | |
License Status: Issued | |
Spud Date: 2018-02-08 | |
Final Drill Date: 2018-02-14 | |
Well Total Depth: 2460.00 m | |
Surface Hole Latitude: 55.637058 | |
Surface Hole Longitude: -114.664288 |
Date | Event |
---|---|
2017-12-07 | Obtained License |
2018-02-09 | Surface Casing Operation Performed |
2018-02-10 | Direction Drilling Operation Performed - Deviate |
2018-02-10 | Direction Drilling Operation Performed - Horizontal |
2018-02-10 | Well Log Performed |
2018-02-11 | Intermediate Casing Operation Performed |
2018-02-14 | Finished Drilling |
2018-02-14 | Perforation Treatment Performed - Open-Hole Completion |
2018-02-14 | Well Log Performed |
2018-02-14 | Well Mode changed to Drilled and Cased |
2018-02-26 | Rig Released |
2018-03-07 | Well Began Production |
2018-03-07 | Well Fluid changed to Crude Oil |
2018-03-07 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-02-08 | Precision Drilling Corporation | 294 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-02-10 | 310.00 | Deviate (5 - 79 degrees) |
2018-02-10 | 752.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-02-14 | Open Hole/Barefoot Completion | 818.00 | 2460.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 5545 | 0.0 | 0.0 | 0.0 |
2019 | 8399 | 0.0 | 0.0 | 0.0 |
2020 | 1824 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]