If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0716043012003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.179405,"lon":-118.609055,"icon":""}]} |
Location: 00/12-30-071-04W6/3 | |
Location Alias: 00/12-30-71-04 W6M | |
Location Alias 2: 00/12-30-071-04 W6/03 | |
Country: Canada | |
Province: Alberta | |
Township: 071 | |
Meridian: 6 | |
Range: 04 | |
Section: 30 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: CANAMAX GRANDPR 12-30-71-4 | |
Operator Name: Canamax Energy Ltd. | |
License Number: 0182521 | |
License Date: 1995-11-27 | |
License Status: Abandoned | |
Spud Date: 1995-12-02 | |
Final Drill Date: 1995-12-12 | |
Well Total Depth: 2055.00 m | |
Surface Hole Latitude: 55.179405 | |
Surface Hole Longitude: -118.609055 |
Date | Event |
---|---|
1995-11-27 | Obtained License |
1995-12-03 | Lost Circulation Occurred |
1995-12-03 | Surface Casing Operation Performed |
1995-12-12 | Finished Drilling |
1995-12-12 | Well Mode changed to Drilled and Cased |
1995-12-13 | Well Log Performed |
1995-12-14 | Drill Stem Test Performed |
1995-12-16 | Production Casing Operation Performed |
1995-12-16 | Rig Released |
1996-01-13 | Perforation Treatment Performed - Jet Perforation |
1996-01-16 | Perforation Treatment Performed - Fractured |
2003-09-21 | Perforation Treatment Performed - Jet Perforation |
2003-09-23 | Perforation Treatment Performed - Cement Squeeze |
2003-09-23 | Plug Back Performed |
2010-06-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-06-19 | Plug Back Performed |
2010-06-20 | Perforation Treatment Performed - Jet Perforation |
2010-06-22 | Perforation Treatment Performed - Fractured |
2019-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-02-27 | Plug Back Performed |
2019-02-27 | Well Log Performed |
2019-02-27 | Well Mode changed to Abandoned Zone |
2019-03-04 | Well Abandoned |
2019-03-04 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-01-13 | Perforation | 1997.20 | 2010.20 | 18 |
1996-01-13 | Perforation | 1992.80 | 1996.20 | 18 |
1996-01-13 | Perforation | 1989.80 | 1990.80 | 18 |
1996-01-13 | Perforation | 1982.00 | 1983.50 | 18 |
1996-01-16 | Fracture | 1982.00 | 2010.20 | 0 |
2003-09-21 | Perforation | 577.00 | 579.00 | 17 |
2003-09-23 | Cement Squeeze | 577.00 | 579.00 | 0 |
2010-06-19 | Packing Device Capped w/Cement | 1962.00 | 1970.00 | 0 |
2010-06-20 | Perforation | 967.50 | 971.00 | 17 |
2010-06-22 | Fracture | 967.50 | 971.00 | 0 |
2019-02-27 | Packing Device Capped w/Cement | 952.00 | 960.00 | 0 |
2019-02-27 | Packing Device Capped w/Cement | 564.00 | 572.00 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1995-12-03 | Lost Circulation | 108.00 | 319.00 |
2019-03-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]