X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0395031610003"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0395031610003
 
| Well ID: 0395031610003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.357344, -114.370443 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.357344, -114.370443 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/10-16-039-03W5/3
 
| Location: 00/10-16-039-03W5/3
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/10-16-039-03 W5/03
 
| Location Alias 2: 00/10-16-039-03 W5/03
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 039
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 03
 +
|-
 +
| Section: 16
 
|-
 
|-
 
| County/Municipality: [[Eckville,_Alberta|Eckville]]
 
| County/Municipality: [[Eckville,_Alberta|Eckville]]
Line 17: Line 27:
 
| Well Name: CVE MEDRIV 10-16-39-3
 
| Well Name: CVE MEDRIV 10-16-39-3
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Cenovus Energy Inc.]]
 
|-
 
|-
 
| License Number: 0022472
 
| License Number: 0022472
Line 23: Line 33:
 
| License Date: 1962-05-29
 
| License Date: 1962-05-29
 
|-
 
|-
| License Status: Suspension
+
| License Status: Abandoned
 
|-
 
|-
 
| Spud Date: 1962-06-05
 
| Spud Date: 1962-06-05
Line 29: Line 39:
 
| Final Drill Date: 1962-06-22
 
| Final Drill Date: 1962-06-22
 
|-
 
|-
| Well Total Depth: 2186.9 m
+
| Well Total Depth: 2186.90 m
 
|-
 
|-
 
| Surface Hole Latitude: 52.357344
 
| Surface Hole Latitude: 52.357344
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1962-05-29
 +
| Obtained License
 +
|-
 +
| 1962-06-20
 +
| Drill Stem Test Performed
 +
|-
 +
| 1962-06-21
 +
| Drill Stem Test Performed
 +
|-
 +
| 1962-06-22
 +
| Drill Stem Test Performed
 +
|-
 +
| 1962-06-22
 +
| Finished Drilling
 +
|-
 +
| 1962-06-22
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1962-06-23
 +
| Production Casing Operation Performed
 +
|-
 +
| 1962-06-24
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1962-06-24
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1962-06-24
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1963-08-01
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1963-08-01
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1963-08-01
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1963-12-07
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1984-05-18
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1984-05-18
 +
| Well Log Performed
 +
|-
 +
| 1984-05-19
 +
| Well Log Performed
 +
|-
 +
| 1984-05-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-06-01
 +
| Well Began Production
 +
|-
 +
| 1984-06-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1984-06-01
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1987-05-01
 +
| Well Began Injection
 +
|-
 +
| 1987-05-01
 +
| Well Fluid changed to Water
 +
|-
 +
| 1987-05-01
 +
| Well Type changed to Injection
 +
|-
 +
| 1987-05-08
 +
| Well Log Performed
 +
|-
 +
| 1987-05-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1987-05-10
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1999-08-04
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1999-08-04
 +
| Plug Back Performed
 +
|-
 +
| 1999-08-04
 +
| Well Fluid changed to Water
 +
|-
 +
| 1999-08-04
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1999-08-04
 +
| Well Type changed to Injection
 +
|-
 +
| 1999-08-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-08-07
 +
| Well Log Performed
 +
|-
 +
| 1999-08-09
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2019-10-27
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2019-10-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2019-10-27
 +
| Plug Back Performed
 +
|-
 +
| 2019-10-27
 +
| Well Log Performed
 +
|-
 +
| 2019-10-28
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2019-10-28
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2019-10-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2019-10-28
 +
| Well Log Performed
 +
|-
 +
| 2019-10-29
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2019-10-29
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2019-10-29
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2019-10-29
 +
| Well Log Performed
 +
|-
 +
| 2019-10-30
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2019-10-30
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2019-10-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2019-10-30
 +
| Well Log Performed
 +
|-
 +
| 2019-11-05
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 255:
 
| 1962-06-24
 
| 1962-06-24
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2156.2
+
| style="text-align: right;" | 2156.20
| style="text-align: right;" | 2168.3
+
| style="text-align: right;" | 2168.30
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 +
|-
 +
| 1987-05-09
 +
| Perforation
 +
| style="text-align: right;" | 1895.50
 +
| style="text-align: right;" | 1897.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1987-05-10
 +
| Acid Treatment
 +
| style="text-align: right;" | 1895.50
 +
| style="text-align: right;" | 1898.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1999-08-04
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1895.00
 +
| style="text-align: right;" | 1898.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1999-08-07
 +
| Perforation
 +
| style="text-align: right;" | 2094.60
 +
| style="text-align: right;" | 2101.30
 +
| style="text-align: right;" | 17
 +
|-
 +
| 1999-08-09
 +
| Fracture
 +
| style="text-align: right;" | 2094.60
 +
| style="text-align: right;" | 2101.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-10-27
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2077.90
 +
| style="text-align: right;" | 2085.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-10-27
 +
| Perforation
 +
| style="text-align: right;" | 1006.00
 +
| style="text-align: right;" | 1007.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2019-10-27
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1878.90
 +
| style="text-align: right;" | 1886.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-10-28
 +
| Perforation
 +
| style="text-align: right;" | 513.00
 +
| style="text-align: right;" | 514.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2019-10-28
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1006.00
 +
| style="text-align: right;" | 1007.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1962-06-24
 
