If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | __TOC__ | + | __TOC__ |
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-155-24093 | | Well ID: 34-155-24093 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.38, -80.89 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Ohio |
|- | |- | ||
− | | Operator Name: | + | | County: [[Trumbull_County,_Ohio|Trumbull]] |
+ | |- | ||
+ | | Municipality: [[Bristol_Township,_Trumbull_County,_Ohio|Bristol Township]] | ||
+ | |- | ||
+ | | Operator Name: [[CEDAR VALLEY ENERGY INC]] | ||
|- | |- | ||
| Well Pad ID: | | Well Pad ID: | ||
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: KISH UNIT |
+ | |- | ||
+ | | License Status: Producing | ||
+ | |- | ||
+ | | License Date: 2014-11-25 | ||
+ | |- | ||
+ | | Spud Date: 2015-01-29 | ||
+ | |- | ||
+ | | Spud Drilling Contractor: [[POULSON DRILLING]] | ||
+ | |- | ||
+ | | Final Drill Date: 2015-02-05 | ||
+ | |- | ||
+ | | Well Total Depth: 4165.00 ft | ||
+ | |- | ||
+ | | Configuration: Vertical | ||
+ | |- | ||
+ | | Latitude: 41.380000 | ||
+ | |- | ||
+ | | Longitude: -80.890000 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Well Status | ||
+ | !scope="col" style="width: 15%;text-align: center"| Well Status Date | ||
+ | !scope="col" style="text-align: center"| Comment | ||
+ | |- | ||
+ | | APP | ||
+ | | 2014-11-25 | ||
+ | | Proposed Formations:CLINTON SANDSTONE, Issued Date:11/25/2014, Expired Date:11/24/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL | ||
|- | |- | ||
− | | | + | | Reached Total Depth |
+ | | 2015-02-05 | ||
+ | |||
|- | |- | ||
− | | | + | | Correction to Well |
+ | | 2015-03-06 | ||
+ | | INCREASE TO UNIT SIZE. | ||
|- | |- | ||
− | | | + | | Completion Report Received |
+ | | 2016-08-17 | ||
+ | |||
|- | |- | ||
− | | | + | | Construction Permit Expires |
+ | | 2016-11-24 | ||
+ | |||
|- | |- | ||
− | | | + | | Record Last Modified |
+ | | 2017-10-23 | ||
+ | |||
|- | |- | ||
− | | Well | + | |} |
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Perforation Date | ||
+ | !scope="col" style="text-align: center"| Interval Top (ft) | ||
+ | !scope="col" style="text-align: center"| Interval Base (ft) | ||
+ | !scope="col" style="text-align: center"| Number of Shots | ||
|- | |- | ||
− | | | + | | 2016-08-17 |
+ | | style="text-align: right;" | 3906 | ||
+ | | style="text-align: right;" | 3974 | ||
+ | | style="text-align: right;" | 25 | ||
|- | |- | ||
− | | | + | | |
+ | | style="text-align: right;" | 3906 | ||
+ | | style="text-align: right;" | 3974 | ||
+ | | style="text-align: right;" | 25 | ||
|- | |- | ||
− | | | + | | |
+ | | style="text-align: right;" | 3906 | ||
+ | | style="text-align: right;" | 3974 | ||
+ | | style="text-align: right;" | 25 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Perfs Table | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" style="width: 100%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Trade Name | ||
+ | !scope="col" style="text-align: center"| Supplier | ||
+ | !scope="col" style="text-align: center"| Purpose | ||
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | == Stimulations Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Stimulation Date | ||
+ | !scope="col" style="text-align: center"| Chemical Agent | ||
+ | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) | ||
+ | !scope="col" style="text-align: center"| Fracking Fluid Volume | ||
+ | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) | ||
+ | !scope="col" style="text-align: center"| Fracking Company | ||
+ | !scope="col" style="text-align: center"| Comments | ||
+ | |- | ||
+ | | 2015-06-03 | ||
+ | | ACID | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 600 Gal | ||
+ | | style="text-align: right;" | 60000 | ||
+ | | [[Producers Service Corporation]] | ||
+ | | On 6/3/2015, I witnessed Producers Service Corp. stimulate the Clinton Sandstone formation for Cedar Valley Energy. The backside annulus was completely open during the stimulation operations with no failures. | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - tblStimulation Table | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Gas Quantity (mcf) | ||
+ | !scope="col" style="text-align: center"| Oil Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[CEDAR VALLEY ENERGY INC]] | ||
+ | | style="text-align: right;" | 2503.00 | ||
