== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-153-23169
 
| Well ID: 34-153-23169
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.01866836, -81.56097141 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.01, -81.56 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Summit County, Ohio|Summit]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 +
|-
 +
| County: [[Summit_County,_Ohio|Summit]]
 +
|-
 +
| Municipality: [[Coventry_Township,_Summit_County,_Ohio|Coventry Township]]
 
|-
 
|-
 
| Operator Name: [[CARGILL INC]]
 
| Operator Name: [[CARGILL INC]]
Line 13: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: CITY OF AKRON (SMP #4)
 
|-
 
|-
| First Permit Date:  
+
| License Status: Active Injection
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2013-08-20
 
|-
 
|-
 
| Spud Date: 2014-01-02
 
| Spud Date: 2014-01-02
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[DALLAS MORRIS]]
 +
|-
 +
| Final Drill Date: 2014-01-16
 +
|-
 +
| Well Total Depth: 3107.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Active Injection
+
| Latitude: 41.010000
 +
|-
 +
| Longitude: -81.560000
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| APP
 +
| 2013-08-20
 +
| Proposed Formations:SALINA, Issued Date:8/20/2013, Expired Date:8/20/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
 +
|-
 +
| Reached Total Depth
 +
| 2014-01-16
 +
 
 
|-
 
|-
| Violations: 0
+
| Last Compliance Report
 +
| 2014-01-30
 +
 
 
|-
 
|-
| Latitude: 41.01866836
+
| Completion Report Received
 +
| 2014-05-05
 +
 
 
|-
 
|-
| Longitude: -81.56097141
+
| Construction Permit Expires
 +
| 2014-08-20
 +
 
 +
|-
 +
| Record Last Modified
 +
| 2017-02-10
 +
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<!--== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
|}-->
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
<!--== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
|}-->
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
+
|-
!scope="col" | VIOLATION COMMENT
+
| -1683701724
 +
| 2020-2-24 0:00:
 +
| SM
 +
| No Violations
 +
| 0.30
 
|-
 
|-
| 1391095261
+
| -1722258280
| 2014-01-30
+
| 2016-8-16 0:00:
|
+
| SM
| I was on location to observe the Cement Bond Evaluation and pressure test of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the pressure testing services. Hilco top off the 7 casing with Brine then tied into the casing ( through a 2 port ) to catch any fluid displaced by the logging tools and wireline. Permit Construction Conitions require a preesure test of a minimum of 525 psi held for a 15 minute duration. Hilco pressured up on the casing to 600 psi and isolated the 7 casing from the pump truck. Air was bled out of the system repeatedly and @ 1349Hrs. Hilco pressured up to 600 psi. to start the test. At 1354Hrs. - 600 psi., at 1359 Hrs.- 593 psi., at 1404 Hrs. - 590 psi., test ended at 1408 Hrs. with final pressure reading of 590 psi. A 10 Lbs. pressure drop is within the 5% alowable. Test passed.
+
| No Violations
|  
 
|  
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| -1925391801
 
| -1925391801
| 2014-12-05
+
| 2014-12-5 0:00:
|  
+
| PL
| The preliminary restoration was complete and meets all requirements.
+
| No Violations
|
 
 
|  
 
|  
 +
|-
 +
| -871804836
 +
| 2014-1-30 0:00:
 +
| SM
 +
| No Violations
 
|  
 
|  
 
|-
 
|-
 +
| 0180841599
 +
| 2018-07-09
 +
| Solution Mining Project
 +
| No Violations
 +
| I was on location for a MIT.  I met with Carey Morgan with Cargill.  The net pressure change for the well was 0.016 psi/hr which is well below the minimum required net pressure change of 0.05 psi/hr.  I observed no leaks or spill during the test.
 
|-
 
|-
| -871804836
+
| 0871804836
 
| 2014-01-30
 
| 2014-01-30
|  
+
| Solution Mining Project
 +
| No Violations
 
| I was on location to observe the Cement Bond Evaluation and pressure testing of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the  pressure testing services. Hilco topped off the 7 casing from the top to eliminate any air entrapment and then tied on to a 2 port on the Pack-Off Sub to catch any Brine displaced by the logging tool and wireline. Permit Construction Conditions require a pressure test to a minimum of 525 psi for a 15 minute duration. Hilco pressured up the 7 casing to 600 psi and isolated the 7casing from the pump truck. After allowing the well to stabilize, the air was bled - off in order to conduct the test. Numerous leaks were noticed around the collar. Repair attempts were performed  and the the test moved forward. Hilco pressured up to 600 psi @ 1722 hrs.. Pressure was 590 psi @ 1727 psi. , 583 psi @ 1732 hrs. , 580 psi. @ 1737 hrs.. Total pressure drop was 20 psi through the test. A bad collar contributed to the pressure drop. Since the pressure drop was within the allowable ( 5 % = 30 psi. ) the test is considered successful.
 
