X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0274280807000"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0274280807000
 
| Well ID: 0274280807000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.2905, -113.9051042 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.291622, -113.904350 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/07-08-027-28W4/0
 +
|-
 +
| Location Alias: 00/07-08-27-28 W4M
 +
|-
 +
| Location Alias 2: 00/07-08-027-28 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 027
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 28
 +
|-
 +
| Section: 08
 +
|-
 +
| County/Municipality: [[Rocky View County,_Alberta|Rocky View County]]
 
|-
 
|-
 
| Well Name: PW GAS CROSS 7-8-27-28
 
| Well Name: PW GAS CROSS 7-8-27-28
 
|-
 
|-
| Operator:
+
| Operator Name: [[TAQA North Ltd.]]
 +
|-
 +
| License Number: 0073383
 
|-
 
|-
 
| License Date: 1978-12-08
 
| License Date: 1978-12-08
 
|-
 
|-
| Final Drilling Date: 1979-02-18
+
| License Status: Abandoned
 +
|-
 +
| Spud Date: 1979-01-15
 +
|-
 +
| Final Drill Date: 1979-02-18
 +
|-
 +
| Well Total Depth: 2660.00 m
 +
|-
 +
| Surface Hole Latitude: 51.291622
 +
|-
 +
| Surface Hole Longitude: -113.904350
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1978-12-08
 +
| Obtained License
 +
|-
 +
| 1979-02-18
 +
| Finished Drilling
 +
|-
 +
| 1979-02-19
 +
| Drill Stem Test Performed
 +
|-
 +
| 1979-02-21
 +
| Production Casing Operation Performed
 +
|-
 +
| 1979-06-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1979-06-01
 +
| Well Log Performed
 +
|-
 +
| 1979-06-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1979-06-04
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1979-06-07
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1979-07-11
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2012-01-10
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-01-10
 +
| Plug Back Performed
 +
|-
 +
| 2012-01-10
 +
| Well Log Performed
 +
|-
 +
| 2012-01-10
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2012-01-11
 +
| Well Log Performed
 +
|-
 +
| 2012-01-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-01-13
 +
| Well Log Performed
 +
|-
 +
| 2012-01-15
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2012-01-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-01-19
 +
| Well Log Performed
 +
|-
 +
| 2012-01-20
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2012-01-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-01-25
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-01-25
 +
| Well Log Performed
 +
|-
 +
| 2012-01-31
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2012-01-31
 +
| Well Log Performed
 +
|-
 +
| 2012-02-03
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2012-02-09
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-02-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-02-09
 +
| Plug Back Performed
 +
|-
 +
| 2012-02-11
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-02-11
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2012-02-11
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2012-02-12
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Total Depth: 2660.0m
+
| 2012-02-13
 +
| Perforation Treatment Performed - Cement Plug
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 2012-02-13
 +
| Perforation Treatment Performed - Cement Squeeze
 
|-
 
|-
| Status: Abandoned
+
| 2012-02-14
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Well Type: Not Applicable
+
| 2012-02-14
 +
| Well Log Performed
 
|-
 
|-
| Configuration: Vertical
+
| 2012-02-15
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Violations:
+
| 2012-02-17
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
| Latitude: 51.2905
+
| 2012-02-17
 +
| Perforation Treatment Performed - Cement Squeeze
 
