X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-155-24093"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-155-24093
 
| Well ID: 34-155-24093
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.38995161, -80.89949474 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.38, -80.89 | width=100% | height=100% }}
 
|-
 
|-
| County:  
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 
|-
 
|-
| Operator Name:  
+
| County: [[Trumbull_County,_Ohio|Trumbull]]
 +
|-
 +
| Municipality: [[Bristol_Township,_Trumbull_County,_Ohio|Bristol Township]]
 +
|-
 +
| Operator Name: [[CEDAR VALLEY ENERGY INC]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: KISH UNIT
 +
|-
 +
| License Status: Producing
 +
|-
 +
| License Date: 2014-11-25
 +
|-
 +
| Spud Date: 2015-01-29
 +
|-
 +
| Spud Drilling Contractor: [[POULSON DRILLING]]
 +
|-
 +
| Final Drill Date: 2015-02-05
 +
|-
 +
| Well Total Depth: 4165.00 ft
 +
|-
 +
| Configuration: Vertical
 +
|-
 +
| Latitude: 41.380000
 +
|-
 +
| Longitude: -80.890000
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| APP
 +
| 2014-11-25
 +
| Proposed Formations:CLINTON SANDSTONE, Issued Date:11/25/2014, Expired Date:11/24/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
 
|-
 
|-
| First Permit Date:
+
| Reached Total Depth
 +
| 2015-02-05
 +
 
 
|-
 
|-
| Last Permit Date:
+
| Correction to Well
 +
| 2015-03-06
 +
| INCREASE TO UNIT SIZE.
 
|-
 
|-
| Spud Date:
+
| Completion Report Received
 +
| 2016-08-17
 +
 
 
|-
 
|-
| Unconventional:
+
| Construction Permit Expires
 +
| 2016-11-24
 +
 
 
|-
 
|-
| Configuration:
+
| Record Last Modified
 +
| 2017-10-23
 +
 
 
|-
 
|-
| Well Status: Well Drilled
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 
|-
 
|-
| Violations: 0
+
| 2016-08-17
 +
| style="text-align: right;" | 3906
 +
| style="text-align: right;" | 3974
 +
| style="text-align: right;" | 25
 
|-
 
|-
| Latitude: 41.38995161
+
|  
 +
| style="text-align: right;" | 3906
 +
| style="text-align: right;" | 3974
 +
| style="text-align: right;" | 25
 
|-
 
|-
| Longitude: -80.89949474
+
|  
 +
| style="text-align: right;" | 3906
 +
| style="text-align: right;" | 3974
 +
| style="text-align: right;" | 25
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
| 2015-06-03
 +
| ACID
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 600 Gal
 +
| style="text-align: right;" | 60000
 +
| [[Producers Service Corporation]]
 +
| On 6/3/2015, I witnessed Producers Service Corp. stimulate the Clinton Sandstone formation for Cedar Valley Energy.  The backside annulus was completely open during the stimulation operations with no failures.
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2015
 +
| [[CEDAR VALLEY ENERGY INC]]
 +
| style="text-align: right;" | 2503.00
 +
| style="text-align: right;" | 387.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2016
 +
| [[CEDAR VALLEY ENERGY INC]]
 +
| style="text-align: right;" | 3658.00
 +
| style="text-align: right;" | 580.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2017
 +
| [[CEDAR VALLEY ENERGY INC]]
 +
| style="text-align: right;" | 1504.00
 +
| style="text-align: right;" | 300.00
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2018
 +
| [[CEDAR VALLEY ENERGY INC]]
 +
| style="text-align: right;" | 993.00
 +
| style="text-align: right;" | 223.00
 +
| style="text-align: right;" | 365
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2015
 +
| [[CEDAR VALLEY ENERGY INC]]
 +
| Brine
 +
| style="text-align: right;" | 1064
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2016
 +
| [[CEDAR VALLEY ENERGY INC]]
 +
| Brine
 +
| style="text-align: right;" | 1294
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2017
 +
| [[CEDAR VALLEY ENERGY INC]]
 +
| Brine
 +
| style="text-align: right;" | 853
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2018
 +
| [[CEDAR VALLEY ENERGY INC]]
 +
| Brine
 +
| style="text-align: right;" | 526
 +
| style="text-align: right;" | 365
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION COMMENT
 
