X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0856033506000"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0856033506000
 
| Well ID: 0856033506000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 56.411837, -118.360834 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 56.411837, -118.360834 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/06-35-085-03W6/0
 
| Location: 00/06-35-085-03W6/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/06-35-085-03 W6/00
 
| Location Alias 2: 00/06-35-085-03 W6/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 085
 +
|-
 +
| Meridian: 6
 +
|-
 +
| Range: 03
 +
|-
 +
| Section: 35
 
|-
 
|-
 
| County/Municipality: [[Clear Hills County,_Alberta|Clear Hills County]]
 
| County/Municipality: [[Clear Hills County,_Alberta|Clear Hills County]]
Line 17: Line 27:
 
| Well Name: LAKERIDGE HINES 6-35-85-3
 
| Well Name: LAKERIDGE HINES 6-35-85-3
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Shoreline Energy Corp.]]
 
|-
 
|-
 
| License Number: 0052087
 
| License Number: 0052087
Line 29: Line 39:
 
| Final Drill Date: 1975-01-15
 
| Final Drill Date: 1975-01-15
 
|-
 
|-
| Well Total Depth: 1055.5 m
+
| Well Total Depth: 1055.50 m
 
|-
 
|-
 
| Surface Hole Latitude: 56.411837
 
| Surface Hole Latitude: 56.411837
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1974-12-03
 +
| Obtained License
 +
|-
 +
| 1975-01-12
 +
| Drill Stem Test Performed
 +
|-
 +
| 1975-01-13
 +
| Drill Stem Test Performed
 +
|-
 +
| 1975-01-15
 +
| Finished Drilling
 +
|-
 +
| 1975-01-16
 +
| Drill Stem Test Performed
 +
|-
 +
| 1975-01-17
 +
| Drill Stem Test Performed
 +
|-
 +
| 1975-01-18
 +
| Production Casing Operation Performed
 +
|-
 +
| 1975-01-19
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1975-10-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1975-10-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1976-05-04
 +
| Well Began Production
 +
|-
 +
| 1976-05-04
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1976-05-04
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1981-07-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-07-28
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1984-10-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1984-10-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1984-10-04
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1984-10-04
 +
| Plug Back Performed
 +
|-
 +
| 1984-10-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-10-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1984-10-08
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1984-10-08
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1984-10-09
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1984-10-09
 +
| Plug Back Performed
 +
|-
 +
| 1986-01-09
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1986-01-09
 +
| Plug Back Performed
 +
|-
 +
| 1986-01-09
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1986-01-09
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1986-01-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1986-01-12
 +
| Well Log Performed
 +
|-
 +
| 1986-01-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1986-01-14
 +
| Well Log Performed
 +
|-
 +
| 1992-09-01
 +
| Well Log Performed
 +
|-
 +
| 1992-09-02
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1992-09-02
 +
| Plug Back Performed
 +
|-
 +
| 1992-09-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1992-09-11
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 1992-09-13
 +
| Well Log Performed
 +
|-
 +
| 1992-09-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1997-02-25
 +
| Well Log Performed
 +
|-
 +
| 1997-02-27
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1997-02-27
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1997-02-27
 +
| Plug Back Performed
 +
|-
 +
| 1997-02-27
 +
| Well Log Performed
 +
|-
 +
| 1997-02-28
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1997-02-28
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1997-02-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1997-03-01
 +
| Well Log Performed
 +
|-
 +
| 1997-03-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1997-03-03
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1997-03-03
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1997-03-03
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 258:
 
| 1975-10-01
 
| 1975-10-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 918.7
+
| style="text-align: right;" | 918.70
| style="text-align: right;" | 919.9
+
| style="text-align: right;" | 919.90
| style="text-align: right;" | 3
 
