If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0024212405000 | | Well ID: 0024212405000 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 49.121772, -112.697039 | width=100% | height=100% }} |
+ | |- | ||
+ | | Location: 00/05-24-002-21W4/0 | ||
+ | |- | ||
+ | | Location Alias: 00/05-24-02-21 W4M | ||
+ | |- | ||
+ | | Location Alias 2: 00/05-24-002-21 W4/00 | ||
+ | |- | ||
+ | | Country: Canada | ||
+ | |- | ||
+ | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 002 | ||
+ | |- | ||
+ | | Meridian: 4 | ||
+ | |- | ||
+ | | Range: 21 | ||
+ | |- | ||
+ | | Section: 24 | ||
+ | |- | ||
+ | | County/Municipality: [[Cardston County,_Alberta|Cardston County]] | ||
|- | |- | ||
| Well Name: CPEC REAGAN 5-24-2-21 | | Well Name: CPEC REAGAN 5-24-2-21 | ||
|- | |- | ||
− | | Operator: | + | | Operator Name: [[Crescent Point Energy Corp.]] |
+ | |- | ||
+ | | License Number: 0444592 | ||
|- | |- | ||
| License Date: 2012-03-01 | | License Date: 2012-03-01 | ||
|- | |- | ||
− | | Final Drilling Date: 2012-04- | + | | License Status: Amended |
+ | |- | ||
+ | | Spud Date: 2012-03-13 | ||
+ | |- | ||
+ | | Final Drill Date: 2012-04-11 | ||
+ | |- | ||
+ | | Well Total Depth: 3113.00 m | ||
+ | |- | ||
+ | | Surface Hole Latitude: 49.121772 | ||
+ | |- | ||
+ | | Surface Hole Longitude: -112.697039 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Licensing Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref><ref>{{cite web | ||
+ | | title = General Well Data File - Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2012-03-01 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 2012-03-15 | ||
+ | | Surface Casing Operation Performed | ||
+ | |- | ||
+ | | 2012-03-18 | ||
+ | | Direction Drilling Operation Performed - Deviate | ||
+ | |- | ||
+ | | 2012-03-23 | ||
+ | | Direction Drilling Operation Performed - Horizontal | ||
+ | |- | ||
+ | | 2012-03-25 | ||
+ | | Intermediate Casing Operation Performed | ||
+ | |- | ||
+ | | 2012-03-25 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-04-11 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 2012-04-11 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-04-11 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 2012-04-13 | ||
+ | | Liner Casing Operation Performed | ||
+ | |- | ||
+ | | 2012-04-13 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2012-04-14 | ||
+ | | Rig Released | ||
+ | |- | ||
+ | | 2012-05-08 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-05-24 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-05-24 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-05-25 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-05-25 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-05-26 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-05-26 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-05-27 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-05-27 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-05-28 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-05-28 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-05-29 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-05-29 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-05-30 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-05-30 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-05-31 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-05-31 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-06-01 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2012-06-01 | ||
+ | | Perforation Treatment Performed - Multi-Stage Fracture | ||
+ | |- | ||
+ | | 2012-07-01 | ||
+ | | Well Began Production | ||
+ | |- | ||
+ | | 2012-07-01 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 2012-07-01 | ||
+ | | Well Mode changed to Pumping | ||
+ | |- | ||
+ | | 2014-03-01 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 2014-03-01 | ||
+ | | Well Mode changed to Suspended | ||
+ | |- | ||
+ | | 2014-05-01 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 2014-05-01 | ||
+ | | Well Mode changed to Pumping | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-04-29 }}</ref> | ||
+ | <!--== Spud Table == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Spud Date | ||
+ | !scope="col" | Contractor | ||
+ | !scope="col" style="text-align: right;" | Rig Number | ||
+ | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
+ | !scope="col" | Activity Type | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Directional Drilling == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" style="text-align: right;" | Depth (m) | ||
+ | !scope="col" | Reason | ||
+ | |- | ||
+ | | 2012-03-18 | ||
+ | | style="text-align: right;" | 1416.20 | ||
+ | | Deviate (5 - 79 degrees) | ||
+ | |- | ||
+ | | 2012-03-23 | ||
+ | | style="text-align: right;" | 1708.10 | ||
+ | | Horizontal | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Direction Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Perforation Date | ||
+ | !scope="col" | Perforation Type | ||
+ | !scope="col" style="text-align: right;" | Interval Top (m) | ||
+ | !scope="col" style="text-align: right;" | Interval Base (m) | ||
+ | !scope="col" style="text-align: right;" | Number of Shots | ||
+ | |- | ||
+ | | 2012-05-08 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 3095.00 | ||
+ | | style="text-align: right;" | 3096.00 | ||
+ | | style="text-align: right;" | 21 | ||
