If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395030215023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.3302,"lon":-114.314349,"icon":""}]} |
Location: 02/15-02-039-03W5/3 | |
Location Alias: 02/15-02-39-03 W5M | |
Location Alias 2: 02/15-02-039-03 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 03 | |
Section: 02 | |
County/Municipality: Lacombe County | |
Well Name: NNR MEDRIV 16-2-39-3 | |
Operator Name: New North Resources Ltd. | |
License Number: 0294256 | |
License Date: 2003-10-08 | |
License Status: Amended | |
Spud Date: 2003-10-17 | |
Final Drill Date: 2003-11-14 | |
Well Total Depth: 2681.50 m | |
Surface Hole Latitude: 52.330200 | |
Surface Hole Longitude: -114.314349 |
Date | Event |
---|---|
2003-10-08 | Obtained License |
2003-10-19 | Surface Casing Operation Performed |
2003-10-23 | Direction Drilling Operation Performed - Horizontal |
2003-10-29 | Direction Drilling Operation Performed - Horizontal |
2003-11-05 | Intermediate Casing Operation Performed |
2003-11-09 | Direction Drilling Operation Performed - Horizontal |
2003-11-14 | Finished Drilling |
2003-11-14 | Perforation Treatment Performed - Open-Hole Completion |
2003-11-14 | Well Mode changed to Drilled and Cased |
2003-11-15 | Rig Released |
2003-11-29 | Well Began Production |
2003-11-29 | Well Fluid changed to Gas |
2003-11-29 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2003-10-23 | 1821.00 | Horizontal |
2003-10-29 | 1981.00 | Horizontal |
2003-11-09 | 2278.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-11-14 | Open Hole/Barefoot Completion | 2226.80 | 2681.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 603 | 0.0 | 0.0 | 0.0 |
2004 | 7982 | 0.0 | 0.0 | 0.0 |
2005 | 8716 | 0.0 | 0.0 | 0.0 |
2006 | 8759 | 0.0 | 0.0 | 0.0 |
2007 | 8758 | 0.0 | 0.0 | 0.0 |
2008 | 8707 | 0.0 | 0.0 | 0.0 |
2009 | 7655 | 0.0 | 0.0 | 0.0 |
2010 | 4197 | 0.0 | 0.0 | 0.0 |
2011 | 4757 | 0.0 | 0.0 | 0.0 |
2012 | 1581 | 0.0 | 0.0 | 0.0 |
2013 | 1228 | 0.0 | 0.0 | 0.0 |
2014 | 1097 | 0.0 | 0.0 | 0.0 |
2015 | 965 | 0.0 | 0.0 | 0.0 |
2016 | 805 | 0.0 | 0.0 | 0.0 |
2017 | 1128 | 0.0 | 0.0 | 0.0 |
2018 | 3380 | 0.0 | 0.0 | 0.0 |
2019 | 6839 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]