If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-131-20026 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.640806,"lon":-75.811056,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Nicholson Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 149079 | |
Farm/Lease Name: POLOVITCH UNIT | |
License Status: Plugged and Abandoned | |
Spud Date: 2010-07-09 | |
Permit Date: 2010-03-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.640806 | |
Longitude: -75.811056 |
Date | Event |
---|---|
2010-03-02 | New Permit Application |
2010-07-07 | Performed Spud Operation |
2010-07-23 | Drilling Completion |
2011-03-19 | Perforation |
2011-03-19 | Performed Stimulation |
2011-09-28 | NEWLY DRILLED |
2016-02-10 | Begin Plugging |
2018-11-08 | Finished Plugging |
2018-12-13 | Fully Plugged |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-03-20 | 2011-03-20 | 7,765 | 855,792 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scaletrol 720 | BJ Services Company | Scale Inhibitor | Diethylene glycol | 111-46-6 | |||
Ethylene glycol | 107-21-1 | 0.05 | ||||||
Techni-Hib 604 | BJ Services Company | Oxygen Scavenger | Water | 7732-18-5 | 5.00 | |||
Ammonium bisulfite | 10192-30-0 | 75.00 | 0.01 | |||||
FRW-18 | BJ Services Company | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 0.07 | |||
Alpha 1427 | BJ Services Company | Biocide | Ethanol | 64-17-5 | ||||
Water | 7732-18-5 | |||||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | |||||||
Glutaraldehyde | 111-30-8 | 0.02 | ||||||
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | |||||||
Sand (Proppant) | BJ Services Company | Propping Agent | Quartz | 14808-60-7 | 99.90 | 9.92 | ||
Water | Base Fluid | Water | 100.00 | 89.91 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-03-19 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHIEF OIL & GAS LLC | 7,805.00 | 56 | 0.00 | 0 | 0.00 | 0 |
2012 | CHIEF OIL & GAS LLC | 31,749.55 | 351 | 0.00 | 0 | 0.00 | 0 |
2013 | CHIEF OIL & GAS LLC | 20,216.00 | 267 | 0.00 | 0 | 0.00 | 0 |
2014 | CHIEF OIL & GAS LLC | 14,245.00 | 38 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 99.11 | 5 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 940.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 1,040.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | CHIEF OIL & GAS LLC | Drill Cuttings | 19.76 Tons | LANDFILL | 301626 |
2012 | CHIEF OIL & GAS LLC | Produced Fluid | 1,034.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHIEF OIL & GAS LLC | Produced Fluid | 467.80 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Produced Fluid | 386.40 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 7.89 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Fracturing Fluid Waste | 40.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 157.86 Bbl | LANDFILL | 301358 |
2018 | CHIEF OIL & GAS LLC | Spent Lubricant Waste | 12.81 Bbl | LANDFILL | 301358 |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 8.51 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1903235 | Primary Facility | 2010-07-28 | Routine/Complete Inspection | Violation(s) Noted | |
1963695 | Primary Facility | 2011-04-06 | Drilling/Alteration | No Violations Noted | Ziggenfuss drilled to 657' from ground. 20" cond. set at 120' |
1993490 | Primary Facility | 2011-07-25 | Routine/Complete Inspection | No Violations Noted | No well tag. |
2005959 | Primary Facility | 2011-09-27 | Routine/Complete Inspection | No Violations Noted | |
2005969 | Primary Facility | 2011-09-28 | Follow-up Inspection | No Violations Noted | Sampled water in sediment trap for 046 and MBAS Analysis. Suspected that vegetation may be distressed. I identified the vegetation as Epilobium hirsutum. The coloring is naturally occurring. |
2026242 | Primary Facility | 2011-12-09 | Complaint Inspection | No Violations Noted | 1957 psi on guage - in production. |
