If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786011816024 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.764645,"lon":-118.133462,"icon":""}]} |
Location: 02/16-18-078-01W6/4 | |
Location Alias: 02/16-18-78-01 W6M | |
Location Alias 2: 02/16-18-078-01 W6/04 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 01 | |
Section: 18 | |
County/Municipality: Birch Hills County | |
Well Name: CNRL BELLOY 16-18-78-1 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0155223 | |
License Date: 1992-12-18 | |
License Status: Issued | |
Spud Date: 1993-01-01 | |
Final Drill Date: 1993-01-08 | |
Well Total Depth: 1646.00 m | |
Surface Hole Latitude: 55.764645 | |
Surface Hole Longitude: -118.133462 |
Date | Event |
---|---|
1992-12-18 | Obtained License |
1993-01-02 | Surface Casing Operation Performed |
1993-01-08 | Finished Drilling |
1993-01-08 | Well Log Performed |
1993-01-08 | Well Mode changed to Drilled and Cased |
1993-01-09 | Well Log Performed |
1993-01-10 | Drill Stem Test Performed |
1993-01-11 | Drill Stem Test Performed |
1993-01-13 | Drill Stem Test Performed |
1993-01-14 | Drill Stem Test Performed |
1993-01-15 | Perforation Treatment Performed - Jet Perforation |
1993-01-16 | Production Casing Operation Performed |
1993-01-16 | Rig Released |
1993-02-14 | Well Log Performed |
1993-02-15 | Well Log Performed |
1993-02-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-02-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-02-21 | Perforation Treatment Performed - Jet Perforation |
1993-02-21 | Well Log Performed |
1993-02-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-05-15 | Well Log Performed |
1993-05-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-05-16 | Perforation Treatment Performed - Jet Perforation |
1993-05-16 | Plug Back Performed |
1993-05-17 | Perforation Treatment Performed - Fractured |
1993-05-19 | Well Log Performed |
1993-05-25 | Perforation Treatment Performed - Fractured |
1993-05-27 | Well Log Performed |
1993-11-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-11-13 | Perforation Treatment Performed - Jet Perforation |
1993-11-13 | Well Log Performed |
1993-11-14 | Perforation Treatment Performed - Fractured |
1993-11-20 | Well Log Performed |
1993-11-21 | Perforation Treatment Performed - Jet Perforation |
1993-11-23 | Perforation Treatment Performed - Fractured |
1993-11-27 | Well Log Performed |
1994-08-06 | Well Log Performed |
1994-08-07 | Well Log Performed |
1994-08-09 | Well Log Performed |
1994-09-09 | Well Log Performed |
2000-12-15 | Well Log Performed |
2000-12-16 | Perforation Treatment Performed - Jet Perforation |
2000-12-20 | Perforation Treatment Performed - Fractured |
2001-01-07 | Well Log Performed |
2001-01-10 | Perforation Treatment Performed - Fractured |
2001-01-19 | Well Began Production |
2001-01-19 | Well Fluid changed to Gas |
2001-01-19 | Well Mode changed to Flowing |
2005-02-01 | Well Fluid changed to Gas |
2005-02-01 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-01-15 | Perforation | 1613.00 | 1615.00 | 13 |
1993-02-17 | Acid Treatment | 1613.00 | 1615.00 | 0 |
1993-02-19 | Acid Treatment | 1613.00 | 1615.00 | 0 |
1993-02-21 | Perforation | 1541.00 | 1545.00 | 14 |
1993-02-22 | Acid Treatment | 1541.00 | 1545.00 | 0 |
1993-05-16 | Packing Device Capped w/Cement | 1599.00 | 1607.00 | 0 |
1993-05-16 | Perforation | 1569.00 | 1574.00 | 13 |
1993-05-17 | Fracture | 1569.00 | 1574.00 | 0 |
1993-05-25 | Fracture | 1569.00 | 1574.00 | 0 |
1993-11-12 | Packing Device Capped w/Cement | 1530.00 | 1538.00 | 0 |
1993-11-13 | Perforation | 1511.50 | 1515.00 | 13 |
1993-11-14 | Fracture | 1511.50 | 1515.00 | 0 |
1993-11-21 | Perforation | 1445.00 | 1449.50 | 13 |
1993-11-23 | Fracture | 1445.00 | 1449.50 | 0 |
2000-12-16 | Perforation | 1411.00 | 1413.00 | 20 |
2000-12-16 | Perforation | 1351.00 | 1353.00 | 20 |
2000-12-20 | Fracture | 1411.00 | 1413.00 | 0 |
2001-01-10 | Fracture | 1351.00 | 1353.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 8300 | 0.0 | 0.0 | 0.0 |
2002 | 8735 | 0.0 | 0.0 | 0.0 |
2003 | 8509 | 0.0 | 0.0 | 0.0 |
2004 | 8706 | 0.0 | 0.0 | 0.0 |
2005 | 8015 | 0.0 | 0.0 | 0.0 |
2006 | 8697 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8589 | 0.0 | 0.0 | 0.0 |
2009 | 7353 | 0.0 | 0.0 | 0.0 |
2010 | 7775 | 0.0 | 0.0 | 0.0 |
2011 | 8560 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8687 | 0.0 | 0.0 | 0.0 |
2014 | 8687 | 0.0 | 0.0 | 0.0 |
2015 | 8656 | 0.0 | 0.0 | 0.0 |
2016 | 8553 | 0.0 | 0.0 | 0.0 |
2017 | 8735 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 1872 | 0.0 | 0.0 | 0.0 |
2020 | 504 | 0.0 | 0.0 | 0.0 |
For data sources see[5]