+ | | style="text-align: right;" | 387.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[CEDAR VALLEY ENERGY INC]] | ||
+ | | style="text-align: right;" | 3658.00 | ||
+ | | style="text-align: right;" | 580.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CEDAR VALLEY ENERGY INC]] | ||
+ | | style="text-align: right;" | 1504.00 | ||
+ | | style="text-align: right;" | 300.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CEDAR VALLEY ENERGY INC]] | ||
+ | | style="text-align: right;" | 993.00 | ||
+ | | style="text-align: right;" | 223.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Production Table - Oil and Gas Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | <ref>{{cite web | ||
+ | | title = Combined Production - Oil and Gas Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Waste Type | ||
+ | !scope="col" style="text-align: center"| Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[CEDAR VALLEY ENERGY INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 1064 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[CEDAR VALLEY ENERGY INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 1294 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[CEDAR VALLEY ENERGY INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 853 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[CEDAR VALLEY ENERGY INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 526 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Production Table - Brine Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
+ | <ref>{{cite web | ||
+ | | title = Combined Production - Brine Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2020-11-16 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-11-16 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection ID |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Type |
− | !scope="col" | + | !scope="col" style="text-align: center"| Inspection Result |
− | + | !scope="col" style="text-align: center"| Inspection Comments | |
− | !scope="col" | ||
− | |||
|- | |- | ||
| -118159666 | | -118159666 | ||
+ | | 2015-1-30 0:00: | ||
+ | | DD | ||
+ | | No Violations | ||
+ | | 4.00 | ||
+ | |- | ||
+ | | -392314874 | ||
+ | | 2015-2-6 0:00:0 | ||
+ | | DD | ||
+ | | No Violations | ||
+ | | 0.70 | ||
+ | |- | ||
+ | | -78797256 | ||
+ | | 2015-9-2 0:00:0 | ||
+ | | PL | ||
+ | | No Violations | ||
+ | | 0.50 | ||
+ | |- | ||
+ | | 0078797256 | ||
+ | | 2015-09-02 | ||
+ | | Preliminary Restoration | ||
+ | | No Violations | ||
+ | | I was on location for a preliminary restoration. During my inspection, I found the well in production. The well is equipped with a pumpjack. The tank battery consists of two (2), 100 barrel production tanks, a 50 barrel brine tank, and a mechanical separator. All of the production equipment meets spacing requirements. A dike surrounds the tank battery. Identification signs are posted at the tank battery and pumpjack. Plugs are installed on the load lines. The lease road is in great condition with crushed limestone. The well site has been graded. Seed has been spread. Pits have been filled and closed. Drilling equipment has been removed. Erosion controls are in place. Preliminary restoration passed. | ||
+ | |- | ||
+ | | 0118159666 | ||
| 2015-01-30 | | 2015-01-30 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | I was on location to | + | | No Violations |
− | | | + | |
− | | | + | |- |
− | | | + | | 0321955617 |
+ | | 2015-01-29 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | |||
+ | |- | ||
+ | | 0392314874 | ||
+ | | 2015-02-06 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | I was on location to pick-up the cement ticket from the cementing of the production casing. Poulson Drilling reached total depth of 4,165 from rig floor (RF). The Clinton Sandstone was logged at 4,010 RF. | ||
+ | |- | ||
+ | | 0842753114 | ||
+ | | 2015-08-17 | ||
+ | | Production Wells | ||
+ | | No Violations | ||
+ | | I was on location for a preliminary restoration. During my inspection, I found the well in production. The well is equipped with a pumpjack. The tank battery consists of two (2), 100 barrel production tanks, a 50 barrel brine tank and a mechanical separator. A dike surrounds the tank battery. Identification signs are posted at the tank battery and well. I observed the spacing between the middle tank and the brine tank is 10. The lease road is in good condition. I called and spoke with Tim Cosma, field supervisor for Cedar Valley. I instructed Mr. Cosma that the brine tank needed to be moved to meet proper spacing requirements. Mr. Cosma stated Cedar Valley would make the correction. Preliminary restoration not passed. | ||
