If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-157-25495 | | Well ID: 34-157-25495 | ||
− | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.54, -81.3 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 13: | Line 13: | ||
| Municipality: [[Warren_Township,_Tuscarawas_County,_Ohio|Warren Township]] | | Municipality: [[Warren_Township,_Tuscarawas_County,_Ohio|Warren Township]] | ||
|- | |- | ||
− | | Operator Name: [[ | + | | Operator Name: [[EAP OHIO LLC]] |
|- | |- | ||
| Well Pad ID: [[US-OH-000436]] | | Well Pad ID: [[US-OH-000436]] | ||
Line 29: | Line 29: | ||
| Final Drill Date: 2014-12-23 | | Final Drill Date: 2014-12-23 | ||
|- | |- | ||
− | | Well Total Depth: 14649 ft | + | | Well Total Depth: 14649.00 ft |
|- | |- | ||
| Configuration: Horizontal | | Configuration: Horizontal | ||
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.540000 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.300000 |
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Well History == | == Well History == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 89: | Line 89: | ||
| title = Risk Based Data Management System - Well and WellHistry Tables | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
<!--== Perforation Treatments == | <!--== Perforation Treatments == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 161: | Line 161: | ||
!scope="col" style="text-align: center"| Inspection Result | !scope="col" style="text-align: center"| Inspection Result | ||
!scope="col" style="text-align: center"| Inspection Comments | !scope="col" style="text-align: center"| Inspection Comments | ||
+ | |- | ||
+ | | -1572850713 | ||
+ | | 2012-5-3 0:00:0 | ||
+ | | SC | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | -1694496431 | ||
+ | | 2012-4-27 0:00: | ||
+ | | SC | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | -1853645383 | ||
+ | | 2019-5-30 0:00: | ||
+ | | TI | ||
+ | | No Violations | ||
+ | | 0.70 | ||
+ | |- | ||
+ | | -604284260 | ||
+ | | 2016-2-22 0:00: | ||
+ | | DD | ||
+ | | No Violations | ||
+ | | 1.00 | ||
+ | |- | ||
+ | | -962565826 | ||
+ | | 2012-5-1 0:00:0 | ||
+ | | SC | ||
+ | | No Violations | ||
+ | | | ||
|- | |- | ||
| 0604284260 | | 0604284260 | ||
Line 197: | Line 227: | ||
| No Violations | | No Violations | ||
| on the day of my inspection I found that the crew has drilled to the depth of 800 feet. The wire line crew is logging this section, and the are preparing to run 13 3/8 casing and cement to surface. Upon returning to location the crew was installing 13 3/8 inch casing. Schlumberger will be doing the cementing. Established circulation and circulated 34 bbls of good cement to surface | | on the day of my inspection I found that the crew has drilled to the depth of 800 feet. The wire line crew is logging this section, and the are preparing to run 13 3/8 casing and cement to surface. Upon returning to location the crew was installing 13 3/8 inch casing. Schlumberger will be doing the cementing. Established circulation and circulated 34 bbls of good cement to surface | ||
+ | |- | ||
+ | | 1444519826 | ||
+ | | 2020-5-22 0:00: | ||
+ | | TI | ||
+ | | No Violations | ||
+ | | 1.00 | ||
|- | |- | ||
| 1543331214 | | 1543331214 | ||
Line 209: | Line 245: | ||
| No Violations | | No Violations | ||
| I was called out to location by Ashley. Crew thought they dug into an old drill pit while building a new location. I talked with landowner, Glen Mizer, and he advised what crew hit was an old dump site from the 1950s and not a drill pit. | | I was called out to location by Ashley. Crew thought they dug into an old drill pit while building a new location. I talked with landowner, Glen Mizer, and he advised what crew hit was an old dump site from the 1950s and not a drill pit. | ||
+ | |- | ||
+ | | 1575560466 | ||
+ | | 2019-12-4 0:00: | ||
+ | | TI | ||
+ | | No Violations | ||
+ | | 0.50 | ||
+ | |- | ||
+ | | 1588780989 | ||
+ | | 2020-5-6 0:00:0 | ||
+ | | TI | ||
+ | | No Violations | ||
+ | | 0.50 | ||
|- | |- | ||
| 1694496431 | | 1694496431 | ||
Line 235: | Line 283: | ||
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Ohio Wells]] | [[Category:Ohio Wells]] |
Well ID: 34-157-25495 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.54,"lon":-81.3,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Warren Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000436 | |
Farm/Lease Name: MIZER 29-15-7 | |
License Status: Temporary Inactive Status 1st Year | |
License Date: 2014-11-10 | |
Spud Date: 2014-11-19 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2014-12-23 | |
Well Total Depth: 14649.00 ft | |
Configuration: Horizontal | |
Latitude: 40.540000 | |
Longitude: -81.300000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-03-08 | Proposed Formations:TRENTON - BLACK RIVER, Issued Date:3/8/2012, Expired Date:3/8/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
Correction to Well | 2012-03-16 | CORRECTION TO Y COORDINATE. |
APP | 2012-06-14 | Proposed Formations:POINT PLEASANT, Issued Date:6/14/2012, Expired Date:6/14/2014 12:00:00 PM, Drilling unit acres:161.2, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2012-06-15 | CORRECTION TO APP TYPE, PERMIT NUMBER & CASING PROGRAM. CANCELLED STRATIGRAPHIC TEST PER OWNER REQUEST. |
APP | 2014-11-10 | Proposed Formations:POINT PLEASANT, Issued Date:11/10/2014, Expired Date:11/9/2016 12:00:00 PM, Drilling unit acres:189.48, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2014-12-23 | |
