If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-003-22157 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.212797,"lon":-79.882661,"icon":""}]} |
Operator Name: KRIEBEL MINERALS INC | |
First Permit Date: 2010-12-13 | |
Last Permit Date: 2010-12-13 | |
Spud Date: 2011-01-12 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.212797 | |
Longitude: -79.882661 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 5222.0 | 334.0 | 0.0 | 0.0 | 55.0 | 334.0 |
2012-0 | 6969.0 | 335.0 | 0.0 | 0.0 | 75.0 | 335.0 |
2011-0 | 8071.0 | 303.0 | 0.0 | 0.0 | 75.0 | 365.0 |
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | PRODUCED FLUID | 10.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2012-0 | PRODUCED FLUID | 20.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2011-0 | FRACING FLUID WASTE | 270.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2011-0 | DRILLING FLUID WASTE | 1710.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2011-0 | FRACING FLUID WASTE | 310.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2012-0 | PRODUCED FLUID | 10.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2012-0 | PRODUCED FLUID | 20.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1947949 | 2011-01-12 | No Violations Noted | On January 12th, 2010 I visited this site as a routine inspection. Drilling had not yet started. The pad and pit had been constructed. The access road was in good condition. A Site ID and E&S plan were posted on site. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The E&S controls on the lower side of the pad could use some maintenance, however no erosion is occurring yet and no material has left the pad. | |
1952924 | 2011-01-14 | No Violations Noted | On January 14th, 2011 I visited this site as a routine inspection. Drilling had started. The pad and pit had been constructed. The access road was in good condition. A Site ID and E&S plan were posted on site. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The E&S controls on the lower side of the pad could use some maintenance, however no erosion is occurring yet and no material has left the pad. | |
1953011 | 2011-01-20 | No Violations Noted | On January 20th, 2011 I visited this site as a routine inspection. Drilling was taking place. The access road was beginning to need maintenance. A Site ID and E&S plan were posted on site. The pit appeared to be in good condition. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | |
1953937 | 2011-01-12 | No Violations Noted | SITE IS BUILT. PIT IS NOT LINED. NO RIG. | |
1954053 | 2011-01-20 | No Violations Noted | FALCON RIG #19 DRILLING AT 1400'.
SITE, PIT, E&S, AND ACCESS OK. |
|
1955629 | 2011-01-25 | No Violations Noted | FALCON RIG #19 RUNNING 4.5" CASING AND WILL CEMENT LATER IN THE DAY.
SITE, PIT, E&S, AND ACCESS OK. |
|
1955641 | 2011-02-04 | No Violations Noted | DRILLING COMPLETE AND 4.5" IS CEMENTED. | |
1957791 | 2011-01-28 | No Violations Noted | On January 28th, 2011 I visited this site as a routine inspection. Drilling was completed. The rig had moved offsite. The access road appeared to be in good condition. A Site ID and E&S plan were posted on site. The pit appeared to be in good condition and water trucks were removing water from the pit. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | |
1957859 | 2011-02-03 | No Violations Noted | On February 3rd, 2011 I visited this site as a routine inspection. Drilling and frac were completed. The access road was becoming soft with the thaw. A Site ID and E&S plan were posted on site. The pit appeared to be in good condition and was empty. E&S controls in the lowere corner needed maintenance again. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | |
1958402 | 2011-02-09 | No Violations Noted | On February 9th, 2011 I visited this site as a routine inspection. Drilling was completed but the well was not yet in production. The access road was in good condition. A Site ID and E&S plan were posted on site. The pit was closed. Equipment was on site restoring the pad. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. | |
1958653 | 2011-02-17 | No Violations Noted | On February 17th, 2011 I visited this site as a routine inspection. Drilling was completed and the well was in production. The access road was in good condition. A Site ID and E&S plan were posted on site. The pit was closed. The site was rough graded. Additional riprap was added to the lower E&S controls. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and 70% vegetative cover is achieved. | |
1992060 | 2011-07-08 | No Violations Noted | On July 8th, 2011 I visited this site as a routine inspection. Drilling was completed and the well was in production. The access road was in good condition. The site was restored and well vegetated. A well tag was present. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. |