X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0345052202002

Well Details

Well ID: 0345052202002
Loading map...
Location: 00/02-22-034-05W5/2
Location Alias: 00/02-22-34-05 W5M
Location Alias 2: 00/02-22-034-05 W5/02
Country: Canada
Province: Alberta
Township: 034
Meridian: 5
Range: 05
Section: 22
County/Municipality: Clearwater County
Well Name: NNR CAROL 2-22-34-5
Operator Name: New North Resources Ltd.
License Number: 0045027
License Date: 1973-02-05
License Status: Issued
Spud Date: 1973-02-11
Final Drill Date: 1973-04-29
Well Total Depth: 2759.40 m
Surface Hole Latitude: 51.927951
Surface Hole Longitude: -114.624351

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-02-05 Obtained License
1973-04-29 Finished Drilling
1973-04-29 Well Mode changed to Drilled and Cased
1973-04-30 Drill Stem Test Performed
1973-05-01 Drill Stem Test Performed
1973-05-02 Drill Stem Test Performed
1973-05-04 Production Casing Operation Performed
1973-06-22 Perforation Treatment Performed - Jet Perforation
1973-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-27 Perforation Treatment Performed - Fractured
1973-06-27 Perforation Treatment Performed - Jet Perforation
1973-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-28 Perforation Treatment Performed - Jet Perforation
1973-06-29 Perforation Treatment Performed - Fractured
1973-06-30 Perforation Treatment Performed - Fractured
1973-08-20 Perforation Treatment Performed - Jet Perforation
1973-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-08-22 Perforation Treatment Performed - Fractured
1985-03-01 Well Began Production
1985-03-01 Well Fluid changed to Gas
1985-03-01 Well Mode changed to Flowing
1985-10-11 Well Fluid changed to Gas
1985-10-11 Well Mode changed to Suspended
1986-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-12-17 Plug Back Performed
1986-12-17 Well Fluid changed to Gas
1986-12-17 Well Mode changed to Suspended
1987-08-27 Well Fluid changed to Gas
1987-08-27 Well Mode changed to Abandoned Zone
1987-10-04 Perforation Treatment Performed - Jet Perforation
1989-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-27 Perforation Treatment Performed - Cement Squeeze
1989-08-27 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-06-22 Perforation 2682.50 2683.50 7
1973-06-22 Perforation 2684.10 2685.60 7
1973-06-23 Acid Treatment 2682.50 2685.60 0
1973-06-27 Perforation 2682.50 2683.50 7
1973-06-27 Perforation 2684.10 2685.60 7
1973-06-27 Perforation 2665.80 2667.60 7
1973-06-27 Fracture 2665.80 2685.60 0
1973-06-28 Perforation 2682.50 2683.50 7
1973-06-28 Perforation 2684.10 2685.60 7
1973-06-28 Perforation 2665.80 2667.60 7
1973-06-28 Acid Treatment 2665.80 2685.60 0
1973-06-29 Fracture 2665.80 2685.60 0
1973-06-30 Fracture 2665.80 2685.60 0
1973-08-20 Perforation 2427.10 2428.60 7
1973-08-22 Acid Treatment 2427.10 2428.60 0
1973-08-22 Fracture 2427.10 2428.60 0
1986-12-17 Packing Device Capped w/Cement 2635.00 2635.00 0
1987-10-04 Perforation 2665.80 2685.60 7
1989-08-27 Acid Treatment 2427.10 2428.60 0
1989-08-27 Cement Squeeze 2427.10 2428.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 376 0.0 0.0 0.0

For data sources see[5]

References