Correction to Well | 2015-04-03 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Construction Permit Expires | 2016-11-09 | |
Record Last Modified | 2019-05-15 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1572850713 | 2012-5-3 0:00:0 | SC | No Violations | |
-1694496431 | 2012-4-27 0:00: | SC | No Violations | |
-1853645383 | 2019-5-30 0:00: | TI | No Violations | 0.70 |
-604284260 | 2016-2-22 0:00: | DD | No Violations | 1.00 |
-962565826 | 2012-5-1 0:00:0 | SC | No Violations | |
0604284260 | 2016-02-22 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found, a sign board at the access road entry featuring the well names, permit number and emergency contact information. The access road has a padlocked gate near entrance. The access road is in good repair. I found the production pad to be enclosed entirely with a chain link fence with barbed wire at the top, and with a padlocked gate. The pad has a crushed limestone surface, and is in good repair. The well is constructed with a wellhead tree of 4 inch valves. There are pipe gates protecting the well from vehicles. The cellar is full of water, and has grating covering is to prevent someone from falling in. There is no production equipment on location. I am not able to determine if the well has been frac. |
0962565826 | 2012-05-01 | Surface Facility Construction | No Violations | I arrived on location and found crew putting up temporary silt socks around site and removing/ stockpiling topsoil. |
1336070288 | 2012-04-04 | Surface Facility Construction | No Violations | I arrived on permit # 5495 to do a pre-construction permit condition inspection for a horizontal well that is going to be drilled by Chesapeake. Sent report to Steve Opritza on 04/05/12. |
1411573981 | 2014-09-24 | Not Drilled | No Violations | On the date of inspection I located the Chesapeake Mizer well pad. No wells have been drilled yet and the pad has vegetation covering 50% of it. Chesapeake plans to move a top hole rig in the within a month, however, the permit for this well expired in April, 2014. |
1416507996 | 2014-11-20 | Casing String Witnessed | No Violations | On the day of my inspection I found Rocky Mountain Drill setting 20 inch conductor pipe at 120 feet in a 26 inch hole. Universal will be cementing. Established circulation and circulated 15 bbls of good cement to surface. |
1418061681 | 2014-12-08 | Casing String Witnessed | No Violations | on the day of my inspection I found that the crew has drilled to the depth of 800 feet. The wire line crew is logging this section, and the are preparing to run 13 3/8 casing and cement to surface. Upon returning to location the crew was installing 13 3/8 inch casing. Schlumberger will be doing the cementing. Established circulation and circulated 34 bbls of good cement to surface |
1444519826 | 2020-5-22 0:00: | TI | No Violations | 1.00 |
1543331214 | 2018-11-27 | Temporary Inactive Well Status | No Violations | Upon my arrival on location, I witnessed the access road had been maintained. The location had not been disturbed. The well was in the idle position and no production equipment was on the location. No environmental issue was visible at the time of the inspection. The location was surrounded by a chain link fence with a locked gate. The earthen dike area inside and outside of the fence, had vegetation growing on it. The monitoring gauges had been installed, but the valves were closed and locked. Therefore, the pressure gauges were reading zero. I will contact Chesapeake to unlock the monitoring valves. So, we can monitor the annular pressures. Chesapeake has applied for a Temporary Inactive Permit. The permit is presently being reviewed. |
1572850713 | 2012-05-03 | Surface Facility Construction | No Violations | I was called out to location by Ashley. Crew thought they dug into an old drill pit while building a new location. I talked with landowner, Glen Mizer, and he advised what crew hit was an old dump site from the 1950s and not a drill pit. |
1575560466 | 2019-12-4 0:00: | TI | No Violations | 0.50 |
1588780989 | 2020-5-6 0:00:0 | TI | No Violations | 0.50 |
1694496431 | 2012-04-27 | Surface Facility Construction | No Violations | I arrived on location and found company building location and drill pad which is approximately 365 X 500. No earthen pit will be used on this site for drilling. |
1853645383 | 2019-05-30 | Temporary Inactive Well Status | No Violations | This inspection is for a Temporary Inactive Well Status. Upon my arrival on location, accompanied by Southeast Supervisor Brent Bear and Gus Jerome from Encino, I witnessed the access road had been maintained. The location had not been disturbed and the sump valves were in the open position. The well was shut in and no production equipment was on the location. The monitoring gauges had been installed and the pressure gauges were showing no pressure on the annulus. No environmental issue was visible at the time of the inspection. The well cellar was full of water and we advised Encino to have the cellar pumped out. The location was surrounded by a chain link fence with locked gates. The earthen dike area inside and outside of the fence, had vegetation growing on it. We witnessed Gus Jerome completing the Inactive Status check list and signing it. |
For data sources see[3]