If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494253014002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.263278,"lon":-113.649947,"icon":""}]} |
Location: 00/14-30-049-25W4/2 | |
Location Alias: 00/14-30-49-25 W4M | |
Location Alias 2: 00/14-30-049-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 25 | |
Section: 30 | |
County/Municipality: Leduc County | |
Well Name: MEC LEDUC-WB 14-30-49-25 | |
Operator Name: NEP Canada ULC | |
License Number: 0006298 | |
License Date: 1953-04-09 | |
License Status: Issued | |
Spud Date: 1953-04-30 | |
Final Drill Date: 1953-05-24 | |
Well Total Depth: 1634.30 m | |
Surface Hole Latitude: 53.263278 | |
Surface Hole Longitude: -113.649947 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-04-09 | Obtained License |
1953-05-10 | Drill Stem Test Performed |
1953-05-15 | Drill Stem Test Performed |
1953-05-16 | Drill Stem Test Performed |
1953-05-19 | Liner Casing Operation Performed |
1953-05-23 | Drill Stem Test Performed |
1953-05-24 | Finished Drilling |
1953-05-24 | Well Mode changed to Drilled and Cased |
1953-05-26 | Perforation Treatment Performed - Jet Perforation |
1954-12-21 | Perforation Treatment Performed - Jet Perforation |
1955-08-30 | Well Began Injection |
1955-08-30 | Well Fluid changed to Gas |
1955-08-30 | Well Type changed to Injection |
1963-01-01 | Well Fluid changed to Gas |
1963-01-01 | Well Mode changed to Suspended |
1963-01-01 | Well Type changed to Injection |
1975-10-01 | Perforation Treatment Performed - Cement Squeeze |
1975-10-08 | Perforation Treatment Performed - Jet Perforation |
1975-10-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-12-15 | Perforation Treatment Performed - Cement Squeeze |
1979-01-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-01-09 | Perforation Treatment Performed - Jet Perforation |
1989-03-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-03-29 | Perforation Treatment Performed - Cement Squeeze |
1989-03-29 | Well Log Performed |
1989-03-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-03-31 | Perforation Treatment Performed - Jet Perforation |
1996-03-26 | Well Log Performed |
1996-03-27 | Perforation Treatment Performed - Cement Squeeze |
1996-03-29 | Perforation Treatment Performed - Jet Perforation |
1996-03-29 | Well Log Performed |
1996-04-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-08-06 | Well Log Performed |
1997-08-07 | Well Log Performed |
1998-03-25 | Perforation Treatment Performed - Cement Squeeze |
1998-03-25 | Plug Back Performed |
1998-03-26 | Perforation Treatment Performed - Jet Perforation |
1998-03-26 | Well Log Performed |
1998-03-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-05-22 | Well Log Performed |
1998-05-23 | Perforation Treatment Performed - Cement Squeeze |
1998-05-23 | Plug Back Performed |
1998-05-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-05-24 | Perforation Treatment Performed - Jet Perforation |
1998-05-24 | Well Log Performed |
1999-11-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-11-03 | Plug Back Performed |
1999-11-03 | Well Fluid changed to Gas |
1999-11-03 | Well Mode changed to Abandoned Zone |
1999-11-03 | Well Type changed to Injection |
1999-11-04 | Perforation Treatment Performed - Jet Perforation |
2003-01-07 | Perforation Treatment Performed - Cement Squeeze |
2003-01-07 | Plug Back Performed |
2003-01-09 | Perforation Treatment Performed - Jet Perforation |
2003-01-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-05-26 | Perforation | 1627.30 | 1628.90 | 13 |
1954-12-21 | Perforation | 1595.60 | 1598.70 | 13 |
1975-10-01 | Cement Squeeze | 1595.60 | 1628.90 | 0 |
1975-10-08 | Perforation | 1624.00 | 1624.60 | 7 |
1975-10-09 | Acid Treatment | 1624.00 | 1624.60 | 0 |
1978-12-15 | Cement Squeeze | 1595.60 | 1624.60 | 0 |
1979-01-09 | Perforation | 1623.10 | 1623.40 | 7 |
1979-01-09 | Acid Treatment | 1623.10 | 1623.40 | 0 |
1989-03-28 | Acid Treatment | 1623.10 | 1623.40 | 0 |
1989-03-29 | Cement Squeeze | 1623.10 | 1623.40 | 0 |
1989-03-31 | Perforation | 1620.10 | 1620.40 | 13 |
1989-03-31 | Acid Treatment | 1620.10 | 1620.40 | 0 |
1996-03-27 | Cement Squeeze | 1620.10 | 1620.40 | 0 |
1996-03-29 | Perforation | 1615.20 | 1615.50 | 13 |
1996-04-11 | Acid Treatment | 1615.20 | 1615.50 | 0 |
1998-03-25 | Cement Squeeze | 1615.20 | 1615.50 | 0 |
1998-03-26 | Perforation | 1596.00 | 1597.00 | 13 |
1998-03-27 | Acid Treatment | 1596.00 | 1597.00 | 0 |
1998-05-23 | Cement Squeeze | 1596.00 | 1597.00 | 0 |
1998-05-24 | Perforation | 1591.00 | 1592.00 | 18 |
1998-05-24 | Acid Treatment | 1591.00 | 1592.00 | 0 |
1999-11-03 | Packing Device Capped w/Cement | 1572.00 | 1580.00 | 0 |
1999-11-04 | Perforation | 1331.00 | 1333.50 | 17 |
2003-01-07 | Cement Squeeze | 1331.00 | 1333.50 | 0 |
2003-01-09 | Perforation | 1591.00 | 1592.00 | 17 |
2003-01-13 | Acid Treatment | 1591.00 | 1592.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]