If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-29962 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.777132,"lon":-79.578,"icon":""}]} |
Operator Name: KRIEBEL MINERALS INC | |
First Permit Date: 2008-08-07 | |
Last Permit Date: 2008-08-07 | |
Spud Date: 2008-09-16 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.777132 | |
Longitude: -79.578 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 2227.0 | 315.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 1724.0 | 324.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 1670.0 | 294.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 1321.0 | 323.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 1009.0 | 177.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | PRODUCED FLUID | 45.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2009-0 | BRINE | 40.0 | Bbl | BRINE OR INDUSTRIAL WASTE TREATMENT PLT | HART RESOURCE TECH PLT | |||
2012-0 | PRODUCED FLUID | 45.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1722878 | 2008-07-18 | No Violations Noted | Well-site not constructed. Inspection performed as a result of waiver request due to the proximity of the well-site to a pond shown on the most recent topo quad. Spoke with operator rep Mike Cioffi regarding the site. The E&S plan drawing was revised to extend the filter fabric fence backed with hay bales around the northern end of the site between the site and the pond. The E&S plan as comprised should minimize accelerated erosion & sedimentation provided the plan is implemented and maintained properly. | |
1737031 | 2008-09-19 | No Violations Noted | Spudded 9/18/08. Rig drilling @ inspection. Pit/freeboard/E&S controls Ok. | |
1783465 | 2009-04-09 | No Violations Noted | Accompanied Greggory Higgins for training.
Well appears to be in operation at the time of the inspection. Vegetation is starting to take hold in most areas, but not all. There is a minor erosion issue on-site, which is contained by the silt fence. The operator should address the issue by reseeding and mulching the areas that are lacking vegetation. |