If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
| (5 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
| − | __TOC__ | + | __TOC__ |
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-111-24580 | | Well ID: 34-111-24580 | ||
| − | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39.78, -80.9 | width=100% | height=100% }} |
|- | |- | ||
| − | | | + | | Country: United States |
|- | |- | ||
| − | | | + | | State: Ohio |
|- | |- | ||
| − | | | + | | County: [[Monroe_County,_Ohio|Monroe]] |
|- | |- | ||
| − | | | + | | Municipality: [[Salem_Township,_Monroe_County,_Ohio|Salem Township]] |
|- | |- | ||
| − | | | + | | Operator Name: [[ECLIPSE RESOURCES I LP]] |
|- | |- | ||
| − | | | + | | Well Pad ID: [[US-OH-001257]] |
|- | |- | ||
| − | | | + | | Farm/Lease Name: DIETRICH C |
|- | |- | ||
| − | | | + | | License Status: Drilling |
|- | |- | ||
| − | | | + | | License Date: 2015-05-08 |
|- | |- | ||
| − | | | + | | Spud Date: 2015-07-06 |
|- | |- | ||
| − | | | + | | Spud Drilling Contractor: |
|- | |- | ||
| − | | | + | | Final Drill Date: |
|- | |- | ||
| − | | | + | | Well Total Depth: 113.00 ft |
|- | |- | ||
| − | | Longitude: -80. | + | | Configuration: Horizontal |
| + | |- | ||
| + | | Latitude: 39.780000 | ||
| + | |- | ||
| + | | Longitude: -80.900000 | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
| + | |publisher = [[Ohio Department of Natural Resources]] | ||
| + | | date = 2020-11-16 | ||
| + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-11-16 }}</ref> | ||
| + | == Well History == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" style="text-align: center"| Well Status | ||
| + | !scope="col" style="width: 15%;text-align: center"| Well Status Date | ||
| + | !scope="col" style="text-align: center"| Comment | ||
| + | |- | ||
| + | | APP | ||
| + | | 2015-05-08 | ||
| + | | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:5/8/2015, Expired Date:5/7/2017 12:00:00 PM, Drilling unit acres:685.788, Proposed Well Type:OG, Proposed Well Class:EDPW | ||
| + | |- | ||
| + | | Correction to Well | ||
| + | | 2015-07-31 | ||
| + | | UPDATE TO UNIT SIZE AND LANDOWNER ROYALTY LIST. | ||
| + | |- | ||
| + | | Record Last Modified | ||
| + | | 2017-02-10 | ||
| + | | | ||
| + | |- | ||
| + | | Construction Permit Expires | ||
| + | | 2017-05-07 | ||
| + | | | ||
| + | |- | ||
| + | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
| + | |publisher = [[Ohio Department of Natural Resources]] | ||
| + | | date = 2020-11-16 | ||
| + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-11-16 }}</ref> | ||
| + | <!--== Perforation Treatments == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" style="text-align: center"| Perforation Date | ||
| + | !scope="col" style="text-align: center"| Interval Top (ft) | ||
| + | !scope="col" style="text-align: center"| Interval Base (ft) | ||
| + | !scope="col" style="text-align: center"| Number of Shots | ||
| + | |- | ||
| + | |}--> | ||
| + | <!--== Fracking Activities == | ||
| + | ==== Fracking Jobs ==== | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" style="text-align: center"| Job Number | ||
| + | !scope="col" style="text-align: center"| Job Start Date | ||
| + | !scope="col" style="text-align: center"| Job End Date | ||
| + | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
| + | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
| + | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
| + | |- | ||
| + | |}--> | ||
| + | <!--==== Fluid Composition Data ==== | ||
| + | {| class="wikitable sortable" style="width: 100%" | ||
| + | !scope="col" style="text-align: center"| Job Number | ||
| + | !scope="col" style="text-align: center"| Trade Name | ||
| + | !scope="col" style="text-align: center"| Supplier | ||
| + | !scope="col" style="text-align: center"| Purpose | ||
| + | !scope="col" style="text-align: center"| Ingredient Name | ||
| + | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
| + | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
| + | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
| + | !scope="col" style="text-align: center"| Mass Used (lb) | ||
| + | |- | ||
| + | |}--> | ||
| + | <!--== Stimulations Data == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" style="text-align: center"| Stimulation Date | ||
| + | !scope="col" style="text-align: center"| Chemical Agent | ||
| + | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) | ||
| + | !scope="col" style="text-align: center"| Fracking Fluid Volume | ||
| + | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) | ||
| + | !scope="col" style="text-align: center"| Fracking Company | ||
| + | !scope="col" style="text-align: center"| Comments | ||
| + | |- | ||
| + | |}--> | ||
| + | <!--== Production Data == | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" style="text-align: center"| Period | ||
| + | !scope="col" style="text-align: center"| Operator Name | ||
| + | !scope="col" style="text-align: center"| Gas Quantity (mcf) | ||
| + | !scope="col" style="text-align: center"| Oil Quantity (bbl) | ||
| + | !scope="col" style="text-align: center"| Production Days | ||
| + | |- | ||
| + | |}--> | ||
| + | <!--== Waste Data == | ||
| + | {| class="wikitable sortable" | ||
| + | !scope="col" style="text-align: center"| Period | ||
| + | !scope="col" style="text-align: center"| Operator Name | ||
| + | !scope="col" style="text-align: center"| Waste Type | ||
| + | !scope="col" style="text-align: center"| Quantity (bbl) | ||