|-
 
|-
| Longitude: -113.9051042
+
| 2012-02-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-02-23
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-02-24
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2012-02-24
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-02-25
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2012-04-24
 +
| Well Abandoned
 +
|-
 +
| 2012-04-24
 +
| Well Mode changed to Abandoned
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1979-06-01
 +
| Perforation
 +
| style="text-align: right;" | 2626.20
 +
| style="text-align: right;" | 2635.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2012-01-22
 +
| Perforation
 +
| style="text-align: right;" | 2556.00
 +
| style="text-align: right;" | 2557.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-01-25
 +
| Perforation
 +
| style="text-align: right;" | 2579.00
 +
| style="text-align: right;" | 2580.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-01-31
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2579.00
 +
| style="text-align: right;" | 2580.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-03
 +
| Cement Plug
 +
| style="text-align: right;" | 2357.00
 +
| style="text-align: right;" | 2579.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-09
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2344.00
 +
| style="text-align: right;" | 2345.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-09
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1323.00
 +
| style="text-align: right;" | 1330.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-09
 +
| Perforation
 +
| style="text-align: right;" | 1321.00
 +
| style="text-align: right;" | 1323.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-02-09
 +
| Perforation
 +
| style="text-align: right;" | 1017.00
 +
| style="text-align: right;" | 1019.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-02-11
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1321.00
 +
| style="text-align: right;" | 1323.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-11
 +
| Cement Plug
 +
| style="text-align: right;" | 1019.00
 +
| style="text-align: right;" | 1321.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-06-02
 +
| Perforation
 +
| style="text-align: right;" | 2618.00
 +
| style="text-align: right;" | 2626.20
 +
| style="text-align: right;" | 7
 +
|-
 +
| 2012-02-11
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1017.00
 +
| style="text-align: right;" | 1019.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-11
 +
| Cement Plug
 +
| style="text-align: right;" | 933.00
 +
| style="text-align: right;" | 1017.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-11
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 895.00
 +
| style="text-align: right;" | 905.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-12
 +
| Perforation
 +
| style="text-align: right;" | 893.00
 +
| style="text-align: right;" | 895.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-02-12
 +
| Perforation
 +
| style="text-align: right;" | 724.00
 +
| style="text-align: right;" | 726.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-02-13
 +
| Cement Squeeze
 +
| style="text-align: right;" | 893.00
 +
| style="text-align: right;" | 895.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-13
 +
| Cement Plug
 +
| style="text-align: right;" | 726.00
 +
| style="text-align: right;" | 893.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-13
 +
| Cement Squeeze
 +
| style="text-align: right;" | 724.00
 +
| style="text-align: right;" | 726.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-13
 +
| Cement Plug
 +
| style="text-align: right;" | 619.00
 +
| style="text-align: right;" | 724.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-14
 +
| Perforation
 +
| style="text-align: right;" | 594.00
 +
| style="text-align: right;" | 596.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 1979-06-04
 +
| Acid Treatment
 +
| style="text-align: right;" | 2618.00
 +
| style="text-align: right;" | 2635.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-15
 +
| Perforation
 +
| style="text-align: right;" | 508.00
 +
| style="text-align: right;" | 510.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-02-17
 +
| Cement Squeeze
 +
| style="text-align: right;" | 594.00
 +
| style="text-align: right;" | 596.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-17
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 494.00
 +
| style="text-align: right;" | 591.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-17
 +
| Perforation
 +
| style="text-align: right;" | 485.00
 +
| style="text-align: right;" | 487.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-02-23
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 462.00
 +
| style="text-align: right;" | 480.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-24
 +
| Perforation
 +
| style="text-align: right;" | 315.00
 +
| style="text-align: right;" | 316.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-02-24
 +
| Cement Squeeze
 +
| style="text-align: right;" | 315.00
 +
| style="text-align: right;" | 316.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-02-25
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 301.00
 +
| style="text-align: right;" | 310.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-06-07
 +
| Acid Treatment
 +
| style="text-align: right;" | 2618.00
 +
| style="text-align: right;" | 2635.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-01-10
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2580.00
 +
| style="text-align: right;" | 2595.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-01-13
 +
| Perforation
 +
| style="text-align: right;" | 1001.00
 +
| style="text-align: right;" | 1003.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-01-15
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1001.00
 +
| style="text-align: right;" | 1003.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-01-19
 +
| Perforation
 +
| style="text-align: right;" | 2555.00
 +
| style="text-align: right;" | 2556.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2012-01-20
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2555.00
 +
| style="text-align: right;" | 2556.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2012-04-24
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 18:19, 29 January 2021

Well Details

Well ID: 0274280807000
Loading map...
Location: 00/07-08-027-28W4/0
Location Alias: 00/07-08-27-28 W4M
Location Alias 2: 00/07-08-027-28 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 28
Section: 08
County/Municipality: Rocky View County
Well Name: PW GAS CROSS 7-8-27-28
Operator Name: TAQA North Ltd.
License Number: 0073383
License Date: 1978-12-08
License Status: Abandoned
Spud Date: 1979-01-15
Final Drill Date: 1979-02-18
Well Total Depth: 2660.00 m
Surface Hole Latitude: 51.291622
Surface Hole Longitude: -113.904350