| I was on location to observe the Cement Bond Evaluation and pressure testing of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the  pressure testing services. Hilco topped off the 7 casing from the top to eliminate any air entrapment and then tied on to a 2 port on the Pack-Off Sub to catch any Brine displaced by the logging tool and wireline. Permit Construction Conditions require a pressure test to a minimum of 525 psi for a 15 minute duration. Hilco pressured up the 7 casing to 600 psi and isolated the 7casing from the pump truck. After allowing the well to stabilize, the air was bled - off in order to conduct the test. Numerous leaks were noticed around the collar. Repair attempts were performed  and the the test moved forward. Hilco pressured up to 600 psi @ 1722 hrs.. Pressure was 590 psi @ 1727 psi. , 583 psi @ 1732 hrs. , 580 psi. @ 1737 hrs.. Total pressure drop was 20 psi through the test. A bad collar contributed to the pressure drop. Since the pressure drop was within the allowable ( 5 % = 30 psi. ) the test is considered successful.
|  
+
|-
|  
+
| 1391095261
|  
+
| 2014-01-30
 +
| Solution Mining Project
 +
| No Violations
 +
| I was on location to observe the Cement Bond Evaluation and pressure test of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the pressure testing services. Hilco top off the 7 casing with Brine then tied into the casing ( through a 2 port ) to catch any fluid displaced by the logging tools and wireline. Permit Construction Conitions require a preesure test of a minimum of 525 psi held for a 15 minute duration. Hilco pressured up on the casing to 600 psi and isolated the 7 casing from the pump truck. Air was bled out of the system repeatedly and @ 1349Hrs. Hilco pressured up to 600 psi. to start the test. At 1354Hrs. - 600 psi., at 1359 Hrs.- 593 psi., at 1404 Hrs. - 590 psi., test ended at 1408 Hrs. with final pressure reading of 590 psi. A 10 Lbs. pressure drop is within the 5% alowable. Test passed.
 +
|-
 +
| 1722258280
 +
| 2016-08-16
 +
| Solution Mining Project
 +
| No Violations
 +
| There were no violations at the time of inspection.
 +
|-
 +
| 180841599
 +
| 2018-7-9 0:00:0
 +
| SM
 +
| No Violations
 +
| 8.00
 +
|-
 +
| 1925391801
 +
| 2014-12-05
 +
| Preliminary Restoration
 +
| No Violations
 +
| The preliminary restoration was complete and meets all requirements.
 +
|-
 +
| 286030710
 +
| 2019-2-14 0:00:
 +
| SM
 +
| No Violations
 +
| 0.20
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2020-11-16
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Latest revision as of 07:09, 12 January 2021

Well Details

Well ID: 34-153-23169
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Coventry Township
Operator Name: CARGILL INC
Well Pad ID:
Farm/Lease Name: CITY OF AKRON (SMP #4)
License Status: Active Injection
License Date: 2013-08-20
Spud Date: 2014-01-02
Spud Drilling Contractor: DALLAS MORRIS
Final Drill Date: 2014-01-16
Well Total Depth: 3107.00 ft
Configuration: Vertical
Latitude: 41.010000
Longitude: -81.560000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-08-20 Proposed Formations:SALINA, Issued Date:8/20/2013, Expired Date:8/20/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
Reached Total Depth 2014-01-16
Last Compliance Report 2014-01-30
Completion Report Received 2014-05-05
Construction Permit Expires 2014-08-20
Record Last Modified 2017-02-10

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1683701724 2020-2-24 0:00: SM No Violations 0.30
-1722258280 2016-8-16 0:00: SM No Violations
-1925391801 2014-12-5 0:00: PL No Violations
-871804836 2014-1-30 0:00: SM No Violations
0180841599 2018-07-09 Solution Mining Project No Violations I was on location for a MIT. I met with Carey Morgan with Cargill. The net pressure change for the well was 0.016 psi/hr which is well below the minimum required net pressure change of 0.05 psi/hr. I observed no leaks or spill during the test.
0871804836 2014-01-30 Solution Mining Project No Violations I was on location to observe the Cement Bond Evaluation and pressure testing of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the pressure testing services. Hilco topped off the 7 casing from the top to eliminate any air entrapment and then tied on to a 2 port on the Pack-Off Sub to catch any Brine displaced by the logging tool and wireline. Permit Construction Conditions require a pressure test to a minimum of 525 psi for a 15 minute duration. Hilco pressured up the 7 casing to 600 psi and isolated the 7casing from the pump truck. After allowing the well to stabilize, the air was bled - off in order to conduct the test. Numerous leaks were noticed around the collar. Repair attempts were performed and the the test moved forward. Hilco pressured up to 600 psi @ 1722 hrs.. Pressure was 590 psi @ 1727 psi. , 583 psi @ 1732 hrs. , 580 psi. @ 1737 hrs.. Total pressure drop was 20 psi through the test. A bad collar contributed to the pressure drop. Since the pressure drop was within the allowable ( 5 % = 30 psi. ) the test is considered successful.
1391095261 2014-01-30 Solution Mining Project No Violations I was on location to observe the Cement Bond Evaluation and pressure test of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the pressure testing services. Hilco top off the 7 casing with Brine then tied into the casing ( through a 2 port ) to catch any fluid displaced by the logging tools and wireline. Permit Construction Conitions require a preesure test of a minimum of 525 psi held for a 15 minute duration. Hilco pressured up on the casing to 600 psi and isolated the 7 casing from the pump truck. Air was bled out of the system repeatedly and @ 1349Hrs. Hilco pressured up to 600 psi. to start the test. At 1354Hrs. - 600 psi., at 1359 Hrs.- 593 psi., at 1404 Hrs. - 590 psi., test ended at 1408 Hrs. with final pressure reading of 590 psi. A 10 Lbs. pressure drop is within the 5% alowable. Test passed.
1722258280 2016-08-16 Solution Mining Project No Violations There were no violations at the time of inspection.
180841599 2018-7-9 0:00:0 SM No Violations 8.00
1925391801 2014-12-05 Preliminary Restoration No Violations The preliminary restoration was complete and meets all requirements.
286030710 2019-2-14 0:00: SM No Violations 0.20