|-
 
| 1975-10-02
 
| Perforation
 
| style="text-align: right;" | 904.6
 
| style="text-align: right;" | 905.9
 
 
| style="text-align: right;" | 3
 
| style="text-align: right;" | 3
|-
 
| 1981-07-27
 
| Perforation
 
| style="text-align: right;" | 909.8
 
| style="text-align: right;" | 910.7
 
| style="text-align: right;" | 10
 
|-
 
| 1981-07-28
 
| Acid Treatment
 
| style="text-align: right;" | 909.8
 
| style="text-align: right;" | 910.7
 
| style="text-align: right;" | 0
 
|-
 
| 1984-10-04
 
| Cement Squeeze
 
| style="text-align: right;" | 904.6
 
| style="text-align: right;" | 910.7
 
| style="text-align: right;" | 0
 
|-
 
| 1984-10-07
 
| Perforation
 
| style="text-align: right;" | 1010.1
 
| style="text-align: right;" | 1013.2
 
| style="text-align: right;" | 13
 
|-
 
| 1984-10-08
 
| Perforation
 
| style="text-align: right;" | 932.1
 
| style="text-align: right;" | 933.3
 
| style="text-align: right;" | 13
 
|-
 
| 1984-10-08
 
| Perforation
 
| style="text-align: right;" | 933.9
 
| style="text-align: right;" | 934.5
 
| style="text-align: right;" | 13
 
 
|-
 
|-
 
| 1984-10-08
 
| 1984-10-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 936.4
+
| style="text-align: right;" | 937.60
| style="text-align: right;" | 937
+
| style="text-align: right;" | 938.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-10-08
 
| 1984-10-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 937.6
+
| style="text-align: right;" | 939.70
| style="text-align: right;" | 938.5
+
| style="text-align: right;" | 940.30
| style="text-align: right;" | 13
 
|-
 
| 1984-10-08
 
| Perforation
 
| style="text-align: right;" | 939.7
 
| style="text-align: right;" | 940.3
 
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1984-10-09
 
| 1984-10-09
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 988
+
| style="text-align: right;" | 988.00
| style="text-align: right;" | 996
+
| style="text-align: right;" | 996.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1986-01-09
 
| 1986-01-09
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 932.1
+
| style="text-align: right;" | 932.10
| style="text-align: right;" | 940.3
+
| style="text-align: right;" | 940.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1986-01-09
 
| 1986-01-09
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 918.7
+
| style="text-align: right;" | 918.70
| style="text-align: right;" | 919.9
+
| style="text-align: right;" | 919.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1986-01-12
 
| 1986-01-12
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1010.1
+
| style="text-align: right;" | 1010.10
| style="text-align: right;" | 1013.2
+
| style="text-align: right;" | 1013.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1986-01-13
 
| 1986-01-13
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1035
+
| style="text-align: right;" | 1035.00
| style="text-align: right;" | 1036.8
+
| style="text-align: right;" | 1036.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1992-09-02
 
| 1992-09-02
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1020
+
| style="text-align: right;" | 1020.00
| style="text-align: right;" | 1030
+
| style="text-align: right;" | 1030.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1992-09-02
 
| 1992-09-02
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 997
+
| style="text-align: right;" | 997.00
| style="text-align: right;" | 1005
+
| style="text-align: right;" | 1005.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1992-09-03
 
| 1992-09-03
 
| Perforation
 
| Perforation
| style="text-align: right;" | 581
+
| style="text-align: right;" | 581.00
| style="text-align: right;" | 581.5
+
| style="text-align: right;" | 581.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 +
|-
 +
| 1975-10-02
 +
| Perforation
 +
| style="text-align: right;" | 904.60
 +
| style="text-align: right;" | 905.90
 +
| style="text-align: right;" | 3
 
|-
 
|-
 
| 1992-09-03
 
| 1992-09-03
 
| Perforation
 
| Perforation
| style="text-align: right;" | 592
+
| style="text-align: right;" | 592.00
| style="text-align: right;" | 592.5
+
| style="text-align: right;" | 592.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1992-09-11
 
| 1992-09-11
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 581
+
| style="text-align: right;" | 581.00
| style="text-align: right;" | 592.5
+
| style="text-align: right;" | 592.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1992-09-14
 
| 1992-09-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 595.6
+
| style="text-align: right;" | 595.60
| style="text-align: right;" | 595.9
+
| style="text-align: right;" | 595.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1997-02-27
 
| 1997-02-27
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 595.6
+
| style="text-align: right;" | 595.60
| style="text-align: right;" | 595.9
+
| style="text-align: right;" | 595.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997-02-27
 
| 1997-02-27
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 565
+
| style="text-align: right;" | 565.00
| style="text-align: right;" | 580
+
| style="text-align: right;" | 580.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997-02-28
 
| 1997-02-28
 
| Perforation
 
| Perforation
| style="text-align: right;" | 548.7
+
| style="text-align: right;" | 548.70
| style="text-align: right;" | 549
+
| style="text-align: right;" | 549.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1997-02-28
 
| 1997-02-28
 
| Perforation
 
| Perforation
| style="text-align: right;" | 555.7
+
| style="text-align: right;" | 555.70
| style="text-align: right;" | 556
+
| style="text-align: right;" | 556.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1997-02-28
 
| 1997-02-28
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 548.7
+
| style="text-align: right;" | 548.70
| style="text-align: right;" | 549
+
| style="text-align: right;" | 549.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997-02-28
 