| + | !scope="col" style="text-align: center"| Production Days | ||
| + | |- | ||
| + | |}--> | ||
| + | == Inspection Data == | ||
| + | ==== Inspections Performed ==== | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" style="text-align: center"| Inspection ID | ||
| + | !scope="col" style="text-align: center"| Inspection Date | ||
| + | !scope="col" style="text-align: center"| Inspection Type | ||
| + | !scope="col" style="text-align: center"| Inspection Result | ||
| + | !scope="col" style="text-align: center"| Inspection Comments | ||
| + | |- | ||
| + | | -1717951869 | ||
| + | | 2018-2-27 0:00: | ||
| + | | ND | ||
| + | | No Violations | ||
| + | | 0.20 | ||
| + | |- | ||
| + | | -647036397 | ||
| + | | 2016-4-5 0:00:0 | ||
| + | | PL | ||
| + | | No Violations | ||
| + | | 0.50 | ||
| + | |- | ||
| + | | -965458177 | ||
| + | | 2015-7-8 0:00:0 | ||
| + | | CS | ||
| + | | No Violations | ||
| + | | 3.50 | ||
| + | |- | ||
| + | | 0647036397 | ||
| + | | 2016-04-05 | ||
| + | | Preliminary Restoration | ||
| + | | No Violations | ||
| + | | Preliminary Restoration status check inspection found the area affected by the well site construction meets ORC 1509.072 with erosion control and vegetation established. Addressing the well - to date only the conductor casing has been set. | ||
| + | |- | ||
| + | | 0965458177 | ||
| + | | 2015-07-08 | ||
| + | | Casing String Witnessed | ||
| + | | No Violations | ||
| + | | I am onsite to witness the conductor cementing operations. Precision Rathole drilled 113 of 36 borehole and installed 113 of 30 weld casing. Universal cemented the casing in place with 109 barrels of Type 1 cement with 3% CaCl and .25 pounds per sack of Flowseal. I witnessed 25 barrels of cement circulate to surface. Eighteen inches of cement was left in the cellar to provide a liquid tight seal. | ||
| + | |- | ||
| + | | 1717951869 | ||
| + | | 2018-02-27 | ||
| + | | Not Drilled | ||
| + | | No Violations | ||
| + | | Status check inspection to document the well has been spudded and the conductor set, however the well was not drilled past the conductor and a steel plate is covering the cellar and conductor on the day of my inspection. (2) wells have been drilled and completed on the pad. | ||
|- | |- | ||
|} | |} | ||
| − | == | + | <!--==== Violations Commited ==== |
| − | {{ | + | {| class="wikitable sortable" width="95%" |
| + | !scope="col" style="text-align: center"| Inspection ID | ||
| + | !scope="col" style="text-align: center"| Violation ID | ||
| + | !scope="col" style="text-align: center"| Violation Date | ||
| + | !scope="col" style="text-align: center"| Violation Code | ||
| + | !scope="col" style="text-align: center"| Violation Comments | ||
| + | |- | ||
| + | |}--> | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | ||
| + | |publisher = [[Ohio Department of Natural Resources]] | ||
| + | | date = 2020-11-16 | ||
| + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
| + | | accessdate = 2020-11-16 }}</ref> | ||
| + | ==References== | ||
| + | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
| − | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
| Well ID: 34-111-24580 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.78,"lon":-80.9,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Monroe | |
| Municipality: Salem Township | |
| Operator Name: ECLIPSE RESOURCES I LP | |
| Well Pad ID: US-OH-001257 | |
| Farm/Lease Name: DIETRICH C | |
| License Status: Drilling | |
| License Date: 2015-05-08 | |
| Spud Date: 2015-07-06 | |
| Spud Drilling Contractor: | |
| Final Drill Date: | |
| Well Total Depth: 113.00 ft | |
| Configuration: Horizontal | |
| Latitude: 39.780000 | |
| Longitude: -80.900000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2015-05-08 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:5/8/2015, Expired Date:5/7/2017 12:00:00 PM, Drilling unit acres:685.788, Proposed Well Type:OG, Proposed Well Class:EDPW |
| Correction to Well | 2015-07-31 | UPDATE TO UNIT SIZE AND LANDOWNER ROYALTY LIST. |
| Record Last Modified | 2017-02-10 | |
| Construction Permit Expires | 2017-05-07 |
For data sources see[2]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1717951869 | 2018-2-27 0:00: | ND | No Violations | 0.20 |
| -647036397 | 2016-4-5 0:00:0 | PL | No Violations | 0.50 |
| -965458177 | 2015-7-8 0:00:0 | CS | No Violations | 3.50 |
| 0647036397 | 2016-04-05 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the area affected by the well site construction meets ORC 1509.072 with erosion control and vegetation established. Addressing the well - to date only the conductor casing has been set. |
| 0965458177 | 2015-07-08 | Casing String Witnessed | No Violations | I am onsite to witness the conductor cementing operations. Precision Rathole drilled 113 of 36 borehole and installed 113 of 30 weld casing. Universal cemented the casing in place with 109 barrels of Type 1 cement with 3% CaCl and .25 pounds per sack of Flowseal. I witnessed 25 barrels of cement circulate to surface. Eighteen inches of cement was left in the cellar to provide a liquid tight seal. |
| 1717951869 | 2018-02-27 | Not Drilled | No Violations | Status check inspection to document the well has been spudded and the conductor set, however the well was not drilled past the conductor and a steel plate is covering the cellar and conductor on the day of my inspection. (2) wells have been drilled and completed on the pad. |
For data sources see[3]