2029320 | Primary Facility | 2011-12-15 | Complaint Inspection | Pending | On site w/ Eric Rooney to gather isotopic samples from annulus. Also on site are Rich Adams, Ralph Larson, Jon Hafer, representing Chief. There is only 1 annulus vent and cellar is filled in. We think it is the 5 1/2 X 9 5/8" annulus, but cellar will be dug up to confirm. |
2029323 | Primary Facility | 2011-12-19 | Follow-up Inspection | Pending | On site w/ Kevin Costello. Met Rich Adams, Chief rep. Cellar has been dug up to confirm that vent goes to 9 5/8 X 5 1/2" annulus. It does & is the only annulus vented. |
2039242 | Primary Facility | 2012-01-17 | Follow-up Inspection | Pending | Another vent line has been added. ( 1" line) Pressure guage, but annulus is vented. Need to identify annulus and check for gas, get shut in pressure reading. |
2047130 | Primary Facility | 2012-02-22 | Follow-up Inspection | Pending | Met jon Hafer, Langan Eng and Ralph Larsen, Chief on Polovitch Pad to take gas and pressure readings from the 9 5/8" X 13 3/8" annulus. The 13 3/8 X 20" annulus is not accessible. |
2051388 | Primary Facility | 2012-03-15 | Routine/Complete Inspection | Pending | 1120psi on prod. |
2062411 | Primary Facility | 2012-04-12 | Routine/Complete Inspection | Pending | Producing well, 1133 psi. |
2062430 | Primary Facility | 2012-03-27 | Routine/Complete Inspection | Pending | Producing. Cellar dug out, no water, 2 vents. |
2064976 | Primary Facility | 2012-04-27 | Routine/Complete Inspection | Pending | pressure guages installed on 2 vents, vents closed |
2067585 | Primary Facility | 2012-05-14 | Routine/Complete Inspection | Pending | Cellar is dug out. 2 annular vents - open. |
2078708 | Primary Facility | 2012-06-18 | Follow-up Inspection | Pending | Concrete barriers have been placed around well head. Cellar is dug out w/ some water - no bubbles. |
2086706 | Primary Facility | 2012-07-24 | Follow-up Inspection | Pending | No change since last insp. Some water in cellar - no bubbles. There are 2 annular vents - both open, vented. |
2087772 | Primary Facility | 2012-07-30 | Follow-up Inspection | Pending | Prod. well. Has 2 annular vents, open. Clean water in cellar, no bubbles. Prod. has 105 psi. No change since last insp. |
2097247 | Primary Facility | 2012-08-30 | Follow-up Inspection | Pending | On site w/ Kevin Costello(DEP), Ralph Larsen(Chief), & Jon Hafer(Chief Consult.) to check pressures and flows in annuli. Shut in 2 annuli for 29 min, pressure = 0 psi on both. Did not install orifice meter for flows - no flow. |
2103129 | Primary Facility | 2012-09-14 | Follow-up Inspection | Pending | Some water in celar, no bubbles. Cellar is dug out. 2 annular vents, both open to tank. |
2143346 | Primary Facility | 2013-02-25 | Routine/Complete Inspection | Pending | Annular vents are shut (2). |
2175540 | Primary Facility | 2013-06-11 | Routine/Complete Inspection | Pending | Prod well - 780 psi. 2 annular vents are open. |
2196362 | Primary Facility | 2013-08-14 | Routine/Complete Inspection | Pending | Producing well. |
2213507 | Primary Facility | 2013-10-01 | Follow-up Inspection | Pending | On site w/ Eric Rooney, DEP and Jon Hafer, Chief to collect isotopic samples from various annuli. |
2240215 | Primary Facility | 2014-01-24 | Routine/Complete Inspection | Pending | No activity on site. |
2321166 | Primary Facility | 2014-11-04 | Follow-up Inspection | Violation(s) Noted | |
2449071 | Primary Facility | 2016-02-10 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2450142 | Primary Facility | 2016-02-17 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2455517 | Primary Facility | 2016-02-22 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2463229 | Primary Facility | 2016-02-26 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2463267 | Primary Facility | 2016-02-29 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2463688 | Primary Facility | 2016-03-07 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2465120 | Primary Facility | 2016-03-11 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2465158 | Primary Facility | 2016-03-15 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2469100 | Primary Facility | 2016-03-23 | Plugging(Includes Plugged/Mined Through) | Outstanding Violations - No Viols Req'd | |