| 1997-02-28
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 538
+
| style="text-align: right;" | 538.00
| style="text-align: right;" | 554
+
| style="text-align: right;" | 554.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997-03-02
 
| 1997-03-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 297.7
+
| style="text-align: right;" | 297.70
| style="text-align: right;" | 300
+
| style="text-align: right;" | 300.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 +
|-
 +
| 1981-07-27
 +
| Perforation
 +
| style="text-align: right;" | 909.80
 +
| style="text-align: right;" | 910.70
 +
| style="text-align: right;" | 10
 
|-
 
|-
 
| 1997-03-03
 
| 1997-03-03
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 297.7
+
| style="text-align: right;" | 297.70
| style="text-align: right;" | 300
+
| style="text-align: right;" | 300.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997-03-03
 
| 1997-03-03
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 282
+
| style="text-align: right;" | 282.00
| style="text-align: right;" | 294
+
| style="text-align: right;" | 294.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1981-07-28
 +
| Acid Treatment
 +
| style="text-align: right;" | 909.80
 +
| style="text-align: right;" | 910.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1984-10-04
 +
| Cement Squeeze
 +
| style="text-align: right;" | 904.60
 +
| style="text-align: right;" | 910.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 1984-10-07
 +
| Perforation
 +
| style="text-align: right;" | 1010.10
 +
| style="text-align: right;" | 1013.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1984-10-08
 +
| Perforation
 +
| style="text-align: right;" | 932.10
 +
| style="text-align: right;" | 933.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1984-10-08
 +
| Perforation
 +
| style="text-align: right;" | 933.90
 +
| style="text-align: right;" | 934.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1984-10-08
 +
| Perforation
 +
| style="text-align: right;" | 936.40
 +
| style="text-align: right;" | 937.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
|}
 
|}
Line 262: Line 446:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 295: Line 493:
 
| 1976
 
| 1976
 
| style="text-align: right;" | 4220
 
| style="text-align: right;" | 4220
| style="text-align: right;" | 9343.6
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 301: Line 499:
 
| 1977
 
| 1977
 
| style="text-align: right;" | 6089
 
| style="text-align: right;" | 6089
| style="text-align: right;" | 10223.8
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 307: Line 505:
 
| 1978
 
| 1978
 
| style="text-align: right;" | 7726
 
| style="text-align: right;" | 7726
| style="text-align: right;" | 8085.3
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 313: Line 511:
 
| 1979
 
| 1979
 
| style="text-align: right;" | 6595
 
| style="text-align: right;" | 6595
| style="text-align: right;" | 6083.7
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 319: Line 517:
 
| 1980
 
| 1980
 
| style="text-align: right;" | 4942
 
| style="text-align: right;" | 4942
| style="text-align: right;" | 3112.7
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 7.3
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1981
 
| 1981
 
| style="text-align: right;" | 6859
 
| style="text-align: right;" | 6859
| style="text-align: right;" | 1780.0
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 25.3
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1982
 
| 1982
 
| style="text-align: right;" | 6764
 
| style="text-align: right;" | 6764
| style="text-align: right;" | 1950.1
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 124.7
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1983
 
| 1983
 
| style="text-align: right;" | 7529
 
| style="text-align: right;" | 7529
| style="text-align: right;" | 2330.5
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 420.6
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1984
 
| 1984
 
| style="text-align: right;" | 3923
 
| style="text-align: right;" | 3923
| style="text-align: right;" | 921.1
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 250.0
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 351: Line 549:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 366: Line 564:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 01:09, 20 January 2021

Well Details

Well ID: 0856033506000
Loading map...
Location: 00/06-35-085-03W6/0
Location Alias: 00/06-35-85-03 W6M
Location Alias 2: 00/06-35-085-03 W6/00
Country: Canada
Province: Alberta
Township: 085
Meridian: 6
Range: 03
Section: 35
County/Municipality: Clear Hills County
Well Name: LAKERIDGE HINES 6-35-85-3
Operator Name: Shoreline Energy Corp.
License Number: 0052087
License Date: 1974-12-03
License Status: Suspension
Spud Date: 1975-01-05
Final Drill Date: 1975-01-15
Well Total Depth: 1055.50 m
Surface Hole Latitude: 56.411837
Surface Hole Longitude: -118.360834

