If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-24093 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.38,"lon":-80.89,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Bristol Township | |
Operator Name: CEDAR VALLEY ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: KISH UNIT | |
License Status: Producing | |
License Date: 2014-11-25 | |
Spud Date: 2015-01-29 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2015-02-05 | |
Well Total Depth: 4165.00 ft | |
Configuration: Vertical | |
Latitude: 41.380000 | |
Longitude: -80.890000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-11-25 | Proposed Formations:CLINTON SANDSTONE, Issued Date:11/25/2014, Expired Date:11/24/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-02-05 | |
Correction to Well | 2015-03-06 | INCREASE TO UNIT SIZE. |
Completion Report Received | 2016-08-17 | |
Construction Permit Expires | 2016-11-24 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-08-17 | 3906 | 3974 | 25 |
3906 | 3974 | 25 | |
3906 | 3974 | 25 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-06-03 | ACID | 0 | 600 Gal | 60000 | Producers Service Corporation | On 6/3/2015, I witnessed Producers Service Corp. stimulate the Clinton Sandstone formation for Cedar Valley Energy. The backside annulus was completely open during the stimulation operations with no failures. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CEDAR VALLEY ENERGY INC | 2503.00 | 387.00 | 365 |
2016 | CEDAR VALLEY ENERGY INC | 3658.00 | 580.00 | 365 |
2017 | CEDAR VALLEY ENERGY INC | 1504.00 | 300.00 | 365 |
2018 | CEDAR VALLEY ENERGY INC | 993.00 | 223.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CEDAR VALLEY ENERGY INC | Brine | 1064 | 365 |
2016 | CEDAR VALLEY ENERGY INC | Brine | 1294 | 365 |
2017 | CEDAR VALLEY ENERGY INC | Brine | 853 | 365 |
2018 | CEDAR VALLEY ENERGY INC | Brine | 526 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-118159666 | 2015-1-30 0:00: | DD | No Violations | 4.00 |
-392314874 | 2015-2-6 0:00:0 | DD | No Violations | 0.70 |
-78797256 | 2015-9-2 0:00:0 | PL | No Violations | 0.50 |
0078797256 | 2015-09-02 | Preliminary Restoration | No Violations | I was on location for a preliminary restoration. During my inspection, I found the well in production. The well is equipped with a pumpjack. The tank battery consists of two (2), 100 barrel production tanks, a 50 barrel brine tank, and a mechanical separator. All of the production equipment meets spacing requirements. A dike surrounds the tank battery. Identification signs are posted at the tank battery and pumpjack. Plugs are installed on the load lines. The lease road is in great condition with crushed limestone. The well site has been graded. Seed has been spread. Pits have been filled and closed. Drilling equipment has been removed. Erosion controls are in place. Preliminary restoration passed. |
0118159666 | 2015-01-30 | Drill / Deepen / Reopen | No Violations | |
0321955617 | 2015-01-29 | Drill / Deepen / Reopen | No Violations | |
0392314874 | 2015-02-06 | Drill / Deepen / Reopen | No Violations | I was on location to pick-up the cement ticket from the cementing of the production casing. Poulson Drilling reached total depth of 4,165 from rig floor (RF). The Clinton Sandstone was logged at 4,010 RF. |
0842753114 | 2015-08-17 | Production Wells | No Violations | I was on location for a preliminary restoration. During my inspection, I found the well in production. The well is equipped with a pumpjack. The tank battery consists of two (2), 100 barrel production tanks, a 50 barrel brine tank and a mechanical separator. A dike surrounds the tank battery. Identification signs are posted at the tank battery and well. I observed the spacing between the middle tank and the brine tank is 10. The lease road is in good condition. I called and spoke with Tim Cosma, field supervisor for Cedar Valley. I instructed Mr. Cosma that the brine tank needed to be moved to meet proper spacing requirements. Mr. Cosma stated Cedar Valley would make the correction. Preliminary restoration not passed. |
1381788933 | 2015-06-02 | Drill / Deepen / Reopen | No Violations | I was on location to witness Appalachian Well Service perforate the 4.5 inch casing for Cedar Valley. The top and bottom perforations are at 3,906 and 3,974. Cedar Valley plans to frac the well tomorrow (6/3/2015). |
1527856574 | 2018-06-01 | Production Wells | No Violations | During my inspection, the well was equipped with a pumpjack. The annulus and flow line valves were open. Production records for this well were current. The tank battery consists of two 100 BBL production tanks, one 50 BBL steel brine tank, and a mechanical separator. Valves on the separator were open. A dike surrounds the tank battery. Identification signs are posted at the tank battery and well. Lease access was stable. No violations observed. |
1584990987 | 2015-02-18 | Drill / Deepen / Reopen | No Violations | I was on location for a status check. During my inspection, I found the pits solidified and closed. The location was partially graded. |
1904140473 | 2015-06-03 | Drill / Deepen / Reopen | No Violations | I was on location to witness Producers Service Corp. stimulate the Clinton Sandstone formation for Cedar Valley Energy. The backside annulus was completely open during the stimulation operations with no failures. There were no complications during stimulation. |
321955617 | 2015-1-29 0:00: | DD | No Violations | 2.00 |
842753114 | 2015-8-17 0:00: | PW | No Violations | 0.70 |
For data sources see[9]