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-12-08 Obtained License
1979-02-18 Finished Drilling
1979-02-19 Drill Stem Test Performed
1979-02-21 Production Casing Operation Performed
1979-06-01 Perforation Treatment Performed - Jet Perforation
1979-06-01 Well Log Performed
1979-06-02 Perforation Treatment Performed - Jet Perforation
1979-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-11 Well Mode changed to Drilled and Cased
2012-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-10 Plug Back Performed
2012-01-10 Well Log Performed
2012-01-10 Well Mode changed to Abandoned Zone
2012-01-11 Well Log Performed
2012-01-13 Perforation Treatment Performed - Jet Perforation
2012-01-13 Well Log Performed
2012-01-15 Perforation Treatment Performed - Cement Squeeze
2012-01-19 Perforation Treatment Performed - Jet Perforation
2012-01-19 Well Log Performed
2012-01-20 Perforation Treatment Performed - Cement Squeeze
2012-01-22 Perforation Treatment Performed - Jet Perforation
2012-01-25 Perforation Treatment Performed - Jet Perforation
2012-01-25 Well Log Performed
2012-01-31 Perforation Treatment Performed - Cement Squeeze
2012-01-31 Well Log Performed
2012-02-03 Perforation Treatment Performed - Cement Plug
2012-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-09 Perforation Treatment Performed - Jet Perforation
2012-02-09 Plug Back Performed
2012-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-11 Perforation Treatment Performed - Cement Plug
2012-02-11 Perforation Treatment Performed - Cement Squeeze
2012-02-12 Perforation Treatment Performed - Jet Perforation
2012-02-13 Perforation Treatment Performed - Cement Plug
2012-02-13 Perforation Treatment Performed - Cement Squeeze
2012-02-14 Perforation Treatment Performed - Jet Perforation
2012-02-14 Well Log Performed
2012-02-15 Perforation Treatment Performed - Jet Perforation
2012-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-17 Perforation Treatment Performed - Cement Squeeze
2012-02-17 Perforation Treatment Performed - Jet Perforation
2012-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-24 Perforation Treatment Performed - Cement Squeeze
2012-02-24 Perforation Treatment Performed - Jet Perforation
2012-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-04-24 Well Abandoned
2012-04-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-06-01 Perforation 2626.20 2635.50 7
2012-01-22 Perforation 2556.00 2557.00 17
2012-01-25 Perforation 2579.00 2580.00 17
2012-01-31 Cement Squeeze 2579.00 2580.00 0
2012-02-03 Cement Plug 2357.00 2579.00 0
2012-02-09 Packing Device Capped w/Cement 2344.00 2345.00 0
2012-02-09 Packing Device Capped w/Cement 1323.00 1330.00 0
2012-02-09 Perforation 1321.00 1323.00 17
2012-02-09 Perforation 1017.00 1019.00 17
2012-02-11 Cement Squeeze 1321.00 1323.00 0
2012-02-11 Cement Plug 1019.00 1321.00 0
1979-06-02 Perforation 2618.00 2626.20 7
2012-02-11 Cement Squeeze 1017.00 1019.00 0
2012-02-11 Cement Plug 933.00 1017.00 0
2012-02-11 Packing Device Capped w/Cement 895.00 905.00 0
2012-02-12 Perforation 893.00 895.00 17
2012-02-12 Perforation 724.00 726.00 17
2012-02-13 Cement Squeeze 893.00 895.00 0
2012-02-13 Cement Plug 726.00 893.00 0
2012-02-13 Cement Squeeze 724.00 726.00 0
2012-02-13 Cement Plug 619.00 724.00 0
2012-02-14 Perforation 594.00 596.00 17
1979-06-04 Acid Treatment 2618.00 2635.50 0
2012-02-15 Perforation 508.00 510.00 17
2012-02-17 Cement Squeeze 594.00 596.00 0
2012-02-17 Packing Device Capped w/Cement 494.00 591.00 0
2012-02-17 Perforation 485.00 487.00 17
2012-02-23 Packing Device Capped w/Cement 462.00 480.00 0
2012-02-24 Perforation 315.00 316.00 17
2012-02-24 Cement Squeeze 315.00 316.00 0
2012-02-25 Packing Device Capped w/Cement 301.00 310.00 0
1979-06-07 Acid Treatment 2618.00 2635.50 0
2012-01-10 Packing Device Capped w/Cement 2580.00 2595.00 0
2012-01-13 Perforation 1001.00 1003.00 17
2012-01-15 Cement Squeeze 1001.00 1003.00 0
2012-01-19 Perforation 2555.00 2556.00 17
2012-01-20 Cement Squeeze 2555.00 2556.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-24 No Incident Encountered 0.00 0.00

For data sources see[5]

References