2619915 | Primary Facility | 2017-07-27 | Plugging(Includes Plugged/Mined Through) | Outstanding Violations - Viols Req'd | |
2621308 | Primary Facility | 2017-08-01 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | 1st Stage of re-plugging operations completed. DO Cement plug 493' - 725'. Undereamed window in 9 5/8" csg (670' - 722'). Evacuated wellbore fluid to 655'. Will be monitoring 1V open well bore through BOP for ~ 6 days then will perform SI and PBUT on 1H, 4H & 5H 13x9 annuli and wellbores to assess impact of stage 1 re-P&A efforts on 1V well. |
2625009 | Primary Facility | 2017-08-09 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | |
2628403 | Primary Facility | 2017-08-22 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | |
2632152 | Primary Facility | 2017-08-31 | Plugging(Includes Plugged/Mined Through) | In Compliance with Schedule | |
2670023 | Primary Facility | 2017-12-11 | Follow-up Inspection | Pending | There was no activity occurring at the site at the time of the inspection. I was accompanied by Jon Sassi (EPS) and consulted with Ken Kennedy (OGI). At the time of this inspection I was not able to discern the construct of the cellar. Indirect pollution of the waters of the Commonwealth may have occurred. Results of this inspection are "Pending" until cellar construct is confirmed by operator and follow-up inspection. If you have any questions, please contact me. |
2703207 | Primary Facility | 2018-02-22 | Compliance Evaluation | In Compliance with Schedule | Arrived onsite at 15:15. Onsite to check on progress of re plumbing of all (4) wells annular vents to surface in preparation for long term venting phase as discussed and agreed to in the Depts. meeting with Chief O&G of 2/14/18. All (4) wells, the Polovitch 1H, 1V, 4H and 5H, have had their (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB) annular vents plumbed to surface via 2" vents. Vents had been fitted with ball valves and Tees w/ needle valves to access vents for sampling and eventual PBUTs. The Dept. will be meeting Chief O&G Rep., Jon Hafer back at pad tomorrow morning at 09:30 to obtain gas samples off all annuli, where gas is present, for Isotopic analysis. Chief O&G has had all annular spaces and vents purged of fluid and were shut in earlier today in preparation for tomorrows sampling event. (See attached, "As Plugged" Well Bore Schematics for individual wells for plugging details as of 2/14/18).
All previous, deteriorated pad liner and debris have been removed from location. Location was fo |
2703218 | Primary Facility | 2018-02-23 | Compliance Evaluation | In Compliance with Schedule | Arrived onsite at 09:00. Upon arrival met up with Chief O&G Rep., Jonathan Hafer and D.E.P. Geologist, Eric Rooney. Onsite to initiate the 1st long term, approx. 90 day, venting period as agreed to in meeting of 2/14/18 with Chief O&G. All (4) wells annuli vents, the (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB) were re-plumbed to surface and shut-in yesterday in preparation for todays sampling. Mr. Hafer explained that he would be taking gas samples off all the wells annular vents to send off for analysis. Following Mr. Hafers collection of annuli samples, I performed gas screenings at all (4) wells annuli using a ALTAIR 5X gas meter calibrated on 2/5/18. Gas was detected at the following wells annuli:
1H: (13 x 9) = 100% LEL, 100% CH4, 4H: (13 x 9) = 100 % LEL, 30 % CH4, 5H: (13 x 9) = 100 % LEL, 8 % CH4, Following sample collection and gas screenings, all (4) wells annuli were opened to vent to atmosphere. This long term venting period will extend for ~ 90 days. Operator will then be performing |