+ | |- | ||
+ | | 2012-05-26 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2895.00 | ||
+ | | style="text-align: right;" | 2896.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-26 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2847.00 | ||
+ | | style="text-align: right;" | 2848.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2012-05-26 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2847.00 | ||
+ | | style="text-align: right;" | 2848.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-26 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2793.00 | ||
+ | | style="text-align: right;" | 2794.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2012-05-27 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2793.00 | ||
+ | | style="text-align: right;" | 2794.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-27 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2745.00 | ||
+ | | style="text-align: right;" | 2746.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2012-05-27 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2745.00 | ||
+ | | style="text-align: right;" | 2746.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-27 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2691.00 | ||
+ | | style="text-align: right;" | 2692.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2012-05-27 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2691.00 | ||
+ | | style="text-align: right;" | 2692.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2645.00 | ||
+ | | style="text-align: right;" | 2646.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2012-05-24 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3095.00 | ||
+ | | style="text-align: right;" | 3096.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-28 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2645.00 | ||
+ | | style="text-align: right;" | 2646.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2597.00 | ||
+ | | style="text-align: right;" | 2598.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2012-05-28 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2597.00 | ||
+ | | style="text-align: right;" | 2598.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2552.00 | ||
+ | | style="text-align: right;" | 2553.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2012-05-28 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2552.00 | ||
+ | | style="text-align: right;" | 2553.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-28 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2496.00 | ||
+ | | style="text-align: right;" | 2497.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2012-05-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2496.00 | ||
+ | | style="text-align: right;" | 2497.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-29 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2452.00 | ||
+ | | style="text-align: right;" | 2453.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2012-05-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2452.00 | ||
+ | | style="text-align: right;" | 2453.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-29 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2395.00 | ||
+ | | style="text-align: right;" | 2396.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2012-05-24 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 3005.00 | ||
+ | | style="text-align: right;" | 3006.00 | ||
+ | | style="text-align: right;" | 21 | ||
+ | |- | ||
+ | | 2012-05-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2395.00 | ||
+ | | style="text-align: right;" | 2396.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-29 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2348.00 | ||
+ | | style="text-align: right;" | 2349.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2012-05-29 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2348.00 | ||
+ | | style="text-align: right;" | 2349.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-30 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2295.00 | ||
+ | | style="text-align: right;" | 2296.00 | ||
+ | | style="text-align: right;" | 21 | ||
+ | |- | ||
+ | | 2012-05-30 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2295.00 | ||
+ | | style="text-align: right;" | 2296.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-30 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2241.00 | ||
+ | | style="text-align: right;" | 2242.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2012-05-30 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2241.00 | ||
+ | | style="text-align: right;" | 2242.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-30 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2195.00 | ||
+ | | style="text-align: right;" | 2196.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2012-05-30 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2185.00 | ||
+ | | style="text-align: right;" | 2186.00 | ||
+ | | style="text-align: right;" | 21 | ||
+ | |- | ||
+ | | 2012-05-31 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2185.00 | ||
+ | | style="text-align: right;" | 2186.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-25 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 3005.00 | ||
+ | | style="text-align: right;" | 3006.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-31 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2148.00 | ||
