X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0685082102000"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0685082102000
 
| Well ID: 0685082102000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.8959694, -115.1552145 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.895309, -115.155457 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: ARCAN SWANH 2-21-68-8
+
| Location: 00/02-21-068-08W5/0
 
|-
 
|-
| Operator:
+
| Location Alias: 00/02-21-68-08 W5M
 +
|-
 +
| Location Alias 2: 00/02-21-068-08 W5/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 068
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 08
 +
|-
 +
| Section: 21
 +
|-
 +
| County/Municipality: [[Big Lakes County,_Alberta|Big Lakes County]]
 +
|-
 +
| Well Name: ASPENLEAF SWANH 2-21-68-8
 +
|-
 +
| Operator Name: [[Aspenleaf Energy Limited]]
 +
|-
 +
| License Number: 0351986
 
|-
 
|-
 
| License Date: 2006-02-14
 
| License Date: 2006-02-14
 
|-
 
|-
| Final Drilling Date: 2006-03-17
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2006-03-02
 +
|-
 +
| Final Drill Date: 2006-03-17
 +
|-
 +
| Well Total Depth: 2454.00 m
 +
|-
 +
| Surface Hole Latitude: 54.895309
 +
|-
 +
| Surface Hole Longitude: -115.155457
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2006-02-14
 +
| Obtained License
 +
|-
 +
| 2006-03-04
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2006-03-17
 +
| Finished Drilling
 +
|-
 +
| 2006-03-17
 +
| Well Log Performed
 +
|-
 +
| 2006-03-17
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2006-03-18
 +
| Well Log Performed
 +
|-
 +
| 2006-03-20
 +
| Production Casing Operation Performed
 +
|-
 +
| 2006-03-20
 +
| Rig Released
 +
|-
 +
| 2006-05-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-06-02
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2006-06-16
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2006-07-15
 +
| Well Began Production
 
|-
 
|-
| Total Depth: 2454.0m
+
| 2006-07-15
 +
| Well Fluid changed to Crude Oil
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 2006-07-15
 +
| Well Mode changed to Pumping
 
|-
 
|-
| Status: Abandoned Zone
+
| 2011-08-27
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
| Well Type: Not Applicable
+
| 2011-08-27
 +
| Plug Back Performed
 
|-
 
|-
| Configuration: Vertical
+
| 2011-08-27
 +
| Well Fluid changed to Crude Oil
 
|-
 
|-
| Violations:
+
| 2011-08-27
 +
| Well Mode changed to Abandoned Zone
 
|-
 
|-
| Latitude: 54.8959694
+
| 2011-08-30
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Longitude: -115.1552145
+
| 2011-08-31
 +
| Perforation Treatment Performed - Fractured
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2006-05-26
 +
| Perforation
 +
| style="text-align: right;" | 2407.00
 +
| style="text-align: right;" | 2408.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2006-05-26
 +
| Perforation
 +
| style="text-align: right;" | 2412.00
 +
| style="text-align: right;" | 2415.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2006-05-26
 +
| Perforation
 +
| style="text-align: right;" | 2416.00
 +
| style="text-align: right;" | 2425.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2006-06-02
 +
| Fracture
 +
| style="text-align: right;" | 2407.00
 +
| style="text-align: right;" | 2425.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-06-16
 +
| Fracture
 +
| style="text-align: right;" | 2407.00
 +
| style="text-align: right;" | 2425.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-08-27
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2392.00
 +
| style="text-align: right;" | 2400.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-08-30
 +
| Perforation
 +
| style="text-align: right;" | 1309.50
 +
| style="text-align: right;" | 1313.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2011-08-30
 +
| Perforation
 +
| style="text-align: right;" | 1300.00
 +
| style="text-align: right;" | 1306.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2011-08-31
 +
| Fracture
 +
| style="text-align: right;" | 1300.00
 +
| style="text-align: right;" | 1313.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2006
 +
| style="text-align: right;" | 1008
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 09:43, 19 January 2021

Well Details

Well ID: 0685082102000
Loading map...
Location: 00/02-21-068-08W5/0
Location Alias: 00/02-21-68-08 W5M
Location Alias 2: 00/02-21-068-08 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 08
Section: 21
County/Municipality: Big Lakes County
Well Name: ASPENLEAF SWANH 2-21-68-8
Operator Name: Aspenleaf Energy Limited
License Number: 0351986
License Date: 2006-02-14
License Status: Issued
Spud Date: 2006-03-02
Final Drill Date: 2006-03-17
Well Total Depth: 2454.00 m
Surface Hole Latitude: 54.895309
Surface Hole Longitude: -115.155457

For data sources see[1][2]

Well History

Date Event
2006-02-14 Obtained License
2006-03-04 Surface Casing Operation Performed
2006-03-17 Finished Drilling
2006-03-17 Well Log Performed
2006-03-17 Well Mode changed to Drilled and Cased
2006-03-18 Well Log Performed
2006-03-20 Production Casing Operation Performed
2006-03-20 Rig Released
2006-05-26 Perforation Treatment Performed - Jet Perforation
2006-06-02 Perforation Treatment Performed - Fractured
2006-06-16 Perforation Treatment Performed - Fractured
2006-07-15 Well Began Production
2006-07-15 Well Fluid changed to Crude Oil
2006-07-15 Well Mode changed to Pumping
2011-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-27 Plug Back Performed
2011-08-27 Well Fluid changed to Crude Oil
2011-08-27 Well Mode changed to Abandoned Zone
2011-08-30 Perforation Treatment Performed - Jet Perforation
2011-08-31 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-05-26 Perforation 2407.00 2408.00 20
2006-05-26 Perforation 2412.00 2415.00 20
2006-05-26 Perforation 2416.00 2425.00 20
2006-06-02 Fracture 2407.00 2425.00 0
2006-06-16 Fracture 2407.00 2425.00 0
2011-08-27 Packing Device Capped w/Cement 2392.00 2400.00 0
2011-08-30 Perforation 1309.50 1313.00 17
2011-08-30 Perforation 1300.00 1306.00 17
2011-08-31 Fracture 1300.00 1313.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 1008 0.0 0.0 0.0

For data sources see[5]

References