If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
+ | __TOC__ | ||
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
Line 33: | Line 34: | ||
|- | |- | ||
|} | |} | ||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" |
Well ID: 37-131-20026 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.640805,"lon":-75.811055,"icon":""}]} |
County: Wyoming | |
Municipality: Nicholson Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 149079 | |
Farm/Lease Name: POLOVITCH UNIT 1 | |
First Permit Date: 2010-03-02 | |
Last Permit Date: 2010-03-02 | |
Spud Date: 2010-07-07 | |
Unconventional: Yes | |
Horizontal: No | |
Producing: Yes | |
Violations: 4 | |
Latitude: 41.640805 | |
Longitude: -75.811055 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1903235 | 2010-07-28 | Violation(s) Noted | 592428 | |
1903235 | 2010-07-28 | Violation(s) Noted | 592429 | |
1903235 | 2010-07-28 | Violation(s) Noted | 592430 | |
1903235 | 2010-07-28 | Violation(s) Noted | 592431 | |
1963695 | 2011-04-06 | No Violations Noted | Ziggenfuss drilled to 657' from ground. 20" cond. set at 120'
Setting up UDI Rig 58 - will set 13 3/8" surf prob tomorrow 4/7/2011 |
|
1993490 | 2011-07-25 | No Violations Noted | No well tag.
No containment under vent pipes. Vent pipe on 5 1/2" X 13 3/8"annulus and 9 5/8"X 13 3/8" annulus running to frac tank. No water in cellar. 2 pallets of chemicals still on site. Called Rich Adams. He said chemicals are for fracing which will begin soon. |
|
2005959 | 2011-09-27 | No Violations Noted | ||
2005969 | 2011-09-28 | No Violations Noted | Sampled water in sediment trap for 046 and MBAS Analysis. Suspected that vegetation may be distressed. I identified the vegetation as Epilobium hirsutum. The coloring is naturally occurring. | |
2026242 | 2011-12-09 | No Violations Noted | 1957 psi on guage - in production.
1 Annulus vent - cellar filled in. |
|
2029320 | 2011-12-15 | Pending | On site w/ Eric Rooney to gather isotopic samples from annulus. Also on site are Rich Adams, Ralph Larson, Jon Hafer, representing Chief. There is only 1 annulus vent and cellar is filled in. We think it is the 5 1/2 X 9 5/8" annulus, but cellar will be dug up to confirm.
blue - 4178 psi and 100% comb. gas |
|
2029323 | 2011-12-19 | Pending | On site w/ Kevin Costello. Met Rich Adams, Chief rep. Cellar has been dug up to confirm that vent goes to 9 5/8 X 5 1/2" annulus. It does & is the only annulus vented. | |
2039242 | 2012-01-17 | Pending | Another vent line has been added. ( 1" line) Pressure guage, but annulus is vented. Need to identify annulus and check for gas, get shut in pressure reading. | |
2047130 | 2012-02-22 | Pending | Met jon Hafer, Langan Eng and Ralph Larsen, Chief on Polovitch Pad to take gas and pressure readings from the 9 5/8" X 13 3/8" annulus. The 13 3/8 X 20" annulus is not accessible.
1st reading - XXX comb and 100% methane. Shut in annulus to get pressure. after 10 min - 0 psi, after 20 min - 0 psi. Rechecked annulus with gas meter - XXX comb and 3% methane. Jon Hafer got a 65% LEL 1st time and 70% LEL 2nd reading. Shut well in for 24 hr build-up. Reading the following day was 0 psi. |
|
2051388 | 2012-03-15 | Pending | 1120psi on prod.
cellar dug out, small amount of water in cellar, saw some very minor bubbling from floor of cellar. |
|
2062411 | 2012-04-12 | Pending | Producing well, 1133 psi.
Cellar is dug out. No water in cellar. 2 annular vents piped to tank. No change since last inspection. |
|
2062430 | 2012-03-27 | Pending | Producing. Cellar dug out, no water, 2 vents. | |
2064976 | 2012-04-27 | Pending | pressure guages installed on 2 vents, vents closed
prod 1122psi 5 1/2 x 9 5/8" 370 psi 9 5/8 X 20 0 psi cellar dug out - no water |
|
2067585 | 2012-05-14 | Pending | Cellar is dug out. 2 annular vents - open.
1123 psi on prod and 6 psi on ( 5x9)? Small amount of water in cellar. Minor bubbling coming from cellar bottom. |
|
2078708 | 2012-06-18 | Pending | Concrete barriers have been placed around well head. Cellar is dug out w/ some water - no bubbles.
There are 2 annular vents. Both are open. The well is producing - has 1118 psi on prod. |
|
2086706 | 2012-07-24 | Pending | No change since last insp. Some water in cellar - no bubbles. There are 2 annular vents - both open, vented.
1136 psi on prod. |
|
2087772 | 2012-07-30 | Pending | Prod. well. Has 2 annular vents, open. Clean water in cellar, no bubbles. Prod. has 105 psi. No change since last insp. | |
2097247 | 2012-08-30 | Pending | On site w/ Kevin Costello(DEP), Ralph Larsen(Chief), & Jon Hafer(Chief Consult.) to check pressures and flows in annuli. Shut in 2 annuli for 29 min, pressure = 0 psi on both. Did not install orifice meter for flows - no flow. | |
2103129 | 2012-09-14 | Pending | Some water in celar, no bubbles. Cellar is dug out. 2 annular vents, both open to tank.
Prod. 209 psi, well is, having some problems with fluid, hence the low pressure. Talked to Peter, Chief. He is getting the well back online. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 11338.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 20411.55 | 167.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 7805.0 | 56.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | PRODUCED FLUID | 433.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2010-2 | DRILLING FLUID WASTE | 940.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 | EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) | WILLIAMSPORT | PA |
2010-2 | FRACING FLUID WASTE | 1040.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 | EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) | WILLIAMSPORT | PA |
2011-1 | DRILL CUTTINGS | 19.76 | Tons | LANDFILL | 301626 | WHITE PINES LANDFILL | MILLVILLE | PA |
2012-1 | PRODUCED FLUID | 601.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING |