If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0524260409002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.463282,"lon":-113.765062,"icon":""}]} |
Location: 00/09-04-052-26W4/2 | |
Location Alias: 00/09-04-52-26 W4M | |
Location Alias 2: 00/09-04-052-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 4 | |
Range: 26 | |
Section: 04 | |
County/Municipality: Stony Plain 135 | |
Well Name: CEDAR CREEK GSPIKE 9-4-52-26 | |
Operator Name: MAGA Energy Operations Ltd. | |
License Number: 0021599 | |
License Date: 1961-10-27 | |
License Status: Abandoned | |
Spud Date: 1961-11-05 | |
Final Drill Date: 1961-11-16 | |
Well Total Depth: 1567.60 m | |
Surface Hole Latitude: 53.463282 | |
Surface Hole Longitude: -113.765062 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1961-10-27 | Obtained License |
1961-11-16 | Finished Drilling |
1961-11-16 | Well Mode changed to Drilled and Cased |
1961-11-17 | Production Casing Operation Performed |
1961-12-03 | Perforation Treatment Performed - Bullet Perforation |
1961-12-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-10-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-10-07 | Plug Back Performed |
1990-10-07 | Well Log Performed |
1990-10-08 | Perforation Treatment Performed - Jet Perforation |
1990-10-09 | Well Began Production |
1990-10-09 | Well Fluid changed to Crude Oil |
1990-10-09 | Well Mode changed to Pumping |
1990-10-10 | Well Fluid changed to Crude Oil |
1990-10-10 | Well Mode changed to Pumping |
1997-03-16 | Perforation Treatment Performed - Jet Perforation |
1997-03-16 | Well Log Performed |
1997-03-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-04-04 | Perforation Treatment Performed - Jet Perforation |
2011-04-04 | Well Log Performed |
2011-04-05 | Perforation Treatment Performed - Jet Perforation |
2012-10-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-10-22 | Plug Back Performed |
2012-10-22 | Well Fluid changed to Crude Oil |
2012-10-22 | Well Mode changed to Abandoned Zone |
2012-12-14 | Well Log Performed |
2012-12-16 | Perforation Treatment Performed - Jet Perforation |
2012-12-16 | Well Log Performed |
2012-12-18 | Perforation Treatment Performed - Cement Plug |
2012-12-18 | Perforation Treatment Performed - Remedial Casing |
2012-12-22 | Well Abandoned |
2012-12-22 | Well Fluid changed to Crude Oil |
2012-12-22 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1961-12-03 | Bullet Perforation | 1545.60 | 1546.90 | 3 |
1961-12-05 | Acid Treatment | 1545.60 | 1546.90 | 0 |
1990-10-07 | Packing Device Capped w/Cement | 1528.00 | 1536.00 | 0 |
1990-10-08 | Perforation | 1278.40 | 1278.70 | 13 |
1997-03-16 | Perforation | 1274.70 | 1278.40 | 13 |
1997-03-18 | Acid Treatment | 1274.70 | 1278.40 | 0 |
2011-04-04 | Perforation | 1273.60 | 1274.50 | 3 |
2011-04-05 | Perforation | 1271.50 | 1273.30 | 3 |
2012-10-22 | Packing Device Capped w/Cement | 1253.50 | 1261.50 | 0 |
2012-12-16 | Perforation | 536.50 | 538.50 | 13 |
2012-12-18 | Remedial Casing Cementing | 536.50 | 538.50 | 0 |
2012-12-18 | Cement Plug | 368.00 | 538.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 1770 | 0.0 | 0.0 | 0.0 |
1991 | 8161 | 0.0 | 0.0 | 0.0 |
1992 | 8624 | 0.0 | 0.0 | 0.0 |
1993 | 8735 | 0.0 | 0.0 | 0.0 |
1994 | 8311 | 0.0 | 0.0 | 0.0 |
1995 | 8315 | 0.0 | 0.0 | 0.0 |
1996 | 8515 | 0.0 | 0.0 | 0.0 |
1997 | 1536 | 0.0 | 0.0 | 0.0 |
1999 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-22 | No Incident Encountered | 0.00 | 0.00 |
2012-12-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]