If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395031610003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.357344,"lon":-114.370443,"icon":""}]} |
Location: 00/10-16-039-03W5/3 | |
Location Alias: 00/10-16-39-03 W5M | |
Location Alias 2: 00/10-16-039-03 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 03 | |
Section: 16 | |
County/Municipality: Eckville | |
Well Name: CVE MEDRIV 10-16-39-3 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0022472 | |
License Date: 1962-05-29 | |
License Status: Abandoned | |
Spud Date: 1962-06-05 | |
Final Drill Date: 1962-06-22 | |
Well Total Depth: 2186.90 m | |
Surface Hole Latitude: 52.357344 | |
Surface Hole Longitude: -114.370443 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1962-05-29 | Obtained License |
1962-06-20 | Drill Stem Test Performed |
1962-06-21 | Drill Stem Test Performed |
1962-06-22 | Drill Stem Test Performed |
1962-06-22 | Finished Drilling |
1962-06-22 | Well Mode changed to Drilled and Cased |
1962-06-23 | Production Casing Operation Performed |
1962-06-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-06-24 | Perforation Treatment Performed - Acid Wash - No Pressure |
1962-06-24 | Perforation Treatment Performed - Jet Perforation |
1963-08-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-08-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1963-08-01 | Perforation Treatment Performed - Bullet Perforation |
1963-12-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-05-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-05-18 | Well Log Performed |
1984-05-19 | Well Log Performed |
1984-05-20 | Perforation Treatment Performed - Jet Perforation |
1984-06-01 | Well Began Production |
1984-06-01 | Well Fluid changed to Crude Oil |
1984-06-01 | Well Mode changed to Flowing |
1987-05-01 | Well Began Injection |
1987-05-01 | Well Fluid changed to Water |
1987-05-01 | Well Type changed to Injection |
1987-05-08 | Well Log Performed |
1987-05-09 | Perforation Treatment Performed - Jet Perforation |
1987-05-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-04 | Perforation Treatment Performed - Cement Squeeze |
1999-08-04 | Plug Back Performed |
1999-08-04 | Well Fluid changed to Water |
1999-08-04 | Well Mode changed to Abandoned Zone |
1999-08-04 | Well Type changed to Injection |
1999-08-07 | Perforation Treatment Performed - Jet Perforation |
1999-08-07 | Well Log Performed |
1999-08-09 | Perforation Treatment Performed - Fractured |
2019-10-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-10-27 | Perforation Treatment Performed - Jet Perforation |
2019-10-27 | Plug Back Performed |
2019-10-27 | Well Log Performed |
2019-10-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-10-28 | Perforation Treatment Performed - Cement Squeeze |
2019-10-28 | Perforation Treatment Performed - Jet Perforation |
2019-10-28 | Well Log Performed |
2019-10-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-10-29 | Perforation Treatment Performed - Cement Squeeze |
2019-10-29 | Perforation Treatment Performed - Jet Perforation |
2019-10-29 | Well Log Performed |
2019-10-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-10-30 | Perforation Treatment Performed - Cement Squeeze |
2019-10-30 | Perforation Treatment Performed - Jet Perforation |
2019-10-30 | Well Log Performed |
2019-11-05 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1962-06-24 | Perforation | 2156.20 | 2168.30 | 7 |
1987-05-09 | Perforation | 1895.50 | 1897.00 | 13 |
1987-05-10 | Acid Treatment | 1895.50 | 1898.20 | 0 |
1999-08-04 | Cement Squeeze | 1895.00 | 1898.20 | 0 |
1999-08-07 | Perforation | 2094.60 | 2101.30 | 17 |
1999-08-09 | Fracture | 2094.60 | 2101.30 | 0 |
2019-10-27 | Packing Device Capped w/Cement | 2077.90 | 2085.90 | 0 |
2019-10-27 | Perforation | 1006.00 | 1007.00 | 13 |
2019-10-27 | Packing Device Capped w/Cement | 1878.90 | 1886.90 | 0 |
2019-10-28 | Perforation | 513.00 | 514.00 | 13 |
2019-10-28 | Cement Squeeze | 1006.00 | 1007.00 | 0 |
1962-06-24 | Acid Wash | 2156.20 | 2168.30 | 0 |
2019-10-28 | Packing Device Capped w/Cement | 990.80 | 999.80 | 0 |
2019-10-29 | Packing Device Capped w/Cement | 390.90 | 398.90 | 0 |
2019-10-29 | Perforation | 404.00 | 405.00 | 13 |
2019-10-29 | Packing Device Capped w/Cement | 498.90 | 506.90 | 0 |
2019-10-29 | Cement Squeeze | 404.00 | 405.00 | 0 |
2019-10-30 | Cement Squeeze | 219.00 | 220.00 | 0 |
2019-10-30 | Packing Device Capped w/Cement | 205.90 | 213.90 | 0 |
2019-10-30 | Perforation | 219.00 | 220.00 | 13 |
1962-06-24 | Acid Treatment | 2156.20 | 2168.30 | 0 |
1963-08-01 | Packing Device Capped w/Cement | 2151.90 | 2151.90 | 0 |
1963-08-01 | Bullet Perforation | 2125.10 | 2126.90 | 7 |
1963-08-01 | Acid Treatment | 2125.10 | 2126.90 | 0 |
1963-12-07 | Acid Treatment | 2125.10 | 2126.90 | 0 |
1984-05-18 | Packing Device Capped w/Cement | 2107.00 | 2115.00 | 0 |
1984-05-20 | Perforation | 1897.00 | 1898.20 | 15 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 3758 | 0.0 | 0.0 | 0.0 |
1985 | 5664 | 0.0 | 0.0 | 0.0 |
1986 | 6365 | 0.0 | 0.0 | 0.0 |
1987 | 780 | 0.0 | 0.0 | 0.0 |
1988 | 0 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-10-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]