X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0024212405000

Well Details

Well ID: 0024212405000
Loading map...
Location: 00/05-24-002-21W4/0
Location Alias: 00/05-24-02-21 W4M
Location Alias 2: 00/05-24-002-21 W4/00
Country: Canada
Province: Alberta
Township: 002
Meridian: 4
Range: 21
Section: 24
County/Municipality: Cardston County
Well Name: CPEC REAGAN 5-24-2-21
Operator Name: Crescent Point Energy Corp.
License Number: 0444592
License Date: 2012-03-01
License Status: Amended
Spud Date: 2012-03-13
Final Drill Date: 2012-04-11
Well Total Depth: 3113.00 m
Surface Hole Latitude: 49.121772
Surface Hole Longitude: -112.697039

For data sources see[1][2]

Well History

Date Event
2012-03-01 Obtained License
2012-03-15 Surface Casing Operation Performed
2012-03-18 Direction Drilling Operation Performed - Deviate
2012-03-23 Direction Drilling Operation Performed - Horizontal
2012-03-25 Intermediate Casing Operation Performed
2012-03-25 Well Log Performed
2012-04-11 Finished Drilling
2012-04-11 Well Log Performed
2012-04-11 Well Mode changed to Drilled and Cased
2012-04-13 Liner Casing Operation Performed
2012-04-13 Well Log Performed
2012-04-14 Rig Released
2012-05-08 Perforation Treatment Performed - Jet Perforation
2012-05-24 Perforation Treatment Performed - Jet Perforation
2012-05-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-25 Perforation Treatment Performed - Jet Perforation
2012-05-25 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-26 Perforation Treatment Performed - Jet Perforation
2012-05-26 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-27 Perforation Treatment Performed - Jet Perforation
2012-05-27 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-28 Perforation Treatment Performed - Jet Perforation
2012-05-28 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-29 Perforation Treatment Performed - Jet Perforation
2012-05-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-30 Perforation Treatment Performed - Jet Perforation
2012-05-30 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-31 Perforation Treatment Performed - Jet Perforation
2012-05-31 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-01 Perforation Treatment Performed - Jet Perforation
2012-06-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-01 Well Began Production
2012-07-01 Well Fluid changed to Crude Oil
2012-07-01 Well Mode changed to Pumping
2014-03-01 Well Fluid changed to Crude Oil
2014-03-01 Well Mode changed to Suspended
2014-05-01 Well Fluid changed to Crude Oil
2014-05-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-03-18 1416.20 Deviate (5 - 79 degrees)
2012-03-23 1708.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-08 Perforation 3095.00 3096.00 21
2012-05-26 Multi-Stage Fracture 2895.00 2896.00 0
2012-05-26 Perforation 2847.00 2848.00 17
2012-05-26 Multi-Stage Fracture 2847.00 2848.00 0
2012-05-26 Perforation 2793.00 2794.00 17
2012-05-27 Multi-Stage Fracture 2793.00 2794.00 0
2012-05-27 Perforation 2745.00 2746.00 17
2012-05-27 Multi-Stage Fracture 2745.00 2746.00 0
2012-05-27 Perforation 2691.00 2692.00 17
2012-05-27 Multi-Stage Fracture 2691.00 2692.00 0
2012-05-28 Perforation 2645.00 2646.00 17
2012-05-24 Multi-Stage Fracture 3095.00 3096.00 0
2012-05-28 Multi-Stage Fracture 2645.00 2646.00 0
2012-05-28 Perforation 2597.00 2598.00 17
2012-05-28 Multi-Stage Fracture 2597.00 2598.00 0
2012-05-28 Perforation 2552.00 2553.00 17
2012-05-28 Multi-Stage Fracture 2552.00 2553.00 0
2012-05-28 Perforation 2496.00 2497.00 17
2012-05-29 Multi-Stage Fracture 2496.00 2497.00 0
2012-05-29 Perforation 2452.00 2453.00 17
2012-05-29 Multi-Stage Fracture 2452.00 2453.00 0
2012-05-29 Perforation 2395.00 2396.00 17
2012-05-24 Perforation 3005.00 3006.00 21
2012-05-29 Multi-Stage Fracture 2395.00 2396.00 0
2012-05-29 Perforation 2348.00 2349.00 17
2012-05-29 Multi-Stage Fracture 2348.00 2349.00 0
2012-05-30 Perforation 2295.00 2296.00 21
2012-05-30 Multi-Stage Fracture 2295.00 2296.00 0
2012-05-30 Perforation 2241.00 2242.00 17
2012-05-30 Multi-Stage Fracture 2241.00 2242.00 0
2012-05-30 Perforation 2195.00 2196.00 17
2012-05-30 Perforation 2185.00 2186.00 21
2012-05-31 Multi-Stage Fracture 2185.00 2186.00 0
2012-05-25 Multi-Stage Fracture 3005.00 3006.00 0
2012-05-31 Perforation 2148.00 2149.00 21
2012-05-31 Multi-Stage Fracture 2148.00 2149.00 0
2012-05-31 Perforation 2097.00 2098.00 17
2012-05-31 Multi-Stage Fracture 2097.00 2098.00 0
2012-05-31 Perforation 2045.00 2046.00 17
2012-05-31 Multi-Stage Fracture 2045.00 2046.00 0
2012-05-31 Perforation 1997.00 1998.00 21
2012-05-31 Multi-Stage Fracture 1997.00 1998.00 0
2012-06-01 Perforation 1942.00 1943.00 17
2012-06-01 Multi-Stage Fracture 1942.00 1943.00 0
2012-05-25 Perforation 2949.00 2950.00 17
2012-06-01 Perforation 1897.00 1898.00 17
2012-06-01 Multi-Stage Fracture 1897.00 1898.00 0
2012-05-25 Multi-Stage Fracture 2949.00 2950.00 0
2012-05-25 Perforation 2938.00 2939.00 21
2012-05-26 Multi-Stage Fracture 2938.00 2939.00 0
2012-05-26 Perforation 2895.00 2896.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2805 0.0 0.0 0.0
2014 4597 0.0 0.0 0.0
2015 3156 0.0 0.0 0.0
2016 244 0.0 0.0 0.0
2017 406 0.0 0.0 0.0
2018 387 0.0 0.0 0.0
2019 582 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-13 No Incident Encountered 0.00 0.00
2012-07-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References