X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-131-20220"

m
m
Line 188: Line 188:
  
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Wells]]

Revision as of 18:05, 29 June 2014

Well Details

Well ID: 37-131-20220
Loading map...
County: Wyoming
Municipality: Washington Township
Operator Name: CITRUS ENERGY CORP
Well Pad ID: 148025
Farm/Lease Name: MATTOCKS UNIT MATTOCKS 1 1H
First Permit Date: 2011-09-09
Last Permit Date: 2011-09-09
Spud Date: 2011-10-27
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: None
Latitude: 41.576113
Longitude: -75.999761

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2013554 2011-10-25 No Violations Noted Zeigenfuss is on site drilling.Drilling to 160'. Hole dry. Have permit and drillers log.Need to return and check that it is filled out completely.

Still working on site.

2027373 2011-12-09 No Violations Noted Patterson UTI 61 Comp. Man - Dale Barnett

Checked drillers log , at 2265' , 1/4" stream of water at 360' 13 3/8" @ 761' w/ 563 sx Gas Block, 15.7 ppg, w/ 26 bbls to surf. 9 5/8" @ 225' w/ 698 sx Gas Block, 15.7 ppg w/ 25 bbls back to surf. 80' of 20" (10/25/2011) Testing BOP now, didn't check cellar. Keep 2' freeboard.

2038884 2012-02-01 No Violations Noted
2078937 2012-06-26 No Violations Noted
2109867 2012-10-23 No Violations Noted
2126618 2012-12-11 No Violations Noted During the inspection, I observed compromised liner integrity in several areas in the secondary containment liner were the frac tanks were stored at the site. I used an an Extech, ExStik (2) pH, Conductivity, Salinty and TDS meter to field screen areas of ponded water on the secondary containment liner. I recorded a conductivity reading of (2.5) milliSiemens/cm on the secondary containment liner behind the frac tanks and next to the earthen perimeter berm of the site. This location would be in the SE corner of the Well Pad. I recorded a conductivity reading of (1,200) microSiemens/cm in ponded water on the Well Pad in the SW corner of the site. A vacuum truck from Meshoppen Stone was on-site removing water both on and off the secondary containment liner. The driver of the truck informed me his plan was to remove all standing water from the site, due to the recent rainfall event. He placed a hose in the ponded water were I recorded the (1,200) reading and began to remove the water.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 9466.0 5.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 PRODUCED FLUID 11102.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 FLOWBACK FRACTURING SAND 16.5 Tons LANDFILL THR029 TUNNELL HILL RECLAMATION LANDFILL NEWLEXINGTON OH
2011-2 DRILL CUTTINGS 1327.0 Tons LANDFILL 101247 KEYSTONE SANITARY LANDFILL DUNMORE PA
2011-2 DRILL CUTTINGS 788.0 Tons LANDFILL THR029 TUNNELL HILL RECLAMATION LANDFILL NEWLEXINGTON OH

References