X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-013-20944"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-013-20944
 
| Well ID: 34-013-20944
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.86088317, -80.87985958 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.86, -80.88 | width=100% | height=100% }}
 
|-
 
|-
| County:  
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 
|-
 
|-
| Operator Name:  
+
| County: [[Belmont_County,_Ohio|Belmont]]
 
|-
 
|-
| Well Pad ID:  
+
| Municipality: [[York_Township,_Belmont_County,_Ohio|York Township]]
 
|-
 
|-
| Farm/Lease Name:  
+
| Operator Name: [[RICE DRILLING D LLC]]
 
|-
 
|-
| First Permit Date:  
+
| Well Pad ID: [[US-OH-001271]]
 
|-
 
|-
| Last Permit Date:  
+
| Farm/Lease Name: BIG DAWG
 
|-
 
|-
| Spud Date:  
+
| License Status: Final Restoration
 
|-
 
|-
| Unconventional:  
+
| License Date: 2015-05-08
 
|-
 
|-
| Configuration:  
+
| Spud Date: 2015-08-24
 
|-
 
|-
| Well Status:  
+
| Spud Drilling Contractor: [[FALCON DRLG]]
 
|-
 
|-
| Violations: 0
+
| Final Drill Date: 2015-09-03
 
|-
 
|-
| Latitude: 39.86088317
+
| Well Total Depth: 939.00 ft
 
|-
 
|-
| Longitude: -80.87985958
+
| Configuration: Vertical
 +
|-
 +
| Latitude: 39.860000
 +
|-
 +
| Longitude: -80.880000
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| APP
 +
| 2015-05-08
 +
| Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:5/8/2015, Expired Date:5/7/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
 +
|-
 +
| Reached Total Depth
 +
| 2015-09-03
 +
| LOST HOLE WHILE DRILLING OUT FROM 1ST INTERMEDIATE
 +
|-
 +
| Completion Report Received
 +
| 2015-09-15
 +
| LOST HOLE WHILE DRILLING OUT FROM 1ST INTERMEDIATE
 +
|-
 +
| Plugged/Abandoned
 +
| 2015-09-15
 +
| LOST HOLE WHILE DRILLING OUT FROM 1ST INTERMEDIATE
 +
|-
 +
| Construction Permit Expires
 +
| 2017-05-07
 +
| LOST HOLE WHILE DRILLING OUT FROM 1ST INTERMEDIATE
 +
|-
 +
| Record Last Modified
 +
| 2017-06-20
 +
| LOST HOLE WHILE DRILLING OUT FROM 1ST INTERMEDIATE
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
<!--== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
|}-->
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
<!--== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
|}-->
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Inspection Date
 +
!scope="col" style="text-align: center"| Inspection Type
 +
!scope="col" style="text-align: center"| Inspection Result
 +
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| -1463751416
 +
| 2015-9-5 0:00:0
 +
| DD
 +
| No Violations
 +
| 1.00
 +
|-
 +
| -1479862901
 +
| 2015-8-31 0:00:
 +
| CS
 +
| No Violations
 +
| 5.00
 +
|-
 +
| -409473161
 +
| 2017-6-14 0:00:
 +
| FR
 +
| No Violations
 +
| 0.50
 +
|-
 +
| -540169360
 +
| 2015-9-1 0:00:0
 +
| DD
 +
| No Violations
 +
| 0.50
 +
|-
 +
| -886193487
 +
| 2015-9-3 0:00:0
 +
| CS
 +
| No Violations
 +
| 7.00
 +
|-
 +
| 0409473161
 +
| 2017-06-14
 +
| Final Restoration
 +
| No Violations
 +
| The final restoration for this well is complete as the well has been plugged. The restoration for the well site pad disturbance area is required to be remediated once all other wells on this pad are plugged. Final restoration passed.
 +
|-
 +
| 0417258089
 +
| 2015-09-15
 +
| Plug / Plug Back
 +
| No Violations
 +
| On this day Halliburton Cement Company was on site to plug this lost hole well. The well was plugged from 745 to surface. Halliburton pumped 227 barrels of Class A neat cement and cement to surface was established. See plug report for details.
 +
|-
 +
| 0540169360
 +
| 2015-09-01
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
 