+ | | style="text-align: right;" | 2149.00 | ||
+ | | style="text-align: right;" | 21 | ||
+ | |- | ||
+ | | 2012-05-31 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2148.00 | ||
+ | | style="text-align: right;" | 2149.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-31 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2097.00 | ||
+ | | style="text-align: right;" | 2098.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2012-05-31 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2097.00 | ||
+ | | style="text-align: right;" | 2098.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-31 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 2045.00 | ||
+ | | style="text-align: right;" | 2046.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | |- | ||
+ | | 2012-05-31 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2045.00 | ||
+ | | style="text-align: right;" | 2046.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-05-31 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1997.00 | ||
+ | | style="text-align: right;" | 1998.00 | ||
+ | | style="text-align: right;" | 21 | ||
+ | |- | ||
+ | | 2012-05-31 | ||
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1997.00 | ||
+ | | style="text-align: right;" | 1998.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2012-06-01 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1942.00 | ||
+ | | style="text-align: right;" | 1943.00 | ||
+ | | style="text-align: right;" | 17 | ||
|- | |- | ||
− | | | + | | 2012-06-01 |
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1942.00 | ||
+ | | style="text-align: right;" | 1943.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2012-05-25 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 2949.00 | ||
+ | | style="text-align: right;" | 2950.00 | ||
+ | | style="text-align: right;" | 17 | ||
|- | |- | ||
− | | | + | | 2012-06-01 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 1897.00 | ||
+ | | style="text-align: right;" | 1898.00 | ||
+ | | style="text-align: right;" | 17 | ||
|- | |- | ||
− | | | + | | 2012-06-01 |
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 1897.00 | ||
+ | | style="text-align: right;" | 1898.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2012-05-25 |
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2949.00 | ||
+ | | style="text-align: right;" | 2950.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2012-05-25 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 2938.00 | ||
+ | | style="text-align: right;" | 2939.00 | ||
+ | | style="text-align: right;" | 21 | ||
|- | |- | ||
− | | | + | | 2012-05-26 |
+ | | Multi-Stage Fracture | ||
+ | | style="text-align: right;" | 2938.00 | ||
+ | | style="text-align: right;" | 2939.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2012-05-26 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 2895.00 | ||
+ | | style="text-align: right;" | 2896.00 | ||
+ | | style="text-align: right;" | 17 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Water Sources == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Water Diversion Start Date | ||
+ | !scope="col" | Water Diversion End Date | ||
+ | !scope="col" | Water Source Type | ||
+ | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" style="text-align: right;" | Total Production Hours | ||
+ | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
+ | |- | ||
+ | | 2012 | ||
+ | | style="text-align: right;" | 2805 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | style="text-align: right;" | 4597 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | style="text-align: right;" | 3156 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | style="text-align: right;" | 244 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | style="text-align: right;" | 406 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | style="text-align: right;" | 387 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | style="text-align: right;" | 582 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Well Production Data - All Alberta | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-25 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Occurences == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Occurence Date | ||
+ | !scope="col" | Occurence Type | ||
+ | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
+ | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
+ | |- | ||
+ | | 2012-03-13 | ||
+ | | No Incident Encountered | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | |- | ||
+ | | 2012-07-30 | ||
+ | | No Incident Encountered | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Occurence Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Alberta Wells]] |
Well ID: 0024212405000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.121772,"lon":-112.697039,"icon":""}]} |
Location: 00/05-24-002-21W4/0 | |
Location Alias: 00/05-24-02-21 W4M | |
Location Alias 2: 00/05-24-002-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 002 | |
Meridian: 4 | |
Range: 21 | |
Section: 24 | |
County/Municipality: Cardston County | |
Well Name: CPEC REAGAN 5-24-2-21 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0444592 | |
License Date: 2012-03-01 | |
License Status: Amended | |
Spud Date: 2012-03-13 | |
Final Drill Date: 2012-04-11 | |
Well Total Depth: 3113.00 m | |
Surface Hole Latitude: 49.121772 | |