2775959 | Primary Facility | 2018-08-31 | Compliance Evaluation | In Compliance with Schedule | Arrived onsite at 11:00. Upon arrival met with Chief O&G Rep., Jonathan Hafer to conclude the 7 day PBUTs being performed on all (4) wells annuli vents, the (20" x 13 3/8"), (13 3/8" x 9 5/8") and (9 5/8" / WB). This is the 2nd PBUT being performed after (2) full 90 day, long term venting periods. Pre-shut in test gas screenings were performed at all wells annular vents on 8/24/18 by Mr. Hafer using a Rae Systems Multi-Rae gas meter, calibrated that morning. The only annuli where gas was detected are listed below:
1H: (13x9) = 3.1% CH4, 51% LEL 1V: (9/WB) = 1.6% CH4, 36% LEL 4H: (13x9) = 1.9% CH4, 70% LEL 5H: (13x9) = 6.6% CH4, 100% LEL Today, the ending 7 day PBUT results were: 1H: (20x13)= 0.40 psi, (13x9)= 12.95 psi, (9/WB)= 0.44 psi. 1V: (20x13)= -0.10 psi, (13x9)= -2.0 psi, (9/WB)= 0.45 psi. 4H: (20x13)= 0.10 psi, (13x9)= 11.10 psi, (9/WB)= 0.70 psi. 5H: (20x13)= 0.65 psi, (13x9)= 5.2 psi, (9/WB)= 0.75psi. - Mr. Hafer explained that he would be collecting samples off all the wells annular vents to sen |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1903235 | 592428 | 07/28/2010 | 2010-07-28 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | |
1903235 | 592429 | 07/28/2010 | 2010-07-28 | 691.1 - Clean Streams Law-General. Used only when a specific CLS code cannot be used | Administrative | |
1903235 | 592430 | 07/28/2010 | 2010-07-28 | 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table | Administrative | cited 78.56(a) cutting not contained within a pit |
1903235 | 592431 | 07/28/2010 | 2010-07-28 | 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith | Administrative | |
2321166 | 710142 | 11/04/2014 | 2014-11-04 | 78.73A - Operator shall prevent gas and other fluids from lower formations from entering fresh groundwater. | Environmental Health & Safety | Actually 78.73(b)......miss labeled in eFacts |
2321166 | 710143 | 11/04/2014 | 2014-11-04 | 78.81D1 - Failure to maintain control of anticipated gas storage reservoir pressures while drilling through reservoir or protective area | Administrative | Actually 78.81 (a)(2) + (3) |
2321166 | 710144 | 11/04/2014 | 2014-11-04 | 78.85 - Inadequate, insufficient, and/or improperly installed cement | Environmental Health & Safety | Actually 78.85(a)(5) |
2321166 | 710146 | 11/04/2014 | 2014-11-04 | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | Administrative | |
2321166 | 799775 | 11/04/2014 | 2014-11-04 | CSL 401 - PROHIBITION AGAINST OTHER POLLUTIONS - Discharged substance of any kind or character resulting in pollution of Waters of the Commonwealth. | Environmental Health & Safety | |
2619915 | 792593 | 2014-11-04 | 78.86 | Environmental Health & Safety | Chief is in process of Plugging this well to address outsatanding violation(s). |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
592428 | 261032 | NOV - Notice of Violation | |||||
592429 | 261032 | NOV - Notice of Violation | |||||
592430 | 261032 | NOV - Notice of Violation | |||||
592431 | 261032 | NOV - Notice of Violation | |||||
710142 | 317500 | NOV - Notice of Violation | |||||
710142 | 358810 | COA - Consent Order and Agreement | 2017-10-23 | $178,622.00 | $178,622.00 | ||
710143 | 317500 | NOV - Notice of Violation | |||||
710143 | 358810 | COA - Consent Order and Agreement | 2017-10-23 | $178,622.00 | $178,622.00 | ||
710144 | 317500 | NOV - Notice of Violation | |||||
710146 | 317500 | NOV - Notice of Violation | |||||
710146 | 358810 | COA - Consent Order and Agreement | 2017-10-23 | $178,622.00 | $178,622.00 | ||
799775 | 317500 | NOV - Notice of Violation | Administrative Close Out | 2017-10-23 | |||
799775 | 358810 | COA - Consent Order and Agreement | 2017-10-23 | $178,622.00 | $178,622.00 |
For data sources see[9]