X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324201502000

Well Details

Well ID: 0324201502000
Loading map...
Location: 00/02-15-032-20W4/0
Location Alias: 00/02-15-32-20 W4M
Location Alias 2: 00/02-15-032-20 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 20
Section: 15
County/Municipality: Starland County
Well Name: TEAC ROWLEY 2-15-32-20
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0065998
License Date: 1977-10-04
License Status: Suspension
Spud Date: 1977-10-07
Final Drill Date: 1977-10-15
Well Total Depth: 1402.10 m
Surface Hole Latitude: 51.737272
Surface Hole Longitude: -112.753388

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-10-04 Obtained License
1977-10-15 Finished Drilling
1977-10-15 Well Mode changed to Drilled and Cased
1977-10-16 Drill Stem Test Performed
1977-10-17 Drill Stem Test Performed
1977-10-18 Production Casing Operation Performed
1977-11-08 Perforation Treatment Performed - Jet Perforation
1977-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-17 Well Began Production
1977-11-17 Well Fluid changed to Crude Oil
1977-11-17 Well Mode changed to Pumping
1978-02-24 Perforation Treatment Performed - Jet Perforation
1978-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-02 Perforation Treatment Performed - Fractured
2003-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-12-13 Well Log Performed
2006-12-11 Well Fluid changed to Crude Oil
2006-12-11 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-11-08 Perforation 1360.90 1362.20 3
1977-11-08 Perforation 1365.50 1367.30 3
1977-11-08 Perforation 1370.40 1371.00 3
1977-11-08 Perforation 1372.50 1373.10 3
1977-11-09 Acid Treatment 1360.90 1373.10 0
1978-02-24 Perforation 1354.20 1357.90 3
1978-02-25 Acid Treatment 1354.20 1373.10 0
1990-10-02 Fracture 1360.60 1373.10 0
2003-12-13 Packing Device Capped w/Cement 1338.00 1346.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 1041 0.0 0.0 0.0
1978 8451 0.0 0.0 0.0
1979 6074 0.0 0.0 0.0
1980 4155 0.0 0.0 0.0
1981 4275 0.0 0.0 0.0
1982 8210 0.0 0.0 0.0
1983 6227 0.0 0.0 0.0
1984 4686 0.0 0.0 0.0
1985 7951 0.0 0.0 0.0
1986 8759 0.0 0.0 0.0
1987 8735 0.0 0.0 0.0
1988 8328 0.0 0.0 0.0
1989 8589 0.0 0.0 0.0
1990 6761 0.0 0.0 0.0
1991 8704 0.0 0.0 0.0
1992 8744 0.0 0.0 0.0
1993 8755 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 6599 0.0 0.0 0.0
2001 2256 0.0 0.0 0.0

For data sources see[5]

References