If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0685082102000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.895309,"lon":-115.155457,"icon":""}]} |
Location: 00/02-21-068-08W5/0 | |
Location Alias: 00/02-21-68-08 W5M | |
Location Alias 2: 00/02-21-068-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 5 | |
Range: 08 | |
Section: 21 | |
County/Municipality: Big Lakes County | |
Well Name: ASPENLEAF SWANH 2-21-68-8 | |
Operator Name: Aspenleaf Energy Limited | |
License Number: 0351986 | |
License Date: 2006-02-14 | |
License Status: Issued | |
Spud Date: 2006-03-02 | |
Final Drill Date: 2006-03-17 | |
Well Total Depth: 2454.00 m | |
Surface Hole Latitude: 54.895309 | |
Surface Hole Longitude: -115.155457 |
Date | Event |
---|---|
2006-02-14 | Obtained License |
2006-03-04 | Surface Casing Operation Performed |
2006-03-17 | Finished Drilling |
2006-03-17 | Well Log Performed |
2006-03-17 | Well Mode changed to Drilled and Cased |
2006-03-18 | Well Log Performed |
2006-03-20 | Production Casing Operation Performed |
2006-03-20 | Rig Released |
2006-05-26 | Perforation Treatment Performed - Jet Perforation |
2006-06-02 | Perforation Treatment Performed - Fractured |
2006-06-16 | Perforation Treatment Performed - Fractured |
2006-07-15 | Well Began Production |
2006-07-15 | Well Fluid changed to Crude Oil |
2006-07-15 | Well Mode changed to Pumping |
2011-08-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-08-27 | Plug Back Performed |
2011-08-27 | Well Fluid changed to Crude Oil |
2011-08-27 | Well Mode changed to Abandoned Zone |
2011-08-30 | Perforation Treatment Performed - Jet Perforation |
2011-08-31 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-05-26 | Perforation | 2407.00 | 2408.00 | 20 |
2006-05-26 | Perforation | 2412.00 | 2415.00 | 20 |
2006-05-26 | Perforation | 2416.00 | 2425.00 | 20 |
2006-06-02 | Fracture | 2407.00 | 2425.00 | 0 |
2006-06-16 | Fracture | 2407.00 | 2425.00 | 0 |
2011-08-27 | Packing Device Capped w/Cement | 2392.00 | 2400.00 | 0 |
2011-08-30 | Perforation | 1309.50 | 1313.00 | 17 |
2011-08-30 | Perforation | 1300.00 | 1306.00 | 17 |
2011-08-31 | Fracture | 1300.00 | 1313.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 1008 | 0.0 | 0.0 | 0.0 |
For data sources see[5]