37-003-22157

Well Details

Well ID: 37-003-22157
Loading map...
Operator Name: KRIEBEL MINERALS INC
First Permit Date: 2010-12-13
Last Permit Date: 2010-12-13
Spud Date: 2011-01-12
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.212797
Longitude: -79.882661

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 5222.0 334.0 0.0 0.0 55.0 334.0
2012-0 6969.0 335.0 0.0 0.0 75.0 335.0
2011-0 8071.0 303.0 0.0 0.0 75.0 365.0
2010-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 10.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2012-0 PRODUCED FLUID 20.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA
2011-0 FRACING FLUID WASTE 270.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2011-0 DRILLING FLUID WASTE 1710.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2011-0 FRACING FLUID WASTE 310.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2012-0 PRODUCED FLUID 10.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2012-0 PRODUCED FLUID 20.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY JOSEPHINE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1947949 2011-01-12 No Violations Noted On January 12th, 2010 I visited this site as a routine inspection. Drilling had not yet started. The pad and pit had been constructed. The access road was in good condition. A Site ID and E&S plan were posted on site. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The E&S controls on the lower side of the pad could use some maintenance, however no erosion is occurring yet and no material has left the pad.
1952924 2011-01-14 No Violations Noted On January 14th, 2011 I visited this site as a routine inspection. Drilling had started. The pad and pit had been constructed. The access road was in good condition. A Site ID and E&S plan were posted on site. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The E&S controls on the lower side of the pad could use some maintenance, however no erosion is occurring yet and no material has left the pad.
1953011 2011-01-20 No Violations Noted On January 20th, 2011 I visited this site as a routine inspection. Drilling was taking place. The access road was beginning to need maintenance. A Site ID and E&S plan were posted on site. The pit appeared to be in good condition. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection.
1953937 2011-01-12 No Violations Noted SITE IS BUILT. PIT IS NOT LINED. NO RIG.
1954053 2011-01-20 No Violations Noted FALCON RIG #19 DRILLING AT 1400'.

SITE, PIT, E&S, AND ACCESS OK.

1955629 2011-01-25 No Violations Noted FALCON RIG #19 RUNNING 4.5" CASING AND WILL CEMENT LATER IN THE DAY.

SITE, PIT, E&S, AND ACCESS OK.

1955641 2011-02-04 No Violations Noted DRILLING COMPLETE AND 4.5" IS CEMENTED.
1957791 2011-01-28 No Violations Noted On January 28th, 2011 I visited this site as a routine inspection. Drilling was completed. The rig had moved offsite. The access road appeared to be in good condition. A Site ID and E&S plan were posted on site. The pit appeared to be in good condition and water trucks were removing water from the pit. E&S controls were constructed according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection.
1957859 2011-02-03 No Violations Noted On February 3rd, 2011 I visited this site as a routine inspection. Drilling and frac were completed. The access road was becoming soft with the thaw. A Site ID and E&S plan were posted on site. The pit appeared to be in good condition and was empty. E&S controls in the lowere corner needed maintenance again. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection.
1958402 2011-02-09 No Violations Noted On February 9th, 2011 I visited this site as a routine inspection. Drilling was completed but the well was not yet in production. The access road was in good condition. A Site ID and E&S plan were posted on site. The pit was closed. Equipment was on site restoring the pad. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection.
1958653 2011-02-17 No Violations Noted On February 17th, 2011 I visited this site as a routine inspection. Drilling was completed and the well was in production. The access road was in good condition. A Site ID and E&S plan were posted on site. The pit was closed. The site was rough graded. Additional riprap was added to the lower E&S controls. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site is restored and 70% vegetative cover is achieved.
1992060 2011-07-08 No Violations Noted On July 8th, 2011 I visited this site as a routine inspection. Drilling was completed and the well was in production. The access road was in good condition. The site was restored and well vegetated. A well tag was present. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection.