If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395031109000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.336809,"lon":-114.31767,"icon":""}]} |
Location: 00/09-11-039-03W5/0 | |
Location Alias: 00/09-11-39-03 W5M | |
Location Alias 2: 00/09-11-039-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 03 | |
Section: 11 | |
County/Municipality: Lacombe County | |
Well Name: NNR MEDRIV 9-11-39-3 | |
Operator Name: New North Resources Ltd. | |
License Number: 0313376 | |
License Date: 2004-08-16 | |
License Status: Issued | |
Spud Date: 2004-10-03 | |
Final Drill Date: 2004-10-23 | |
Well Total Depth: 2525.00 m | |
Surface Hole Latitude: 52.336809 | |
Surface Hole Longitude: -114.31767 |
Date | Event |
---|---|
2004-08-16 | Obtained License |
2004-10-05 | Surface Casing Operation Performed |
2004-10-16 | Intermediate Casing Operation Performed |
2004-10-18 | Direction Drilling Operation Performed - Horizontal |
2004-10-22 | Well Log Performed |
2004-10-23 | Finished Drilling |
2004-10-23 | Well Mode changed to Drilled and Cased |
2004-10-24 | Rig Released |
2004-10-26 | Perforation Treatment Performed - Open-Hole Completion |
2004-11-14 | Well Began Production |
2004-11-14 | Well Fluid changed to Gas |
2004-11-14 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2004-10-18 | 2190.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-10-26 | Open Hole/Barefoot Completion | 2190.00 | 2525.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 1065 | 0.0 | 0.0 | 0.0 |
2005 | 8730 | 0.0 | 0.0 | 0.0 |
2006 | 8759 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8732 | 0.0 | 0.0 | 0.0 |
2009 | 8727 | 0.0 | 0.0 | 0.0 |
2010 | 8730 | 0.0 | 0.0 | 0.0 |
2011 | 8523 | 0.0 | 0.0 | 0.0 |
2012 | 8699 | 0.0 | 0.0 | 0.0 |
2013 | 8722 | 0.0 | 0.0 | 0.0 |
2014 | 8723 | 0.0 | 0.0 | 0.0 |
2015 | 8367 | 0.0 | 0.0 | 0.0 |
2016 | 3795 | 0.0 | 0.0 | 0.0 |
2017 | 5040 | 0.0 | 0.0 | 0.0 |
2018 | 5698 | 0.0 | 0.0 | 0.0 |
2019 | 5327 | 0.0 | 0.0 | 0.0 |
2020 | 1966 | 0.0 | 0.0 | 0.0 |
For data sources see[6]