X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-29962

Well Details

Well ID: 37-005-29962
Loading map...
Operator Name: KRIEBEL MINERALS INC
First Permit Date: 2008-08-07
Last Permit Date: 2008-08-07
Spud Date: 2008-09-16
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.777132
Longitude: -79.578

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 2227.0 315.0 0.0 0.0 0.0 0.0
2012-0 1724.0 324.0 0.0 0.0 0.0 0.0
2011-0 1670.0 294.0 0.0 0.0 0.0 0.0
2010-0 1321.0 323.0 0.0 0.0 0.0 0.0
2009-0 1009.0 177.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 45.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA
2009-0 BRINE 40.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT HART RESOURCE TECH PLT
2012-0 PRODUCED FLUID 45.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443 HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE CREEKSIDE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1722878 2008-07-18 No Violations Noted Well-site not constructed. Inspection performed as a result of waiver request due to the proximity of the well-site to a pond shown on the most recent topo quad. Spoke with operator rep Mike Cioffi regarding the site. The E&S plan drawing was revised to extend the filter fabric fence backed with hay bales around the northern end of the site between the site and the pond. The E&S plan as comprised should minimize accelerated erosion & sedimentation provided the plan is implemented and maintained properly.
1737031 2008-09-19 No Violations Noted Spudded 9/18/08. Rig drilling @ inspection. Pit/freeboard/E&S controls Ok.
1783465 2009-04-09 No Violations Noted Accompanied Greggory Higgins for training.
Well appears to be in operation at the time of the inspection.  Vegetation is starting to take hold in most areas, but not all.  There is a minor erosion issue on-site, which is contained by the silt fence.  The operator should address the issue by reseeding and mulching the areas that are lacking vegetation.  

References