Surface Hole Longitude: -112.697039 |
Date | Event |
---|---|
2012-03-01 | Obtained License |
2012-03-15 | Surface Casing Operation Performed |
2012-03-18 | Direction Drilling Operation Performed - Deviate |
2012-03-23 | Direction Drilling Operation Performed - Horizontal |
2012-03-25 | Intermediate Casing Operation Performed |
2012-03-25 | Well Log Performed |
2012-04-11 | Finished Drilling |
2012-04-11 | Well Log Performed |
2012-04-11 | Well Mode changed to Drilled and Cased |
2012-04-13 | Liner Casing Operation Performed |
2012-04-13 | Well Log Performed |
2012-04-14 | Rig Released |
2012-05-08 | Perforation Treatment Performed - Jet Perforation |
2012-05-24 | Perforation Treatment Performed - Jet Perforation |
2012-05-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-25 | Perforation Treatment Performed - Jet Perforation |
2012-05-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-26 | Perforation Treatment Performed - Jet Perforation |
2012-05-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-27 | Perforation Treatment Performed - Jet Perforation |
2012-05-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-28 | Perforation Treatment Performed - Jet Perforation |
2012-05-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-29 | Perforation Treatment Performed - Jet Perforation |
2012-05-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-30 | Perforation Treatment Performed - Jet Perforation |
2012-05-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-31 | Perforation Treatment Performed - Jet Perforation |
2012-05-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-01 | Perforation Treatment Performed - Jet Perforation |
2012-06-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-01 | Well Began Production |
2012-07-01 | Well Fluid changed to Crude Oil |
2012-07-01 | Well Mode changed to Pumping |
2014-03-01 | Well Fluid changed to Crude Oil |
2014-03-01 | Well Mode changed to Suspended |
2014-05-01 | Well Fluid changed to Crude Oil |
2014-05-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-03-18 | 1416.20 | Deviate (5 - 79 degrees) |
2012-03-23 | 1708.10 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-05-08 | Perforation | 3095.00 | 3096.00 | 21 |
2012-05-26 | Multi-Stage Fracture | 2895.00 | 2896.00 | 0 |
2012-05-26 | Perforation | 2847.00 | 2848.00 | 17 |
2012-05-26 | Multi-Stage Fracture | 2847.00 | 2848.00 | 0 |
2012-05-26 | Perforation | 2793.00 | 2794.00 | 17 |
2012-05-27 | Multi-Stage Fracture | 2793.00 | 2794.00 | 0 |
2012-05-27 | Perforation | 2745.00 | 2746.00 | 17 |
2012-05-27 | Multi-Stage Fracture | 2745.00 | 2746.00 | 0 |
2012-05-27 | Perforation | 2691.00 | 2692.00 | 17 |
2012-05-27 | Multi-Stage Fracture | 2691.00 | 2692.00 | 0 |
2012-05-28 | Perforation | 2645.00 | 2646.00 | 17 |
2012-05-24 | Multi-Stage Fracture | 3095.00 | 3096.00 | 0 |
2012-05-28 | Multi-Stage Fracture | 2645.00 | 2646.00 | 0 |
2012-05-28 | Perforation | 2597.00 | 2598.00 | 17 |
2012-05-28 | Multi-Stage Fracture | 2597.00 | 2598.00 | 0 |
2012-05-28 | Perforation | 2552.00 | 2553.00 | 17 |
2012-05-28 | Multi-Stage Fracture | 2552.00 | 2553.00 | 0 |
2012-05-28 | Perforation | 2496.00 | 2497.00 | 17 |
2012-05-29 | Multi-Stage Fracture | 2496.00 | 2497.00 | 0 |
2012-05-29 | Perforation | 2452.00 | 2453.00 | 17 |
2012-05-29 | Multi-Stage Fracture | 2452.00 | 2453.00 | 0 |
2012-05-29 | Perforation | 2395.00 | 2396.00 | 17 |
2012-05-24 | Perforation | 3005.00 | 3006.00 | 21 |
2012-05-29 | Multi-Stage Fracture | 2395.00 | 2396.00 | 0 |
2012-05-29 | Perforation | 2348.00 | 2349.00 | 17 |
2012-05-29 | Multi-Stage Fracture | 2348.00 | 2349.00 | 0 |
2012-05-30 | Perforation | 2295.00 | 2296.00 | 21 |
2012-05-30 | Multi-Stage Fracture | 2295.00 | 2296.00 | 0 |
2012-05-30 | Perforation | 2241.00 | 2242.00 | 17 |
2012-05-30 | Multi-Stage Fracture | 2241.00 | 2242.00 | 0 |
2012-05-30 | Perforation | 2195.00 | 2196.00 | 17 |
2012-05-30 | Perforation | 2185.00 | 2186.00 | 21 |
2012-05-31 | Multi-Stage Fracture | 2185.00 | 2186.00 | 0 |
2012-05-25 | Multi-Stage Fracture | 3005.00 | 3006.00 | 0 |
2012-05-31 | Perforation | 2148.00 | 2149.00 | 21 |
2012-05-31 | Multi-Stage Fracture | 2148.00 | 2149.00 | 0 |
2012-05-31 | Perforation | 2097.00 | 2098.00 | 17 |
2012-05-31 | Multi-Stage Fracture | 2097.00 | 2098.00 | 0 |
2012-05-31 | Perforation | 2045.00 | 2046.00 | 17 |
2012-05-31 | Multi-Stage Fracture | 2045.00 | 2046.00 | 0 |
2012-05-31 | Perforation | 1997.00 | 1998.00 | 21 |
2012-05-31 | Multi-Stage Fracture | 1997.00 | 1998.00 | 0 |
2012-06-01 | Perforation | 1942.00 | 1943.00 | 17 |
2012-06-01 | Multi-Stage Fracture | 1942.00 | 1943.00 | 0 |
2012-05-25 | Perforation | 2949.00 | 2950.00 | 17 |
2012-06-01 | Perforation | 1897.00 | 1898.00 | 17 |
2012-06-01 | Multi-Stage Fracture | 1897.00 | 1898.00 | 0 |
2012-05-25 | Multi-Stage Fracture | 2949.00 | 2950.00 | 0 |
2012-05-25 | Perforation | 2938.00 | 2939.00 | 21 |
2012-05-26 | Multi-Stage Fracture | 2938.00 | 2939.00 | 0 |
2012-05-26 | Perforation | 2895.00 | 2896.00 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2805 | 0.0 | 0.0 | 0.0 |
2014 | 4597 | 0.0 | 0.0 | 0.0 |
2015 | 3156 | 0.0 | 0.0 | 0.0 |
2016 | 244 | 0.0 | 0.0 | 0.0 |
2017 | 406 | 0.0 | 0.0 | 0.0 |
2018 | 387 | 0.0 | 0.0 | 0.0 |
2019 | 582 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-13 | No Incident Encountered | 0.00 | 0.00 |
2012-07-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]