If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0785252308000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.774647,"lon":-117.752887,"icon":""}]} |
Location: 00/08-23-078-25W5/0 | |
Location Alias: 00/08-23-78-25 W5M | |
Location Alias 2: 00/08-23-078-25 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 5 | |
Range: 25 | |
Section: 23 | |
County/Municipality: Birch Hills County | |
Well Name: CNRL EAGLEN 8-23-78-25 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0140885 | |
License Date: 1989-09-11 | |
License Status: Suspension | |
Spud Date: 1989-09-12 | |
Final Drill Date: 1989-10-02 | |
Well Total Depth: 2065.00 m | |
Surface Hole Latitude: 55.774647 | |
Surface Hole Longitude: -117.752887 |
Date | Event |
---|---|
1989-09-11 | Obtained License |
1989-09-16 | Surface Casing Operation Performed |
1989-09-19 | Lost Circulation Occurred |
1989-09-22 | Direction Drilling Operation Performed - Deviate |
1989-10-02 | Finished Drilling |
1989-10-02 | Well Log Performed |
1989-10-03 | Drill Stem Test Performed |
1989-10-03 | Well Log Performed |
1989-10-06 | Production Casing Operation Performed |
1989-10-07 | Rig Released |
1989-10-07 | Well Mode changed to Drilled and Cased |
1989-10-14 | Well Log Performed |
1989-10-15 | Perforation Treatment Performed - Jet Perforation |
1989-10-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-10-17 | Well Began Production |
1989-10-17 | Well Fluid changed to Crude Oil |
1989-10-17 | Well Mode changed to Flowing |
1989-11-20 | Well Log Performed |
1991-06-01 | Well Fluid changed to Crude Oil |
1991-06-01 | Well Mode changed to Pumping |
1991-11-15 | Perforation Treatment Performed - Jet Perforation |
1991-11-15 | Well Log Performed |
1991-11-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-12-01 | Well Fluid changed to Crude Oil |
1991-12-01 | Well Mode changed to Suspended |
2000-12-03 | Well Fluid changed to Crude Oil |
2000-12-03 | Well Mode changed to Suspended |
2001-07-05 | Well Log Performed |
2001-07-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-07-06 | Plug Back Performed |
2001-07-06 | Well Fluid changed to Crude Oil |
2001-07-06 | Well Mode changed to Abandoned Zone |
2001-07-08 | Well Log Performed |
2001-07-09 | Perforation Treatment Performed - Jet Perforation |
2001-07-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-07-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-07-11 | Well Log Performed |
2001-07-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-07-12 | Plug Back Performed |
2001-07-13 | Well Log Performed |
2001-07-14 | Perforation Treatment Performed - Jet Perforation |
2002-03-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-03-03 | Plug Back Performed |
2002-03-03 | Well Log Performed |
2002-03-04 | Perforation Treatment Performed - Jet Perforation |
2002-03-04 | Well Log Performed |
2002-03-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-03-07 | Plug Back Performed |
2002-03-07 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1989-09-22 | 1574.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-10-15 | Perforation | 1959.00 | 1966.00 | 13 |
1989-10-16 | Acid Treatment | 1959.00 | 1966.00 | 0 |
1991-11-15 | Perforation | 1938.00 | 1944.00 | 13 |
1991-11-16 | Acid Treatment | 1938.00 | 1944.00 | 0 |
2001-07-06 | Packing Device Capped w/Cement | 1926.00 | 1934.00 | 0 |
2001-07-09 | Perforation | 1716.00 | 1723.00 | 17 |
2001-07-10 | Acid Treatment | 1716.00 | 1723.00 | 0 |
2001-07-11 | Acid Treatment | 1716.00 | 1723.00 | 0 |
2001-07-12 | Packing Device Capped w/Cement | 1703.00 | 1711.00 | 0 |
2001-07-14 | Perforation | 1102.00 | 1104.00 | 17 |
2002-03-03 | Packing Device Capped w/Cement | 1082.00 | 1090.00 | 0 |
2002-03-04 | Perforation | 841.00 | 844.00 | 17 |
2002-03-07 | Packing Device Capped w/Cement | 828.00 | 836.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 1799 | 0.0 | 0.0 | 0.0 |
1990 | 8229 | 0.0 | 0.0 | 0.0 |
1991 | 5488 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1989-09-19 | Lost Circulation | 1082.00 | 1574.00 |
For data sources see[7]