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-12-03 Obtained License
1975-01-12 Drill Stem Test Performed
1975-01-13 Drill Stem Test Performed
1975-01-15 Finished Drilling
1975-01-16 Drill Stem Test Performed
1975-01-17 Drill Stem Test Performed
1975-01-18 Production Casing Operation Performed
1975-01-19 Well Mode changed to Drilled and Cased
1975-10-01 Perforation Treatment Performed - Jet Perforation
1975-10-02 Perforation Treatment Performed - Jet Perforation
1976-05-04 Well Began Production
1976-05-04 Well Fluid changed to Gas
1976-05-04 Well Mode changed to Flowing
1981-07-27 Perforation Treatment Performed - Jet Perforation
1981-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-01 Well Fluid changed to Gas
1984-10-01 Well Mode changed to Suspended
1984-10-04 Perforation Treatment Performed - Cement Squeeze
1984-10-04 Plug Back Performed
1984-10-07 Perforation Treatment Performed - Jet Perforation
1984-10-08 Perforation Treatment Performed - Jet Perforation
1984-10-08 Well Fluid changed to Gas
1984-10-08 Well Mode changed to Suspended
1984-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-10-09 Plug Back Performed
1986-01-09 Perforation Treatment Performed - Cement Squeeze
1986-01-09 Plug Back Performed
1986-01-09 Well Fluid changed to Gas
1986-01-09 Well Mode changed to Abandoned Zone
1986-01-12 Perforation Treatment Performed - Jet Perforation
1986-01-12 Well Log Performed
1986-01-13 Perforation Treatment Performed - Jet Perforation
1986-01-14 Well Log Performed
1992-09-01 Well Log Performed
1992-09-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-02 Plug Back Performed
1992-09-03 Perforation Treatment Performed - Jet Perforation
1992-09-11 Perforation Treatment Performed - Remedial Casing
1992-09-13 Well Log Performed
1992-09-14 Perforation Treatment Performed - Jet Perforation
1997-02-25 Well Log Performed
1997-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-27 Perforation Treatment Performed - Cement Squeeze
1997-02-27 Plug Back Performed
1997-02-27 Well Log Performed
1997-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-28 Perforation Treatment Performed - Cement Squeeze
1997-02-28 Perforation Treatment Performed - Jet Perforation
1997-03-01 Well Log Performed
1997-03-02 Perforation Treatment Performed - Jet Perforation
1997-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-03 Perforation Treatment Performed - Cement Squeeze
1997-03-03 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-10-01 Perforation 918.70 919.90 3
1984-10-08 Perforation 937.60 938.50 13
1984-10-08 Perforation 939.70 940.30 13
1984-10-09 Packing Device Capped w/Cement 988.00 996.00 0
1986-01-09 Cement Squeeze 932.10 940.30 0
1986-01-09 Cement Squeeze 918.70 919.90 0
1986-01-12 Perforation 1010.10 1013.20 13
1986-01-13 Perforation 1035.00 1036.80 13
1992-09-02 Packing Device Capped w/Cement 1020.00 1030.00 0
1992-09-02 Packing Device Capped w/Cement 997.00 1005.00 0
1992-09-03 Perforation 581.00 581.50 13
1975-10-02 Perforation 904.60 905.90 3
1992-09-03 Perforation 592.00 592.50 13
1992-09-11 Remedial Casing Cementing 581.00 592.50 0
1992-09-14 Perforation 595.60 595.90 13
1997-02-27 Cement Squeeze 595.60 595.90 0
1997-02-27 Packing Device Capped w/Cement 565.00 580.00 0
1997-02-28 Perforation 548.70 549.00 13
1997-02-28 Perforation 555.70 556.00 13
1997-02-28 Cement Squeeze 548.70 549.00 0
1997-02-28 Packing Device Capped w/Cement 538.00 554.00 0
1997-03-02 Perforation 297.70 300.00 13
1981-07-27 Perforation 909.80 910.70 10
1997-03-03 Cement Squeeze 297.70 300.00 0
1997-03-03 Packing Device Capped w/Cement 282.00 294.00 0
1981-07-28 Acid Treatment 909.80 910.70 0
1984-10-04 Cement Squeeze 904.60 910.70 0
1984-10-07 Perforation 1010.10 1013.20 13
1984-10-08 Perforation 932.10 933.30 13
1984-10-08 Perforation 933.90 934.50 13
1984-10-08 Perforation 936.40 937.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 4220 0.0 0.0 0.0
1977 6089 0.0 0.0 0.0
1978 7726 0.0 0.0 0.0
1979 6595 0.0 0.0 0.0
1980 4942 0.0 0.0 0.0
1981 6859 0.0 0.0 0.0
1982 6764 0.0 0.0 0.0
1983 7529 0.0 0.0 0.0
1984 3923 0.0 0.0 0.0

For data sources see[5]

References