| 1962-06-24
| Acid Wash
+
| Acid Wash
| style="text-align: right;" | 2156.2
+
| style="text-align: right;" | 2156.20
| style="text-align: right;" | 2168.3
+
| style="text-align: right;" | 2168.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 2019-10-28
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 990.80
 +
| style="text-align: right;" | 999.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-10-29
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 390.90
 +
| style="text-align: right;" | 398.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-10-29
 +
| Perforation
 +
| style="text-align: right;" | 404.00
 +
| style="text-align: right;" | 405.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2019-10-29
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 498.90
 +
| style="text-align: right;" | 506.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-10-29
 +
| Cement Squeeze
 +
| style="text-align: right;" | 404.00
 +
| style="text-align: right;" | 405.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-10-30
 +
| Cement Squeeze
 +
| style="text-align: right;" | 219.00
 +
| style="text-align: right;" | 220.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-10-30
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 205.90
 +
| style="text-align: right;" | 213.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019-10-30
 +
| Perforation
 +
| style="text-align: right;" | 219.00
 +
| style="text-align: right;" | 220.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1962-06-24
 
| 1962-06-24
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2156.2
+
| style="text-align: right;" | 2156.20
| style="text-align: right;" | 2168.3
+
| style="text-align: right;" | 2168.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1963-08-01
 
| 1963-08-01
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2151.9
+
| style="text-align: right;" | 2151.90
| style="text-align: right;" | 2151.9
+
| style="text-align: right;" | 2151.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1963-08-01
 
| 1963-08-01
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 2125.1
+
| style="text-align: right;" | 2125.10
| style="text-align: right;" | 2126.9
+
| style="text-align: right;" | 2126.90
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1963-08-01
 
| 1963-08-01
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2125.1
+
| style="text-align: right;" | 2125.10
| style="text-align: right;" | 2126.9
+
| style="text-align: right;" | 2126.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1963-12-07
 
| 1963-12-07
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 2125.1
+
| style="text-align: right;" | 2125.10
| style="text-align: right;" | 2126.9
+
| style="text-align: right;" | 2126.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-05-18
 
| 1984-05-18
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2107
+
| style="text-align: right;" | 2107.00
| style="text-align: right;" | 2115
+
| style="text-align: right;" | 2115.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-05-20
 
| 1984-05-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1897
+
| style="text-align: right;" | 1897.00
| style="text-align: right;" | 1898.2
+
| style="text-align: right;" | 1898.20
 
| style="text-align: right;" | 15
 
| style="text-align: right;" | 15
|-
 
| 1987-05-09
 
| Perforation
 
| style="text-align: right;" | 1895.5
 
| style="text-align: right;" | 1897
 
| style="text-align: right;" | 13
 
|-
 
| 1987-05-10
 
| Acid Treatment
 
| style="text-align: right;" | 1895.5
 
| style="text-align: right;" | 1898.2
 
| style="text-align: right;" | 0
 
|-
 
| 1999-08-04
 
| Cement Squeeze
 
| style="text-align: right;" | 1895
 
| style="text-align: right;" | 1898.2
 
| style="text-align: right;" | 0
 
|-
 
| 1999-08-07
 
| Perforation
 
| style="text-align: right;" | 2094.6
 
| style="text-align: right;" | 2101.3
 
| style="text-align: right;" | 17
 
|-
 
| 1999-08-09
 
| Fracture
 
| style="text-align: right;" | 2094.6
 
| style="text-align: right;" | 2101.3
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
|}
 
|}
Line 160: Line 419:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 193: Line 466:
 
| 1984
 
| 1984
 
| style="text-align: right;" | 3758
 
| style="text-align: right;" | 3758
| style="text-align: right;" | 440.6
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 199: Line 472:
 
| 1985
 
| 1985
 
| style="text-align: right;" | 5664
 
| style="text-align: right;" | 5664
| style="text-align: right;" | 632.2
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 205: Line 478:
 
| 1986
 
| 1986
 
| style="text-align: right;" | 6365
 
| style="text-align: right;" | 6365
| style="text-align: right;" | 1197.1
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 211: Line 484:
 
| 1987
 
| 1987
 
| style="text-align: right;" | 780
 
| style="text-align: right;" | 780
| style="text-align: right;" | 386.4
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 22409.1
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1988
 
| 1988
Line 219: Line 492:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 29891.2
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1989
 
| 1989
Line 225: Line 498:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 24154.9
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1990
 
| 1990
Line 231: Line 504:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 23223.7
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1991
 
| 1991
Line 237: Line 510:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 24853.9
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1992
 
| 1992
Line 243: Line 516:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 24914.6
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1993
 
| 1993
Line 249: Line 522:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 20099.3
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1994
 
| 1994
Line 255: Line 528:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 4436.3
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1995
 
| 1995
Line 261: Line 534:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 15102.6
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1996
 
| 1996
Line 267: Line 540:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 4852.8
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1997
 
| 1997
Line 273: Line 546:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 3974.7
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1998
 
| 1998
Line 279: Line 552:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 534.3
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 285: Line 558:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
<!--== Occurences ==
+
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Occurence Date
 