+ | |- | ||
+ | | 1381788933 | ||
+ | | 2015-06-02 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | I was on location to witness Appalachian Well Service perforate the 4.5 inch casing for Cedar Valley. The top and bottom perforations are at 3,906 and 3,974. Cedar Valley plans to frac the well tomorrow (6/3/2015). | ||
|- | |- | ||
+ | | 1527856574 | ||
+ | | 2018-06-01 | ||
+ | | Production Wells | ||
+ | | No Violations | ||
+ | | During my inspection, the well was equipped with a pumpjack. The annulus and flow line valves were open. Production records for this well were current. The tank battery consists of two 100 BBL production tanks, one 50 BBL steel brine tank, and a mechanical separator. Valves on the separator were open. A dike surrounds the tank battery. Identification signs are posted at the tank battery and well. Lease access was stable. No violations observed. | ||
|- | |- | ||
| 1584990987 | | 1584990987 | ||
| 2015-02-18 | | 2015-02-18 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| I was on location for a status check. During my inspection, I found the pits solidified and closed. The location was partially graded. | | I was on location for a status check. During my inspection, I found the pits solidified and closed. The location was partially graded. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1904140473 | ||
+ | | 2015-06-03 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | I was on location to witness Producers Service Corp. stimulate the Clinton Sandstone formation for Cedar Valley Energy. The backside annulus was completely open during the stimulation operations with no failures. There were no complications during stimulation. | ||
|- | |- | ||
| 321955617 | | 321955617 | ||
− | | 2015- | + | | 2015-1-29 0:00: |
− | | | + | | DD |
− | | | + | | No Violations |
− | + | | 2.00 | |
− | |||
− | | | ||
|- | |- | ||
+ | | 842753114 | ||
+ | | 2015-8-17 0:00: | ||
+ | | PW | ||
+ | | No Violations | ||
+ | | 0.70 | ||
|- | |- | ||
− | | | + | |} |
− | + | <!--==== Violations Commited ==== | |
− | | | + | {| class="wikitable sortable" width="95%" |
− | | | + | !scope="col" style="text-align: center"| Inspection ID |
− | | | + | !scope="col" style="text-align: center"| Violation ID |
− | | | + | !scope="col" style="text-align: center"| Violation Date |
− | | | + | !scope="col" style="text-align: center"| Violation Code |
+ | !scope="col" style="text-align: center"| Violation Comments | ||
|- | |- | ||
− | |} | + | |}--> |
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables |
− | | publisher = [ | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | date = | + | | date = 2020-11-16 |
− | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
− | == References == | + | ==References== |
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
Well ID: 34-155-24093 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.38,"lon":-80.89,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Bristol Township | |
Operator Name: CEDAR VALLEY ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: KISH UNIT | |
License Status: Producing | |
License Date: 2014-11-25 | |
Spud Date: 2015-01-29 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2015-02-05 | |
Well Total Depth: 4165.00 ft | |
Configuration: Vertical | |
Latitude: 41.380000 | |
Longitude: -80.890000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-11-25 | Proposed Formations:CLINTON SANDSTONE, Issued Date:11/25/2014, Expired Date:11/24/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-02-05 | |
Correction to Well | 2015-03-06 | INCREASE TO UNIT SIZE. |
Completion Report Received | 2016-08-17 | |
Construction Permit Expires | 2016-11-24 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-08-17 | 3906 | 3974 | 25 |
3906 | 3974 | 25 | |
