If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0856033506000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.411837,"lon":-118.360834,"icon":""}]} |
Location: 00/06-35-085-03W6/0 | |
Location Alias: 00/06-35-85-03 W6M | |
Location Alias 2: 00/06-35-085-03 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 085 | |
Meridian: 6 | |
Range: 03 | |
Section: 35 | |
County/Municipality: Clear Hills County | |
Well Name: LAKERIDGE HINES 6-35-85-3 | |
Operator Name: Shoreline Energy Corp. | |
License Number: 0052087 | |
License Date: 1974-12-03 | |
License Status: Suspension | |
Spud Date: 1975-01-05 | |
Final Drill Date: 1975-01-15 | |
Well Total Depth: 1055.50 m | |
Surface Hole Latitude: 56.411837 | |
Surface Hole Longitude: -118.360834 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1974-12-03 | Obtained License |
1975-01-12 | Drill Stem Test Performed |
1975-01-13 | Drill Stem Test Performed |
1975-01-15 | Finished Drilling |
1975-01-16 | Drill Stem Test Performed |
1975-01-17 | Drill Stem Test Performed |
1975-01-18 | Production Casing Operation Performed |
1975-01-19 | Well Mode changed to Drilled and Cased |
1975-10-01 | Perforation Treatment Performed - Jet Perforation |
1975-10-02 | Perforation Treatment Performed - Jet Perforation |
1976-05-04 | Well Began Production |
1976-05-04 | Well Fluid changed to Gas |
1976-05-04 | Well Mode changed to Flowing |
1981-07-27 | Perforation Treatment Performed - Jet Perforation |
1981-07-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-10-01 | Well Fluid changed to Gas |
1984-10-01 | Well Mode changed to Suspended |
1984-10-04 | Perforation Treatment Performed - Cement Squeeze |
1984-10-04 | Plug Back Performed |
1984-10-07 | Perforation Treatment Performed - Jet Perforation |
1984-10-08 | Perforation Treatment Performed - Jet Perforation |
1984-10-08 | Well Fluid changed to Gas |
1984-10-08 | Well Mode changed to Suspended |
1984-10-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-10-09 | Plug Back Performed |
1986-01-09 | Perforation Treatment Performed - Cement Squeeze |
1986-01-09 | Plug Back Performed |
1986-01-09 | Well Fluid changed to Gas |
1986-01-09 | Well Mode changed to Abandoned Zone |
1986-01-12 | Perforation Treatment Performed - Jet Perforation |
1986-01-12 | Well Log Performed |
1986-01-13 | Perforation Treatment Performed - Jet Perforation |
1986-01-14 | Well Log Performed |
1992-09-01 | Well Log Performed |
1992-09-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-09-02 | Plug Back Performed |
1992-09-03 | Perforation Treatment Performed - Jet Perforation |
1992-09-11 | Perforation Treatment Performed - Remedial Casing |
1992-09-13 | Well Log Performed |
1992-09-14 | Perforation Treatment Performed - Jet Perforation |
1997-02-25 | Well Log Performed |
1997-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-02-27 | Perforation Treatment Performed - Cement Squeeze |
1997-02-27 | Plug Back Performed |
1997-02-27 | Well Log Performed |
1997-02-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-02-28 | Perforation Treatment Performed - Cement Squeeze |
1997-02-28 | Perforation Treatment Performed - Jet Perforation |
1997-03-01 | Well Log Performed |
1997-03-02 | Perforation Treatment Performed - Jet Perforation |
1997-03-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-03-03 | Perforation Treatment Performed - Cement Squeeze |
1997-03-03 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-10-01 | Perforation | 918.70 | 919.90 | 3 |
1984-10-08 | Perforation | 937.60 | 938.50 | 13 |
1984-10-08 | Perforation | 939.70 | 940.30 | 13 |
1984-10-09 | Packing Device Capped w/Cement | 988.00 | 996.00 | 0 |
1986-01-09 | Cement Squeeze | 932.10 | 940.30 | 0 |
1986-01-09 | Cement Squeeze | 918.70 | 919.90 | 0 |
1986-01-12 | Perforation | 1010.10 | 1013.20 | 13 |
1986-01-13 | Perforation | 1035.00 | 1036.80 | 13 |
1992-09-02 | Packing Device Capped w/Cement | 1020.00 | 1030.00 | 0 |
1992-09-02 | Packing Device Capped w/Cement | 997.00 | 1005.00 | 0 |
1992-09-03 | Perforation | 581.00 | 581.50 | 13 |
1975-10-02 | Perforation | 904.60 | 905.90 | 3 |
1992-09-03 | Perforation | 592.00 | 592.50 | 13 |
1992-09-11 | Remedial Casing Cementing | 581.00 | 592.50 | 0 |
1992-09-14 | Perforation | 595.60 | 595.90 | 13 |
1997-02-27 | Cement Squeeze | 595.60 | 595.90 | 0 |
1997-02-27 | Packing Device Capped w/Cement | 565.00 | 580.00 | 0 |
1997-02-28 | Perforation | 548.70 | 549.00 | 13 |
1997-02-28 | Perforation | 555.70 | 556.00 | 13 |
1997-02-28 | Cement Squeeze | 548.70 | 549.00 | 0 |
1997-02-28 | Packing Device Capped w/Cement | 538.00 | 554.00 | 0 |
1997-03-02 | Perforation | 297.70 | 300.00 | 13 |
1981-07-27 | Perforation | 909.80 | 910.70 | 10 |
1997-03-03 | Cement Squeeze | 297.70 | 300.00 | 0 |
1997-03-03 | Packing Device Capped w/Cement | 282.00 | 294.00 | 0 |
1981-07-28 | Acid Treatment | 909.80 | 910.70 | 0 |
1984-10-04 | Cement Squeeze | 904.60 | 910.70 | 0 |
1984-10-07 | Perforation | 1010.10 | 1013.20 | 13 |
1984-10-08 | Perforation | 932.10 | 933.30 | 13 |
1984-10-08 | Perforation | 933.90 | 934.50 | 13 |
1984-10-08 | Perforation | 936.40 | 937.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 4220 | 0.0 | 0.0 | 0.0 |
1977 | 6089 | 0.0 | 0.0 | 0.0 |
1978 | 7726 | 0.0 | 0.0 | 0.0 |
1979 | 6595 | 0.0 | 0.0 | 0.0 |
1980 | 4942 | 0.0 | 0.0 | 0.0 |
1981 | 6859 | 0.0 | 0.0 | 0.0 |
1982 | 6764 | 0.0 | 0.0 | 0.0 |
1983 | 7529 | 0.0 | 0.0 | 0.0 |
1984 | 3923 | 0.0 | 0.0 | 0.0 |
For data sources see[5]