!scope="col" | Occurence Date
Line 295: Line 568:
 
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 
|-
 
|-
|}-->
+
| 2019-10-30
 
+
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 18:39, 18 January 2021

Well Details

Well ID: 0395031610003
Loading map...
Location: 00/10-16-039-03W5/3
Location Alias: 00/10-16-39-03 W5M
Location Alias 2: 00/10-16-039-03 W5/03
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 16
County/Municipality: Eckville
Well Name: CVE MEDRIV 10-16-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0022472
License Date: 1962-05-29
License Status: Abandoned
Spud Date: 1962-06-05
Final Drill Date: 1962-06-22
Well Total Depth: 2186.90 m
Surface Hole Latitude: 52.357344
Surface Hole Longitude: -114.370443

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-05-29 Obtained License
1962-06-20 Drill Stem Test Performed
1962-06-21 Drill Stem Test Performed
1962-06-22 Drill Stem Test Performed
1962-06-22 Finished Drilling
1962-06-22 Well Mode changed to Drilled and Cased
1962-06-23 Production Casing Operation Performed
1962-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-24 Perforation Treatment Performed - Acid Wash - No Pressure
1962-06-24 Perforation Treatment Performed - Jet Perforation
1963-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1963-08-01 Perforation Treatment Performed - Bullet Perforation
1963-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-05-18 Well Log Performed
1984-05-19 Well Log Performed
1984-05-20 Perforation Treatment Performed - Jet Perforation
1984-06-01 Well Began Production
1984-06-01 Well Fluid changed to Crude Oil
1984-06-01 Well Mode changed to Flowing
1987-05-01 Well Began Injection
1987-05-01 Well Fluid changed to Water
1987-05-01 Well Type changed to Injection
1987-05-08 Well Log Performed
1987-05-09 Perforation Treatment Performed - Jet Perforation
1987-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-04 Perforation Treatment Performed - Cement Squeeze
1999-08-04 Plug Back Performed
1999-08-04 Well Fluid changed to Water
1999-08-04 Well Mode changed to Abandoned Zone
1999-08-04 Well Type changed to Injection
1999-08-07 Perforation Treatment Performed - Jet Perforation
1999-08-07 Well Log Performed
1999-08-09 Perforation Treatment Performed - Fractured
2019-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-27 Perforation Treatment Performed - Jet Perforation
2019-10-27 Plug Back Performed
2019-10-27 Well Log Performed
2019-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-28 Perforation Treatment Performed - Cement Squeeze
2019-10-28 Perforation Treatment Performed - Jet Perforation
2019-10-28 Well Log Performed
2019-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-29 Perforation Treatment Performed - Cement Squeeze
2019-10-29 Perforation Treatment Performed - Jet Perforation
2019-10-29 Well Log Performed
2019-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-30 Perforation Treatment Performed - Cement Squeeze
2019-10-30 Perforation Treatment Performed - Jet Perforation
2019-10-30 Well Log Performed
2019-11-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-06-24 Perforation 2156.20 2168.30 7
1987-05-09 Perforation 1895.50 1897.00 13
1987-05-10 Acid Treatment 1895.50 1898.20 0
1999-08-04 Cement Squeeze 1895.00 1898.20 0
1999-08-07 Perforation 2094.60 2101.30 17
1999-08-09 Fracture 2094.60 2101.30 0
2019-10-27 Packing Device Capped w/Cement 2077.90 2085.90 0
2019-10-27 Perforation 1006.00 1007.00 13
2019-10-27 Packing Device Capped w/Cement 1878.90 1886.90 0
2019-10-28 Perforation 513.00 514.00 13
2019-10-28 Cement Squeeze 1006.00 1007.00 0
1962-06-24 Acid Wash 2156.20 2168.30 0
2019-10-28 Packing Device Capped w/Cement 990.80 999.80 0
2019-10-29 Packing Device Capped w/Cement 390.90 398.90 0
2019-10-29 Perforation 404.00 405.00 13
2019-10-29 Packing Device Capped w/Cement 498.90 506.90 0
2019-10-29 Cement Squeeze 404.00 405.00 0
2019-10-30 Cement Squeeze 219.00 220.00 0
2019-10-30 Packing Device Capped w/Cement 205.90 213.90 0
2019-10-30 Perforation 219.00 220.00 13
1962-06-24 Acid Treatment 2156.20 2168.30 0
1963-08-01 Packing Device Capped w/Cement 2151.90 2151.90 0
1963-08-01 Bullet Perforation 2125.10 2126.90 7
1963-08-01 Acid Treatment 2125.10 2126.90 0
1963-12-07 Acid Treatment 2125.10 2126.90 0
1984-05-18 Packing Device Capped w/Cement 2107.00 2115.00 0
1984-05-20 Perforation 1897.00 1898.20 15

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 3758 0.0 0.0 0.0
1985 5664 0.0 0.0 0.0
1986 6365 0.0 0.0 0.0
1987 780 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References