3906 | 3974 | 25 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-06-03 | ACID | 0 | 600 Gal | 60000 | Producers Service Corporation | On 6/3/2015, I witnessed Producers Service Corp. stimulate the Clinton Sandstone formation for Cedar Valley Energy. The backside annulus was completely open during the stimulation operations with no failures. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CEDAR VALLEY ENERGY INC | 2503.00 | 387.00 | 365 |
2016 | CEDAR VALLEY ENERGY INC | 3658.00 | 580.00 | 365 |
2017 | CEDAR VALLEY ENERGY INC | 1504.00 | 300.00 | 365 |
2018 | CEDAR VALLEY ENERGY INC | 993.00 | 223.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CEDAR VALLEY ENERGY INC | Brine | 1064 | 365 |
2016 | CEDAR VALLEY ENERGY INC | Brine | 1294 | 365 |
2017 | CEDAR VALLEY ENERGY INC | Brine | 853 | 365 |
2018 | CEDAR VALLEY ENERGY INC | Brine | 526 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-118159666 | 2015-1-30 0:00: | DD | No Violations | 4.00 |
-392314874 | 2015-2-6 0:00:0 | DD | No Violations | 0.70 |
-78797256 | 2015-9-2 0:00:0 | PL | No Violations | 0.50 |
0078797256 | 2015-09-02 | Preliminary Restoration | No Violations | I was on location for a preliminary restoration. During my inspection, I found the well in production. The well is equipped with a pumpjack. The tank battery consists of two (2), 100 barrel production tanks, a 50 barrel brine tank, and a mechanical separator. All of the production equipment meets spacing requirements. A dike surrounds the tank battery. Identification signs are posted at the tank battery and pumpjack. Plugs are installed on the load lines. The lease road is in great condition with crushed limestone. The well site has been graded. Seed has been spread. Pits have been filled and closed. Drilling equipment has been removed. Erosion controls are in place. Preliminary restoration passed. |
0118159666 | 2015-01-30 | Drill / Deepen / Reopen | No Violations | |
0321955617 | 2015-01-29 | Drill / Deepen / Reopen | No Violations | |
0392314874 | 2015-02-06 | Drill / Deepen / Reopen | No Violations | I was on location to pick-up the cement ticket from the cementing of the production casing. Poulson Drilling reached total depth of 4,165 from rig floor (RF). The Clinton Sandstone was logged at 4,010 RF. |
0842753114 | 2015-08-17 | Production Wells | No Violations | I was on location for a preliminary restoration. During my inspection, I found the well in production. The well is equipped with a pumpjack. The tank battery consists of two (2), 100 barrel production tanks, a 50 barrel brine tank and a mechanical separator. A dike surrounds the tank battery. Identification signs are posted at the tank battery and well. I observed the spacing between the middle tank and the brine tank is 10. The lease road is in good condition. I called and spoke with Tim Cosma, field supervisor for Cedar Valley. I instructed Mr. Cosma that the brine tank needed to be moved to meet proper spacing requirements. Mr. Cosma stated Cedar Valley would make the correction. Preliminary restoration not passed. |
1381788933 | 2015-06-02 | Drill / Deepen / Reopen | No Violations | I was on location to witness Appalachian Well Service perforate the 4.5 inch casing for Cedar Valley. The top and bottom perforations are at 3,906 and 3,974. Cedar Valley plans to frac the well tomorrow (6/3/2015). |
1527856574 | 2018-06-01 | Production Wells | No Violations | During my inspection, the well was equipped with a pumpjack. The annulus and flow line valves were open. Production records for this well were current. The tank battery consists of two 100 BBL production tanks, one 50 BBL steel brine tank, and a mechanical separator. Valves on the separator were open. A dike surrounds the tank battery. Identification signs are posted at the tank battery and well. Lease access was stable. No violations observed. |
1584990987 | 2015-02-18 | Drill / Deepen / Reopen | No Violations | I was on location for a status check. During my inspection, I found the pits solidified and closed. The location was partially graded. |
1904140473 | 2015-06-03 | Drill / Deepen / Reopen | No Violations | I was on location to witness Producers Service Corp. stimulate the Clinton Sandstone formation for Cedar Valley Energy. The backside annulus was completely open during the stimulation operations with no failures. There were no complications during stimulation. |
321955617 | 2015-1-29 0:00: | DD | No Violations | 2.00 |
842753114 | 2015-8-17 0:00: | PW | No Violations | 0.70 |
For data sources see[9]