If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23169 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.01,"lon":-81.56,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Coventry Township | |
Operator Name: CARGILL INC | |
Well Pad ID: | |
Farm/Lease Name: CITY OF AKRON (SMP #4) | |
License Status: Active Injection | |
License Date: 2013-08-20 | |
Spud Date: 2014-01-02 | |
Spud Drilling Contractor: DALLAS MORRIS | |
Final Drill Date: 2014-01-16 | |
Well Total Depth: 3107.00 ft | |
Configuration: Vertical | |
Latitude: 41.010000 | |
Longitude: -81.560000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-08-20 | Proposed Formations:SALINA, Issued Date:8/20/2013, Expired Date:8/20/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP |
Reached Total Depth | 2014-01-16 | |
Last Compliance Report | 2014-01-30 | |
Completion Report Received | 2014-05-05 | |
Construction Permit Expires | 2014-08-20 | |
Record Last Modified | 2017-02-10 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1683701724 | 2020-2-24 0:00: | SM | No Violations | 0.30 |
-1722258280 | 2016-8-16 0:00: | SM | No Violations | |
-1925391801 | 2014-12-5 0:00: | PL | No Violations | |
-871804836 | 2014-1-30 0:00: | SM | No Violations | |
0180841599 | 2018-07-09 | Solution Mining Project | No Violations | I was on location for a MIT. I met with Carey Morgan with Cargill. The net pressure change for the well was 0.016 psi/hr which is well below the minimum required net pressure change of 0.05 psi/hr. I observed no leaks or spill during the test. |
0871804836 | 2014-01-30 | Solution Mining Project | No Violations | I was on location to observe the Cement Bond Evaluation and pressure testing of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the pressure testing services. Hilco topped off the 7 casing from the top to eliminate any air entrapment and then tied on to a 2 port on the Pack-Off Sub to catch any Brine displaced by the logging tool and wireline. Permit Construction Conditions require a pressure test to a minimum of 525 psi for a 15 minute duration. Hilco pressured up the 7 casing to 600 psi and isolated the 7casing from the pump truck. After allowing the well to stabilize, the air was bled - off in order to conduct the test. Numerous leaks were noticed around the collar. Repair attempts were performed and the the test moved forward. Hilco pressured up to 600 psi @ 1722 hrs.. Pressure was 590 psi @ 1727 psi. , 583 psi @ 1732 hrs. , 580 psi. @ 1737 hrs.. Total pressure drop was 20 psi through the test. A bad collar contributed to the pressure drop. Since the pressure drop was within the allowable ( 5 % = 30 psi. ) the test is considered successful. |
1391095261 | 2014-01-30 | Solution Mining Project | No Violations | I was on location to observe the Cement Bond Evaluation and pressure test of the 7 casing. Baker Hughes was providing the logging services and Hilco Treating Services was providing the pressure testing services. Hilco top off the 7 casing with Brine then tied into the casing ( through a 2 port ) to catch any fluid displaced by the logging tools and wireline. Permit Construction Conitions require a preesure test of a minimum of 525 psi held for a 15 minute duration. Hilco pressured up on the casing to 600 psi and isolated the 7 casing from the pump truck. Air was bled out of the system repeatedly and @ 1349Hrs. Hilco pressured up to 600 psi. to start the test. At 1354Hrs. - 600 psi., at 1359 Hrs.- 593 psi., at 1404 Hrs. - 590 psi., test ended at 1408 Hrs. with final pressure reading of 590 psi. A 10 Lbs. pressure drop is within the 5% alowable. Test passed. |
1722258280 | 2016-08-16 | Solution Mining Project | No Violations | There were no violations at the time of inspection. |
180841599 | 2018-7-9 0:00:0 | SM | No Violations | 8.00 |
1925391801 | 2014-12-05 | Preliminary Restoration | No Violations | The preliminary restoration was complete and meets all requirements. |
286030710 | 2019-2-14 0:00: | SM | No Violations | 0.20 |
For data sources see[3]