X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0936133613000

Well Details

Well ID: 0936133613000
Loading map...
Location: 00/13-36-093-13W6/0
Location Alias: 00/13-36-93-13 W6M
Location Alias 2: 00/13-36-093-13 W6/00
Country: Canada
Province: Alberta
Township: 093
Meridian: 6
Range: 13
Section: 36
County/Municipality: Clear Hills County
Well Name: RAVEN FIRSTLAND MEARON 13-36-93-13
Operator Name: Lightstream Resources Ltd.
License Number: 0265575
License Date: 2002-01-04
License Status: RecCertified
Spud Date: 2002-01-10
Final Drill Date: 2002-02-12
Well Total Depth: 2822.00 m
Surface Hole Latitude: 57.118232
Surface Hole Longitude: -119.95237

For data sources see[1][2]

Well History

Date Event
2002-01-04 Obtained License
2002-01-29 Direction Drilling Operation Performed - Deviate
2002-02-02 Surface Casing Operation Performed
2002-02-06 Well Log Performed
2002-02-08 Intermediate Casing Operation Performed
2002-02-12 Finished Drilling
2002-02-14 Well Log Performed
2002-02-15 Well Log Performed
2002-02-16 Rig Released
2002-02-16 Well Mode changed to Drilled and Cased
2002-02-24 Well Log Performed
2002-02-25 Perforation Treatment Performed - Jet Perforation
2002-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-27 Plug Back Performed
2002-02-28 Perforation Treatment Performed - Jet Perforation
2002-02-28 Well Log Performed
2002-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-01 Perforation Treatment Performed - Remedial Casing
2002-03-03 Perforation Treatment Performed - Jet Perforation
2002-03-03 Well Log Performed
2002-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-05 Perforation Treatment Performed - Remedial Casing
2002-03-11 Well Abandoned
2002-03-11 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-01-29 1756.50 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-02-25 Perforation 968.50 972.50 13
2002-02-27 Packing Device Capped w/Cement 952.00 960.00 0
2002-02-28 Perforation 510.00 511.00 17
2002-03-01 Acid Treatment 510.00 511.00 0
2002-03-01 Remedial Casing Cementing 510.00 511.00 0
2002-03-03 Perforation 475.00 476.00 17
2002-03-04 Acid Treatment 475.00 476.00 0
2002-03-05 Remedial Casing Cementing 475.00 476.00 0

For data sources see[5]



References