X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0726100616030

Well Details

Well ID: 0726100616030
Loading map...
Location: 03/16-06-072-10W6/0
Location Alias: 03/16-06-72-10 W6M
Location Alias 2: 03/16-06-072-10 W6/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 6
Range: 10
Section: 06
County/Municipality: County of Grande Prairie No. 1
Well Name: TIDEWATER SINCLAIR 16-6-72-10
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0417547
License Date: 2010-01-19
License Status: Issued
Spud Date: 2010-01-30
Final Drill Date: 2010-02-17
Well Total Depth: 3069.00 m
Surface Hole Latitude: 55.200652
Surface Hole Longitude: -119.511135

For data sources see[1][2]

Well History

Date Event
2010-01-19 Obtained License
2010-01-31 Surface Casing Operation Performed
2010-02-03 Direction Drilling Operation Performed - Horizontal
2010-02-07 Well Log Performed
2010-02-09 Intermediate Casing Operation Performed
2010-02-17 Finished Drilling
2010-02-17 Well Mode changed to Drilled and Cased
2010-02-20 Liner Casing Operation Performed
2010-02-20 Perforation Treatment Performed - Open-Hole Completion
2010-02-21 Rig Released
2010-03-20 Perforation Treatment Performed - Multi-Stage Fracture
2010-03-21 Perforation Treatment Performed - Multi-Stage Fracture
2010-03-28 Well Began Production
2010-03-28 Well Fluid changed to Gas
2010-03-28 Well Mode changed to Flowing
2013-03-25 Well Fluid changed to Gas
2013-03-25 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-03 1392.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-20 Open Hole/Barefoot Completion 1877.00 3069.00 0
2010-02-20 Open Hole/Barefoot Completion 3064.00 3069.00 0
2010-03-20 Multi-Stage Fracture 3024.30 3024.40 0
2010-03-20 Multi-Stage Fracture 2939.40 2939.50 0
2010-03-20 Multi-Stage Fracture 2805.20 2805.30 0
2010-03-20 Multi-Stage Fracture 2670.80 2670.90 0
2010-03-20 Multi-Stage Fracture 2535.80 2535.90 0
2010-03-20 Multi-Stage Fracture 2396.70 2396.80 0
2010-03-21 Multi-Stage Fracture 2256.70 2256.80 0
2010-03-21 Multi-Stage Fracture 2130.00 2130.10 0
2010-03-21 Multi-Stage Fracture 1991.40 1991.50 0
2010-03-21 Multi-Stage Fracture 1901.40 1901.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6376 0.0 0.0 0.0
2011 8465 0.0 0.0 0.0
2012 8724 0.0 0.0 0.0
2013 8663 0.0 0.0 0.0
2014 8367 0.0 0.0 0.0
2015 8124 0.0 0.0 0.0
2016 2636 0.0 0.0 0.0
2017 7980 0.0 0.0 0.0
2018 2595 0.0 0.0 0.0
2019 5864 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-03-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References