 
|-
 
|-
 
| -118159666
 
| -118159666
 +
| 2015-1-30 0:00:
 +
| DD
 +
| No Violations
 +
| 4.00
 +
|-
 +
| -392314874
 +
| 2015-2-6 0:00:0
 +
| DD
 +
| No Violations
 +
| 0.70
 +
|-
 +
| -78797256
 +
| 2015-9-2 0:00:0
 +
| PL
 +
| No Violations
 +
| 0.50
 +
|-
 +
| 0078797256
 +
| 2015-09-02
 +
| Preliminary Restoration
 +
| No Violations
 +
| I was on location for a preliminary restoration.  During my inspection, I found the well in production.  The well is equipped with a pumpjack.  The tank battery consists of two (2), 100 barrel production tanks, a 50 barrel brine tank, and a mechanical separator.  All of the production equipment meets spacing requirements.  A dike surrounds the tank battery.  Identification signs are posted at the tank battery and pumpjack.  Plugs are installed on the load lines.  The lease road is in great condition with crushed limestone.  The well site has been graded.  Seed has been spread.  Pits have been filled and closed.  Drilling equipment has been removed.  Erosion controls are in place.  Preliminary restoration passed.
 +
|-
 +
| 0118159666
 
| 2015-01-30
 
| 2015-01-30
|  
+
| Drill / Deepen /  Reopen
| I was on location to witness Petroset Cementing Service cement the conductor casing for Cedar Valley.  Poulson drilled a 11
+
| No Violations
|  
+
 
|  
+
|-
|  
+
| 0321955617
 +
| 2015-01-29
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
 
 +
|-
 +
| 0392314874
 +
| 2015-02-06
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| I was on location to pick-up the cement ticket from the cementing of the production casing.  Poulson Drilling reached total depth of 4,165 from rig floor (RF).  The Clinton Sandstone was logged at 4,010 RF.
 +
|-
 +
| 0842753114
 +
| 2015-08-17
 +
| Production Wells
 +
| No Violations
 +
| I was on location for a preliminary restoration.  During my inspection, I found the well in production.  The well is equipped with a pumpjack.  The tank battery consists of two (2), 100 barrel production tanks, a 50 barrel brine tank and a mechanical separator.  A dike surrounds the tank battery.  Identification signs are posted at the tank battery and well.  I observed the spacing between the middle tank and the brine tank is 10.  The lease road is in good condition.  I called and spoke with Tim Cosma, field supervisor for Cedar Valley.  I instructed Mr. Cosma that the brine tank needed to be moved to meet proper spacing requirements.  Mr. Cosma stated Cedar Valley would make the correctionPreliminary restoration not passed.
 +
|-
 +
| 1381788933
 +
| 2015-06-02
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| I was on location to witness Appalachian Well Service perforate the 4.5 inch casing for Cedar Valley.  The top and bottom perforations are at 3,906 and 3,974.  Cedar Valley plans to frac the well tomorrow (6/3/2015).
 
|-
 
|-
 +
| 1527856574
 +
| 2018-06-01
 +
| Production Wells
 +
| No Violations
 +
| During my inspection, the well was equipped with a pumpjack.  The annulus and flow line valves were open.  Production records for this well were current.  The tank battery consists of two 100 BBL production tanks, one 50 BBL steel brine tank, and a mechanical separator.  Valves on the separator were open.  A dike surrounds the tank battery.  Identification signs are posted at the tank battery and well.  Lease access was stable.  No violations observed.
 
|-
 
|-
 
| 1584990987
 
| 1584990987
 
| 2015-02-18
 
| 2015-02-18
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| I was on location for a status check.  During my inspection, I found the pits solidified and closed.  The location was partially graded.
 
| I was on location for a status check.  During my inspection, I found the pits solidified and closed.  The location was partially graded.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1904140473
 +
| 2015-06-03
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| I was on location to witness Producers Service Corp. stimulate the Clinton Sandstone formation for Cedar Valley Energy.  The backside annulus was completely open during the stimulation operations with no failures.  There were no complications during stimulation.
 
|-
 
|-
 
| 321955617
 
| 321955617
| 2015-01-29
+
| 2015-1-29 0:00:
|  
+
| DD
| I was on location to witness Petroset Cementing Service cement the conductor casing for Cedar Valley.  Poulson Drilling was the drilling contractor.  Poulson drilled a 14.75
+
| No Violations
|
+
| 2.00
|
 
|  
 
 
|-
 
|-
 +
| 842753114
 +
| 2015-8-17 0:00:
 +
| PW
 +
| No Violations
 +
| 0.70
 
|-
 
|-
| -392314874
+
|}
| 2015-02-06
+
<!--==== Violations Commited ====
|  
+
{| class="wikitable sortable" width="95%"
| I was on location to pick-up the cement ticket from the cementing of the production casing.  Poulson Drilling reached total depth of 4,165' from rig floor (RF).  The Clinton Sandstone was logged at 4,010' RF.
+
!scope="col" style="text-align: center"| Inspection ID
|  
+
!scope="col" style="text-align: center"| Violation ID
|  
+
!scope="col" style="text-align: center"| Violation Date
|  
+
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 
|-
 
|-
|}
+
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2020-11-16
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Latest revision as of 12:15, 12 January 2021

