If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 100.01-30-012-26W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.03538912,"lon":-101.01574781,"icon":""}]} |
Well Name: Elcano Two Creeks DIR | |
Country: Canada | |
Province: Manitoba | |
Township: 012 | |
Meridian: W1 | |
Range: 26 | |
Section: 30 | |
Division: Division No. 6 | |
Subdivision: Wallace-Woodworth | |
Operator Name: Elcano Exploration Inc. | |
License Status: Capable Of Oil Production | |
Spud Date: 2013-03-04 | |
License Date: 2013-02-28 | |
Well Total Depth: 709.00 | |
Latitude: 50.03538912 | |
Longitude: -101.01574781 |
For data sources see[1]
Date | Event |
---|---|
2013-02-28 | Location |
2013-03-03 | Running Casing |
2013-03-08 | Waiting On Service Rig |
2013-03-10 | Completing |
2013-03-16 | Capable Of Oil Production |
For data sources see[2]
Spud Date | Contractor | Rig Number |
---|---|---|
2013-03-04 | Partner Drilling Ltd. | 3 |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2013-03-10 | 582.00 | 584.50 | 17 | N/A | ||
2013-03-10 | 585.00 | 586.00 | 17 | N/A |
For data sources see[4]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2013-03-12 | ACID JOB | N/A | N/A |
For data sources see[5]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Elcano Exploration Inc. | 1,536.20 | 0 | 0.00 |
2015 | Elcano Exploration Inc. | 700.50 | 0 | 0.00 |
2016 | Elcano Exploration Inc. | 294.10 | 0 | 0.00 |
2017 | Elcano Exploration Inc. | 170.60 | 0 | 0.00 |
2018 | Elcano Exploration Inc. | 46.10 | 0 | 0.00 |
2019 | Elcano Exploration Inc. | 7.40 | 0 | 0.00 |
2020 | Elcano Exploration Inc. | 5.20 | 0 | 0.00 |
For data sources see[6]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Elcano Exploration Inc. | 697.50 | 231 | 0.00 | 0 | 0.00 | 0.00 |
2015 | Elcano Exploration Inc. | 599.40 | 280 | 0.00 | 0 | 0.00 | 0.00 |
2016 | Elcano Exploration Inc. | 892.10 | 271 | 0.00 | 0 | 0.00 | 0.00 |
2017 | Elcano Exploration Inc. | 663.60 | 305 | 0.00 | 0 | 0.00 | 0.00 |
2018 | Elcano Exploration Inc. | 780.50 | 362 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Elcano Exploration Inc. | 203.90 | 75 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Elcano Exploration Inc. | 167.70 | 60 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[7]