 +
|-
 +
| 0886193487
 +
| 2015-09-03
 +
| Casing String Witnessed
 +
| No Violations
 +
| On this day Falcon Rig 23 had reached a total depth of 738. The 18.625 casing string was ran to a depth of 718 and Halliburton Cementing was on location to cement the casing with 350 sack of Class H cement. Cement to surface was established. See cement ticket for details.
 +
|-
 +
| 1340970244
 +
| 2015-08-25
 +
| Casing String Witnessed
 +
| No Violations
 +
| On this day Express Energy had reached a total depth of 100. The 30 conductor was ran into a 36 open hole and Express Energy was on site to cement the casing with 275 sacks of Class A cement. Cement to surface established. See cement ticket for details.
 +
|-
 +
| 1443446213
 +
| 2015-09-27
 +
| Production Wells
 +
| No Violations
 +
 
 +
|-
 +
| 1463751416
 +
| 2015-09-05
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
 
 +
|-
 +
| 1479862901
 +
| 2015-08-31
 +
| Casing String Witnessed
 +
| No Violations
 +
| On this day Falcon Rig 23 had reached a total depth of 350. The 24 welded casing was ran to a depth of 330 and Halliburton Cementing was on site and cemented the casing with 270 sacks of Class A cement. Cement to surface established. See cement ticket for details.
 +
|-
 +
| 417258089
 +
| 2015-9-15 0:00:
 +
| PB
 +
| No Violations
 +
| 5.00
 
|-
 
|-
 
|}
 
|}
== References ==
+
<!--==== Violations Commited ====
{{reflist}}
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2020-11-16
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-11-16 }}</ref>
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Latest revision as of 20:06, 12 January 2021

Well Details

Well ID: 34-013-20944
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: York Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001271
Farm/Lease Name: BIG DAWG
License Status: Final Restoration
License Date: 2015-05-08
Spud Date: 2015-08-24
Spud Drilling Contractor: FALCON DRLG
Final Drill Date: 2015-09-03
Well Total Depth: 939.00 ft
Configuration: Vertical
Latitude: 39.860000
Longitude: -80.880000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-05-08 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:5/8/2015, Expired Date:5/7/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Reached Total Depth 2015-09-03 LOST HOLE WHILE DRILLING OUT FROM 1ST INTERMEDIATE
Completion Report Received 2015-09-15 LOST HOLE WHILE DRILLING OUT FROM 1ST INTERMEDIATE
Plugged/Abandoned 2015-09-15 LOST HOLE WHILE DRILLING OUT FROM 1ST INTERMEDIATE
Construction Permit Expires 2017-05-07 LOST HOLE WHILE DRILLING OUT FROM 1ST INTERMEDIATE
Record Last Modified 2017-06-20 LOST HOLE WHILE DRILLING OUT FROM 1ST INTERMEDIATE

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1463751416 2015-9-5 0:00:0 DD No Violations 1.00
-1479862901 2015-8-31 0:00: CS No Violations 5.00
-409473161 2017-6-14 0:00: FR No Violations 0.50
-540169360 2015-9-1 0:00:0 DD No Violations 0.50
-886193487 2015-9-3 0:00:0 CS No Violations 7.00
0409473161 2017-06-14 Final Restoration No Violations The final restoration for this well is complete as the well has been plugged. The restoration for the well site pad disturbance area is required to be remediated once all other wells on this pad are plugged. Final restoration passed.
0417258089 2015-09-15 Plug / Plug Back No Violations On this day Halliburton Cement Company was on site to plug this lost hole well. The well was plugged from 745 to surface. Halliburton pumped 227 barrels of Class A neat cement and cement to surface was established. See plug report for details.
0540169360 2015-09-01 Drill / Deepen / Reopen No Violations
0886193487 2015-09-03 Casing String Witnessed No Violations On this day Falcon Rig 23 had reached a total depth of 738. The 18.625 casing string was ran to a depth of 718 and Halliburton Cementing was on location to cement the casing with 350 sack of Class H cement. Cement to surface was established. See cement ticket for details.
1340970244 2015-08-25 Casing String Witnessed No Violations On this day Express Energy had reached a total depth of 100. The 30 conductor was ran into a 36 open hole and Express Energy was on site to cement the casing with 275 sacks of Class A cement. Cement to surface established. See cement ticket for details.
1443446213 2015-09-27 Production Wells No Violations
1463751416 2015-09-05 Drill / Deepen / Reopen No Violations
1479862901 2015-08-31 Casing String Witnessed No Violations On this day Falcon Rig 23 had reached a total depth of 350. The 24 welded casing was ran to a depth of 330 and Halliburton Cementing was on site and cemented the casing with 270 sacks of Class A cement. Cement to surface established. See cement ticket for details.
417258089 2015-9-15 0:00: PB No Violations 5.00

For data sources see[3]

References