Well Details

Well ID: 34-155-24093
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Bristol Township
Operator Name: CEDAR VALLEY ENERGY INC
Well Pad ID:
Farm/Lease Name: KISH UNIT
License Status: Producing
License Date: 2014-11-25
Spud Date: 2015-01-29
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2015-02-05
Well Total Depth: 4165.00 ft
Configuration: Vertical
Latitude: 41.380000
Longitude: -80.890000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-11-25 Proposed Formations:CLINTON SANDSTONE, Issued Date:11/25/2014, Expired Date:11/24/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-02-05
Correction to Well 2015-03-06 INCREASE TO UNIT SIZE.
Completion Report Received 2016-08-17
Construction Permit Expires 2016-11-24
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-08-17 3906 3974 25
3906 3974 25
3906 3974 25

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-06-03 ACID 0 600 Gal 60000 Producers Service Corporation On 6/3/2015, I witnessed Producers Service Corp. stimulate the Clinton Sandstone formation for Cedar Valley Energy. The backside annulus was completely open during the stimulation operations with no failures.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 CEDAR VALLEY ENERGY INC 2503.00 387.00 365
2016 CEDAR VALLEY ENERGY INC 3658.00 580.00 365
2017 CEDAR VALLEY ENERGY INC 1504.00 300.00 365
2018 CEDAR VALLEY ENERGY INC 993.00 223.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 CEDAR VALLEY ENERGY INC Brine 1064 365
2016 CEDAR VALLEY ENERGY INC Brine 1294 365
2017 CEDAR VALLEY ENERGY INC Brine 853 365
2018 CEDAR VALLEY ENERGY INC Brine 526 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-118159666 2015-1-30 0:00: DD No Violations 4.00
-392314874 2015-2-6 0:00:0 DD No Violations 0.70
-78797256 2015-9-2 0:00:0 PL No Violations 0.50
0078797256 2015-09-02 Preliminary Restoration No Violations I was on location for a preliminary restoration. During my inspection, I found the well in production. The well is equipped with a pumpjack. The tank battery consists of two (2), 100 barrel production tanks, a 50 barrel brine tank, and a mechanical separator. All of the production equipment meets spacing requirements. A dike surrounds the tank battery. Identification signs are posted at the tank battery and pumpjack. Plugs are installed on the load lines. The lease road is in great condition with crushed limestone. The well site has been graded. Seed has been spread. Pits have been filled and closed. Drilling equipment has been removed. Erosion controls are in place. Preliminary restoration passed.
0118159666 2015-01-30 Drill / Deepen / Reopen No Violations
0321955617 2015-01-29 Drill / Deepen / Reopen No Violations
0392314874 2015-02-06 Drill / Deepen / Reopen No Violations I was on location to pick-up the cement ticket from the cementing of the production casing. Poulson Drilling reached total depth of 4,165 from rig floor (RF). The Clinton Sandstone was logged at 4,010 RF.
0842753114 2015-08-17 Production Wells No Violations I was on location for a preliminary restoration. During my inspection, I found the well in production. The well is equipped with a pumpjack. The tank battery consists of two (2), 100 barrel production tanks, a 50 barrel brine tank and a mechanical separator. A dike surrounds the tank battery. Identification signs are posted at the tank battery and well. I observed the spacing between the middle tank and the brine tank is 10. The lease road is in good condition. I called and spoke with Tim Cosma, field supervisor for Cedar Valley. I instructed Mr. Cosma that the brine tank needed to be moved to meet proper spacing requirements. Mr. Cosma stated Cedar Valley would make the correction. Preliminary restoration not passed.
1381788933 2015-06-02 Drill / Deepen / Reopen No Violations I was on location to witness Appalachian Well Service perforate the 4.5 inch casing for Cedar Valley. The top and bottom perforations are at 3,906 and 3,974. Cedar Valley plans to frac the well tomorrow (6/3/2015).
1527856574 2018-06-01 Production Wells No Violations During my inspection, the well was equipped with a pumpjack. The annulus and flow line valves were open. Production records for this well were current. The tank battery consists of two 100 BBL production tanks, one 50 BBL steel brine tank, and a mechanical separator. Valves on the separator were open. A dike surrounds the tank battery. Identification signs are posted at the tank battery and well. Lease access was stable. No violations observed.
1584990987 2015-02-18 Drill / Deepen / Reopen No Violations I was on location for a status check. During my inspection, I found the pits solidified and closed. The location was partially graded.
1904140473 2015-06-03 Drill / Deepen / Reopen No Violations I was on location to witness Producers Service Corp. stimulate the Clinton Sandstone formation for Cedar Valley Energy. The backside annulus was completely open during the stimulation operations with no failures. There were no complications during stimulation.
321955617 2015-1-29 0:00: DD No Violations 2.00
842753114 2015-8-17 0:00: PW No Violations 0.70

For data sources see[9]

References